Topic: Quality assurance project plans

This list updated November 23, 2009

Title (link to summary) Number      Date (released or updated)
Quality Assurance Project Plan: Assessment of Aquatic Toxicity in North Creek, Gig Harbor.09-03-132November 2009
Quality Assurance Project Plan: Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River09-03-119November 2009
Quality Assurance Project Plan: Effects of Conventional versus Minimum Tillage on Groundwater Nitrate at a Manured Grass Field09-03-126October 2009
Quality Assurance Project Plan: Lake Ozette Watershed PBT Monitoring: Speciated Mercury in Stream Surface Waters09-03-129October 2009
Quality Assurance Project Plan: Deschutes River Continuous Nitrate Monitoring09-03-130October 2009
Errata: Control of Toxic Chemicals in Puget Sound, Phase 2: Improved Estimates of Loadings from Dischargers of Municipal and Industrial Wastewater08-10-089bOctober 2009
Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway.09-03-124October 2009
Quality Assurance Project Plan: Lower White River pH Nutrients Study.09-03-131October 2009
Quality Assurance Project Plan: Leach Creek (Pierce County) Mercury and Copper Monitoring.09-03-128September 2009
Automated Method Data Documentation and Validation Procedure95-201CSeptember 2009
Quality Assurance Project Plan: White Salmon River Fecal Coliform Bacteria Compliance Monitoring09-03-127September 2009
Quality Assurance Project Plan: Monitoring Seep Water from the Port Angeles Landfill to an Intertidal Area09-03-125September 2009
Quality Assurance Project Plan: The Puget Sound Assessment and Monitoring Program Sediment Monitoring Component.09-03-121August 2009
Addendum to Quality Assurance Project Plan: McAllister Creek Source Identification: Water Quality Monitoring for Fecal Coliform Bacteria and Nitrate+Nitrite-N in Medicine Creek07-10-105-AddendumAugust 2009
Quality Assurance Project Plan: Control of Toxic Chemicals in Puget Sound Phase 3: Characterization of Toxic Chemicals in Puget Sound and Selected Major Tributaries09-03-118August 2009
Quality Assurance Project Plan: Potential Impacts from Mercury Used in Historic Gold Mining on Six Rivers and Streams09-03-123August 2009
Quality Assurance Project Plan: Skagit-Samish Watershed Intensive Surface Water Sampling for Pesticides in Salmonid-Bearing Streams09-03-120August 2009
Quality Assurance Project Plan: McAllister Creek Water Quality Investigation for Fecal Coliform Bacteria09-10-063August 2009
Quality Assurance Project Plan: Nooksack Basin Prediction of Gaged Flows by Modeling09-03-117August 2009
Quality Assurance Project Plan for Phase 3: Characterization of Loadings via Surface Runoff09-10-052August 2009
Quality Assurance Project Plan: Crab Creek Alternate Water Supply Route Study: Water Quality Monitoring09-03-116July 2009
Quality Assurance Project Plan, Supplemental: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study09-03-114July 2009
Quality Assurance Project Plan: Grayland Ditch: An Evaluation of Organophosphate Pesticides and Pesticide Test Kits09-03-115July 2009
Quality Assurance Project Plan: Trends Monitoring for Organic PBTs: Revisions for the 2009 Spring Monitoring Effort09-03-113May 2009
Quality Assurance Project Plan: Sumas-Blaine Surficial Aquifer Long-Term Ambient Groundwater Monitoring09-03-111April 2009
Quality Assurance Project Plan: Puget Sound Dissolved Oxygen Modeling Study: Intermediate-scale Model Development09-03-110April 2009
Quality Assurance Project Plan: Audubon Lake's Connection to Upper Crab Creek (Lincoln County): Source Assessment09-03-112April 2009
Quality Assurance Project Plan: Okanogan River DDT and PCB Total Maximum Daily Load Effectiveness Monitoring09-03-107April 2009
Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 200609-10-034April 2009
Addendum to Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring05-03-201ADD1April 2009
Quality Assurance Project Plan: PBDE Flame Retardants in Spokane River Fish Tissues and Osprey Eggs09-03-108April 2009
Quality Assurance Project Plan: New Zealand Mud Snail Potassium-Chloride and Magnesium-Chloride Bioassay.09-03-109April 2009
Addendum 3 to Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat in Two Index Watersheds03-03-104ADD3April 2009
