
| Title | Tahuya Lake Dam Flood Hazard Assessment | |||
| Month-Year Published | August 1998 | |||
| Online Availability |
not available
| |||
| Short Description |
In accordance with RCW 43.21A.064(2), the Dam Safety Office (DSO) conducted a periodic inspection of the Tahuya Lake Dam project on July 21, 1998. As part of the inspection, the DSS performed a hydrologic analysis to determine the adequacy of the project's spillway, a dam failure assessment to determine the consequences of a failure, and developed some repair options to increase spillway capacity. This report summarizes that analysis. | |||
| Publication Number | OFTR 98-03 | |||
| Author(s) | Douglas L. Johnson | |||
| Contact | Barb Anderson, (360) 407-6607 | |||
| Print Availability | ||||
| Number of pages | 81 | |||
| Keywords | construction, dam, dam construction, dam inspection, dam safety, flood, hydrology, Inspection, water, water resource | |||
| Location(s) |
| |||
| Related Web Content | Water Resources Program | |||
This page last updated November 4, 2009
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.