Publication Summary

Title

Wenas Dam Second Periodic Inspection Report

Month-Year PublishedMarch 1997
Online Availability
not available
Short Description

The report presents the results of the second periodic inspection and safety evaluation of the Wenas Dam. The report provides:

  • Background information,
  • A description of the project,
  • Results of the June 6, 1995 inspection, and July 25, 1996 Flood Damage Survey,
  • A listing of deficiencies from the last inspection, and their current status,
  • Required remedial actions based on the findings from the current inspection.

  • Publication NumberOFTR 97-03
    Author(s)Douglas L. Johnson, Jerald M. LaVassar
    ContactBarb Anderson, (360) 407-6607
    Print Availability
    Request from the program.
    Number of pages 45
    Keywords construction, dam, dam construction, dam inspection, dam safety, Inspection, safety, water, water resource
    Related Web ContentWater Resources Program

    This page last updated June 26, 2008