Quality Assurance Project Plan: General Characterization of PCBs in South Lake Washington Sediments.09-03-106March 2009
Quality Assurance Project Plan: Innovative Temperature Total Maximum Daily Load Pilot Study09-03-105March 2009
Addendum to the Quality Assurance Project Plan for Control of Toxic Chemicals in Puget Sound, Phase 3: Priority Pollutant Scans of Ten POTWs09-10-001aMarch 2009
Quality Assurance Project Plan: Dungeness Bay and Lower Dungeness River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Effectiveness Monitoring09-03-104February 2009
Quality Assurance Project Plan for Control of Toxic Chemicals in Puget Sound, Phase 3: Priority Pollutant Scans of Ten POTWs09-10-001February 2009
Quality Assurance Project Plan: Puget Sound Dissolved Oxygen Modeling Study: Large-scale Model Development.09-03-103January 2009
Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation01-03-064ADD1January 2009
Water Quality Study Design (Quality Assurance Project Plan): Liberty Bay Tributaries Fecal Coliform Bacteria Total Maximum Daily Load09-03-102January 2009
Quality Assurance Project Plan: Little Spokane River Fish Hatchery, Water Quality Monitoring for Nutrients08-03-120December 2008
Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment08-03-119December 2008
Quality Assurance Project Plan: Goosmus Creek Metals and Conventional Parameters Water Quality Monitoring08-03-118November 2008
Focus on: Side-by-Side River and Stream Sampling Program08-03-028October 2008
Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design08-03-117October 2008
Quality Assurance Project Plan: Screening for Blue-Green Algae Toxins in Lake Fish Tissues.08-03-116October 2008
Quality Assurance Project Plan: Loading of Contaminants to the Lower Duwamish Waterway from Suspended Sediments in the Green River08-03-114September 2008
Quality Assurance Project Plan: High-resolution, Pore-water Sampling Near the Groundwater/Surface Water Interface08-03-115September 2008
Quality Assurance Project Plan: Receiving Water Study for Puget Sound Boatyards: Metals Translators and Hardness08-03-108September 2008
Addendum to Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load08-03-105ADD1September 2008
Quality Assurance Project Plan: Pharmaceuticals and Personal Care Products in Wastewater Treatment Systems08-03-112August 2008
Quality Assurance Project Plan: Evaluation of Candidate Freshwater Sediment Reference Sites08-03-111July 2008
Quality Assurance Project Plan: Burnt Bridge Creek Fecal Coliform Bacteria, Dissolved Oxygen, and Temperature Total Maximum Daily Load-Water Quality Study Design08-03-110July 2008
Quality Assurance Project Plan: Union River Fecal Coliform Total Maximum Daily Load Effectiveness Monitoring08-03-109July 2008
Addendum to Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies07-03-103ADD1June 2008
Quality Assurance Project Plan: Lead and Copper Concentrations In North Creek, Gig Harbor08-03-106May 2008
Addendum #1 to Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores.06-03-113ADD1May 2008
Addendum #1 to Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program07-03-104ADD1May 2008
Quality Assurance Project Plan: PBT Monitoring: Measuring Perfluorinated Compounds in Washington Rivers and Lakes08-03-107May 2008
Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load: Phase 1 Water Quality Study Design08-03-105March 2008
Quality Assurance Project Plan: Surface Sediment and Fish Tissue Chemistry in Greater Elliott Bay (Seattle)08-03-103February 2008
Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load08-03-104February 2008
Quality Assurance Project Plan: Potholes Reservoir Assessment of Dieldrin and Other Chlorinated Contaminants08-03-101February 2008
Quality Assurance Project Plan: PCB and Dioxin Levels in Resident Fish from Washington Background Lakes and Rivers08-03-102January 2008
Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Dobbs Creek08-10-009January 2008
Quality Assurance Project Plan: McAllister Creek Source Identification: Water Quality Monitoring for Fecal Coliform Bacteria and Nitrate+Nitrite-N in Medicine Creek07-10-105December 2007
Quality Assurance Project Plan: Wenatchee and Mid-Columbia Basins, Impact of Copper Use on Receiving Waters07-03-112November 2007
