Lily Lake Dam Hydrologic Analysis

Month-Year PublishedSeptember 1991
Online Availability
not available
Short Description

In accordance with RCW 43.21A.062(2), the Dam Safety Section (DSS) conducted a periodic inspection of the Lily Lake Dam project on July 25, 1991. As part of the inspection, the DSS performed a hydrologic analysis of the drainage basin to determine the adequacy of the project's spillways. The following is a summary of that analysis.

Publication NumberOFTR 91-14
Author(s)Douglas L. Johnson
ContactBarb Anderson, (360) 407-6607
Print Availability
Request from the program.
Number of pages 42
Keywords dam, dam safety, drainage, Inspection, safety, water, water resource