Publication Summary

Title

Tahuya Lake Dam Flood Hazard Assessment

Month-Year PublishedAugust 1998
Online Availability
not available
Short Description

In accordance with RCW 43.21A.064(2), the Dam Safety Office (DSO) conducted a periodic inspection of the Tahuya Lake Dam project on July 21, 1998. As part of the inspection, the DSS performed a hydrologic analysis to determine the adequacy of the project's spillway, a dam failure assessment to determine the consequences of a failure, and developed some repair options to increase spillway capacity. This report summarizes that analysis.

Publication NumberOFTR 98-03
Author(s)Douglas L. Johnson
ContactBarb Anderson, (360) 407-6607
Print Availability
Request from the program.
Number of pages 81
Keywords construction, dam, dam construction, dam inspection, dam safety, flood, hydrology, Inspection, water, water resource
Location(s)
Bremerton
map of Washington state showing place locations
Related Web ContentWater Resources Program

This page last updated June 26, 2008