Publication Summary

Title

Stemilt Project Dams Hydrologic Analysis

Month-Year PublishedNovember 1991
Online Availability
not available
Short Description

In accordance with RCW 43.21A.064(2), the Dam Safety Section (DSS) conducted a periodic inspection of the Stemilt Project Reservoir Dams on July 25 and 26, 1991. As part of the inspection, the DSS performed a hydrologic analysis of the drainage basin to determine the adequacy of the project's spillways. This report summarizes that analysis.

Publication NumberOFTR 91-16
Author(s)Bruce Baker
ContactBarb Anderson, (360) 407-6607
Print Availability
Request from the program.
Number of pages 68
Keywords dam, dam safety, drainage, hydrology, Inspection, safety, water, water resource
Location(s)
Wenatchee
map of Washington state showing place locations
Related Web ContentWater Resources Program

This page last updated November 4, 2009