Quality Assurance Project Plan: Assessment of Sediment Toxicity near Post Point (Bellingham Bay)07-03-113October 2007
Addendum #3 to Quality Assurance Project Plan: South Puget Sound Water Quality Study Phase 2: Dissolved Oxygen07-03-101ADD3September 2007
Addendum #2 to Quality Assurance Project Plan: Shelton Cleaners and Laundry.02-03-078ADD2September 2007
Addendum #2 to Quality Assurance Project Plan: South Puget Sound Water Quality Study Phase 2: Dissolved Oxygen.07-03-101ADD2September 2007
Quality Assurance Project Plan: Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study-Water Quality Study Design07-03-110August 2007
Quality Assurance Project Plan: Dieldrin and PCB Monitoring of Wastewater Treatment Plants in the Palouse River Watershed07-03-111August 2007
Addendum to Quality Assurance Project Plan: South Puget Sound Water Quality Study, Phase 2: Dissolved Oxygen07-03-101ADD1August 2007
Quality Assurance Project Plan: Lake Chelan Wapato Basin Total Phosphorus TMDL Effectiveness Monitoring, 200707-03-109August 2007
Quality Assurance Project Plan: South Puget Sound Water Quality Study Phase 2: Dissolved Oxygen07-03-101August 2007
Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Kennedy Creek07-10-059August 2007
Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study.07-03-107July 2007
Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design07-03-108July 2007
Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Pierre Creek and Burns Creek07-10-036July 2007
Quality Assurance Project Plan: Palouse River Temperature Total Maximum Daily Load Study07-03-106June 2007
Quality Assurance Project Plan: Marion Drain Intensive Surface Water Sampling for Pesticides In Salmonid-Bearing Streams07-03-105June 2007
Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program07-03-104June 2007
Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies07-03-103March 2007
Addendum to Quality Assurance Project Plan: Surface Water Monitoring Program for Pesticides in Salmonid Bearing Streams: Addition of Wenatchee and Entiat Watersheds in the Upper Columbia Basin.03-03-104ADD2February 2007
Addendum to Quality Assurance Project Plan: American Plating Post-Interim Action Monitoring.04-03-105ADDFebruary 2007
Quality Assurance Project Plan: Bertrand Creek and Meadowdale Areas (Whatcom County) Follow-Up Study of EDB and 1,2-DCP in Residential Wells.07-03-102January 2007
Addendum to Quality Assurance Project Plan: Naches River Temperature Total Daily Maximum Load Study.04-03-110ADDJanuary 2007
Addendum to Quality Assurance Project Plan: Groundwater, Soil, and Crop Nitrogen at a Field Where Dairy Waste is Used as Fertilizer in Whatcom County04-03-112ADDJanuary 2007
Quality Assurance Project Plan: Using Sediment Profile Imaging (SPI) to Evaluate Sediment Quality at Two Puget Sound Cleanup Sites: Part I - Lower Duwamish Waterway06-03-116December 2006
Quality Assurance Project Plan: Using Sediment Profile Imaging (SPI) to Evaluate Sediment Quality at Two Puget Sound Cleanup Sites: Part II: Port Gamble Bay06-03-117December 2006
Quality Assurance Project Plan: Feasibility of using Sediment Profile Imaging Technology to Evaluate Sediment Quality and Impacts to Benthic Communities found at two Contaminated Sediment Cleanup Sites in the Puget Sound.06-03-119December 2006
Quality Assurance Project Plan: Puyallup River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Study06-03-115December 2006
Quality Assurance Project Plan: Similkameen River and Palmer Lake Investigation of Arsenic in Fish Tissue06-03-118December 2006
PCB Monitoring at Walla Walla Wastewater Treatment Plants06-03-114October 2006
Addendum to Quality Assurance Project Plan: Pend Oreille River Temperature TMDL04-03-109ADDOctober 2006
Addendum to Quality Assurance Project Plan: Montesano Groundwater Investigation of Leaking Underground Storage Tank Sites04-03-114ADDOctober 2006
Sampling and Analysis Plan and Quality Assurance Project Plan: Green River and Newaukum Creek Temperature and Dissolved Oxygen Study06-03-110October 2006
Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores.06-03-113October 2006
Sampling and Analysis Plan and Quality Assurance Project Plan: Bear/Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load Study06-03-107September 2006
Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study06-03-112September 2006
Quality Assurance Project Plan: Measuring Copper Concentrations in Two Puget Sound Marinas06-03-109September 2006
Quality Assurance Project Plan: Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish - 2006: Assessing Progress Toward TMDL Targets and Updating the Fish Consumption Advisory06-03-111September 2006
Quality Assurance Project Plan: Puyallup and White Rivers Temperature and Dissolved Oxygen Monitoring06-03-204August 2006
Quality Assurance Project Plan: Old Stillaguamish River Multi-Parameter Total Maximum Daily Load Study06-03-108August 2006
Quality Assurance Project Plan: Snoqualmie River Temperature Total Maximum Daily Load Study06-03-106July 2006
Addendum to Quality Assurance Project Plan: Shelton Laundry and Cleaners.02-03-078ADDJuly 2006
Quality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study06-03-105June 2006
Quality Assurance Project Plan: South Fork Palouse River Temperature Total Maximum Daily Load Study06-03-104June 2006
Quality Assurance Project Plan: Measuring Mercury Trends in Freshwater Fish in Washington State06-03-103April 2006
Quality Assurance Project Plan: Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load Study06-03-102March 2006
Addendum to Quality Assurance Project Plan for Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams: Addition of Skagit-Samish Watersheds, and Extension of Program through June 2009.03-03-104ADDMarch 2006
Quality Assurance Project Plan: Willapa River Fecal Coliform Bacteria Verification Study06-03-202February 2006
Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study06-03-201January 2006
Quality Assurance Project Plan: Toxics in Stormwater Runoff from Puget Sound Boatyards05-03-118December 2005
Quality Assurance Project Plan: PCBs and Other Contaminants in Spokane River Fish, 200505-03-120December 2005
Quality Assurance Project Plan: Assessment of Ambient Groundwater Quality Conditions in the Surficial Unconsolidated Sedimentary Aquifer of the Moxee Valley, Yakima County, Washington05-03-119December 2005
Quality Assurance Project Plan: Fourth Screening Investigation of Water and Sediment Quality in Creeks from Selected Washington Mining Districts05-10-088December 2005
Quality Assurance Project Plan: Continuous Stream Temperature Monitoring by the Freshwater Monitoring Unit05-03-202December 2005
Quality Assurance Project Plan: Comparison of Stream Temperature Monitoring Protocols used by the Environmental Monitoring and Trends Section05-03-205December 2005
Quality Assurance Project Plan: Hood Canal Dissolved Oxygen Program Integrated Assessment and Modeling Study Year 1 Activities05-03-114November 2005
Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study05-03-115November 2005
Quality Assurance Project Plan: South Puget Sound Fish and Shellfish Tissue Verification of 303(d) Listings05-03-116November 2005
Quality Assurance Project Plan: Squalicum Harbor Tributyltin (TBT) Investigation05-03-117November 2005
Quality Assurance Project Plan: PBT Monitoring: Measuring PBDE Levels in Washington Rivers and Lakes05-03-113September 2005
Quality Assurance Project Plan: Metals Concentrations from Stormwater Runoff in an Industrial Area Creek05-03-112September 2005
Quality Assurance Project Plan: Pataha Creek Effectiveness Monitoring Total Maximum Daily Load Study05-03-203August 2005
Quality Assurance Project Plan: Cornet Bay Intertidal Contaminant Screening Survey05-03-109June 2005
Quality Assurance Project Plan: Upper Yakima Basin Temperature Total Maximum Daily Load Study05-03-111June 2005
Quality Assurance Project Plan: East Fork Lewis River Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study05-03-110June 2005
Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish05-03-106May 2005
Quality Assurance Project Plan: Methoprene Monitoring in Grant County Mosquito Control District #105-03-108May 2005
Quality Assurance Project Plan: Bioaccumulative Chemicals in Hatchery Feed and Hatchery Fish05-03-104May 2005
Quality Assurance Project Plan: Total Maximum Daily Load Analysis for Temperature in Tributaries to Oakland Bay-Hammersley Inlet: Mill Creek, Cranberry Creek, and Johns Creek05-03-107May 2005
