Publication Summary

Title

Chaplain Lake North & South Dams Second Periodic Inspection Report

Month-Year PublishedFebruary 1997
Online Availability
not available
Short Description

The report presents the results of the second periodic inspection and safety evaluation of the Chaplain Lake South and North Dams. The report provides:

  • Background information,
  • A description of the project,
  • Results of the April 13, 1995 inspection,
  • Engineering evaluation and the analyses of the design of the project,
  • A listing of deficiencies from the last inspection, and their current status,
  • Required remedial actions based on the findings from the current inspection.

  • Publication NumberOFTR 97-01
    Author(s)Douglas L. Johnson, Jerald M. LaVassar
    ContactBarb Anderson, (360) 407-6607
    Print Availability
    Request from the program.
    Number of pages 100
    Keywords construction, dam, dam construction, dam inspection, dam safety, progress report, safety, water, water resource
    Location(s)
    Everett
    map of Washington state showing place locations
    Related Web ContentWater Resources Program

    This page last updated June 26, 2008