Upper Wheeler Reservoir Dams Periodic Inspection Report

Month-Year PublishedOctober 1998
Online Availability
not available
Short Description

The report presents the results of the second periodic inspection and safety evaluation of the Upper Wheeler Reservoir Main Dam and Saddle Dam by the Ecology Dam Safety Office (DSO). The report provides:

  • Background information,
  • A description of the project,
  • Results of the July 23, 1998 inspection,
  • Engineering evaluation and analyses of the design of the project,
  • Required remedial actions based on the findings from the current inspection.

  • Publication NumberOFTR 98-04
    Author(s)Douglas L. Johnson, Jerald LaVassar
    ContactBarb Anderson, (360) 407-6607
    Print Availability
    Request from the program.
    Number of pages 44
    Keywords construction, dam, dam construction, dam inspection, dam safety, Inspection, water, water resource
    Location(s)
    Wenatchee
    map of Washington state showing place locations
    Related Web ContentWater Resources Program

    This page last updated November 4, 2009