Quality Assurance Project Plan: Investigation of Petroleum Products in Black Lake Sediment and Surface Water from Underground Tanks.05-03-105April 2005
Quality Assurance Project Plan: A Survey of Zinc Concentrations in Industrial Stormwater Runoff05-03-103April 2005
Quality Assurance Project Plan: Saginaw Mill Groundwater Monitoring05-03-102February 2005
Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring05-03-201February 2005
Quality Assurance Project Plan: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study05-03-101January 2005
Quality Assurance Project Plan: Post Point, Bellingham Bay Sediment Sulfide and Toxicity Assessment04-03-116December 2004
Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Construction Sites: Year 204-03-118December 2004
Quality Assurance Project Plan: Ostrich Bay Sediment Toxicity Evaluation04-03-117December 2004
Quality Assurance Project Plan: Groundwater, Soil, and Crop Nitrogen at a Field Where Dairy Waste is Used as Fertilizer in Whatcom County.04-03-112November 2004
Quality Assurance Project Plan: Verification of 303(d) Listings for Fish Tissue in the Skagit and Pend Oreille Rivers04-03-115November 2004
Quality Assurance Project Plan: Old Stillaguamish River Channel Diel Surveys.04-03-113October 2004
Quality Assurance Project Plan: Montesano Groundwater Investigation of Leaking Underground Storage Tank Sites.04-03-114October 2004
Quality Assurance Project Plan: Naches River Temperature Total Maximum Daily Load04-03-110September 2004
Quality Assurance Project Plan: Fecal Coliform Bacteria TMDL for Oakland Bay-Hammersley Inlet and Tributaries04-03-111September 2004
Quality Assurance Project Plan: Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell04-03-206September 2004
Quality Assurance Project Plan: Pend Oreille River Temperature Total Maximum Daily Load Technical Study04-03-109September 2004
Air Toxics Monitoring Quality Assurance Project Plan04-02-018September 2004
Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies04-03-030July 2004
Quality Assurance Project Plan: Lake Tapps Monitoring04-03-204July 2004
Quality Assurance Project Plan: Lake Bacteria Sampling Project04-03-202July 2004
Quality Assurance Project Plan: Effects of Small-Scale Gold Dredging on Metals Concentrations in the Similkameen River04-03-108July 2004
Quality Assurance Project Plan: BEACH Program04-03-205June 2004
Quality Assurance Project Plan: Tributaries to Totten, Eld, and Little Skookum Inlets Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study04-03-106May 2004
Quality Assurance Project Plan: Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study04-03-107May 2004
Quality Assurance Project Plan: Snoqualmie River Total Maximum Daily Load Effectiveness Evaluation04-03-201March 2004
Quality Assurance Project Plan: American Plating Post-Interim Action Monitoring04-03-105March 2004
PM10 Tapered Element Oscillating Microbalance Operating Procedure04-02-005March 2004
Quality Assurance Project Plan: Screening for Pharmaceuticals in Wastewater Treatment Plant Effluents, Groundwater, and Surface Water in the Sequim-Dungeness Area04-03-104February 2004
Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study04-03-103February 2004
Quality Assurance Project Plan: Groundwater Assessment Program Pilot Study, Phase 204-03-102January 2004
Quality Assurance Project Plan: Spatial Extent of Dioxin/Furan Contaminated Sediments in Dillenbaugh Creek04-03-101January 2004
Quality Assurance Project Plan: Verification of 303(d) Listed Sites in Northwest, Central, and Eastern Regions of Washington State03-03-112December 2003
Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Log Yards03-03-113December 2003
Quality Assurance Project Plan: Stormwater Quality Survey of Western Washington Construction Sites03-03-111November 2003
Quality Assurance Project Plan: Little Squalicum Creek Biological Toxicity Assessment03-03-110October 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River03-03-107October 2003
Quality Assurance Project Plan: Monitoring 303(d) Listed Pesticides, PCBs, and PAHs in the Lower Columbia River Drainage Using a Semipermeable Membrane Device03-03-108October 2003
Quality Assurance Project Plan: Groundwater Assessment Program Pilot Study, Phase 103-03-109October 2003
Quality Assurance Project Plan: Lake Bacteria Sampling Project03-03-201August 2003
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, pH, and Fecal Coliform Total Maximum Daily Load, Year 2 Technical Study03-03-106August 2003
Quality Assurance Project Plan: TMDL Effectiveness Monitoring and Water Quality Evaluation in the Lower Yakima River04-03-203July 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan03-03-105July 2003
Quality Assurance Project Plan: 2003 BEACH Pilot Project03-03-202June 2003
Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds03-03-104May 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington03-03-103April 2003
Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation03-03-102March 2003
Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site03-03-101March 2003
Quality Assurance Project Plan: Henderson and Nisqually TMDL Study03-03-100February 2003
Quality Assurance Project Plan: Lower White River Temperature Study03-10-028January 2003
Quality Assurance Project Plan: Shelton Cleaners and Laundry02-03-078December 2002
Quality Assurance Project Plan: Characterization of Groundwater Discharge to Lake Whatcom02-03-082December 2002
Quality Assurance Project Plan: Monitoring for Nitrate Trends in the Central Sumas-Blaine Surficial Aquifer02-03-084December 2002
Quality Assurance Project Plan: Squalicum Creek Toxics Screening Study02-03-083December 2002
Quality Assurance Project Plan: Screening Investigation of Water and Sediment Quality in Creeks from Ten Washington Mining Districts02-03-081October 2002
Quality Assurance Project Plan: Verification of 1998 303(d) Listing for PCBs in Budd Inlet (Inner)02-03-085October 2002
Quality Assurance Project Plan: Screening Survey of Mercury Levels in Edible Fish Tissue from Selected Lakes and Rivers of Washington State02-03-080October 2002
Quality Assurance Project Plan: Woodland Creek Temperature TMDL02-03-077September 2002
Quality Assurance Project Plan: Mercury in Sediments from Lake Whatcom and Surrounding Lakes: Determination of Spatial and Temporal Patterns and Characterization of Tributary Inputs02-03-079September 2002
Quality Assurance Project Plan: Investigation of Background Concentrations of Organic and Inorganic Arsenic in Freshwater Fish Tissue in Four Washington Lakes02-03-075September 2002
Quality Assurance Project Plan: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study02-03-076August 2002
Quality Assurance Project Plan: TMDL Technical Assessment of DDT and PCBs in the Okanogan River02-03-070August 2002
Quality Assurance Project Plan: Pesticide Reduction Evaluation for Cranberry Bog Drainage in the Grayland Area02-03-072August 2002
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load, Year 1 Technical Study02-03-069July 2002
Addendum to Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load Year 1 Technical Study02-03-069ADDJuly 2002
Quality Assurance Project Plan: Norfolk CSO Sediment Cap Recontamination Phase 1 Inspection02-03-073July 2002
Quality Assurance Project Plan: Lake Whatcom TMDL Study02-03-074July 2002
Quality Assurance Project Plan: TMDL Technical Study: Chlorinated Pesticides and PCBs in the Walla Walla River02-03-068July 2002
Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring02-03-067July 2002
Quality Assurance Project Plan: Pesticide Monitoring in the Mission Creek Basin02-03-071July 2002
Quality Assurance Project Plan: Walla Walla River Tributaries Temperature Total Maximum Daily Load02-03-066June 2002
Quality Assurance Project Plan: Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent the B&L Landfill, Milton, Washington02-03-086April 2002
Quality Assurance Project Plan: Washington State Toxics Monitoring Program, Exploratory Monitoring of Toxic Contaminants in Edible Fish Tissue and Freshwater Environments of Washington State.02-03-065April 2002
Quality Assurance Project Plan: Comparison of Toxicity in Lake Union Sediments Using Molecular DNA Techniques and Conventional Bioassay Measures02-03-089March 2002
Quality Assurance Project Plan: Analysis of Fish from Long Lake, Washington, for PCBs and Selected Metals02-03-088February 2002
Quality Assurance Project Plan: Arsenic Speciation in Puget Sound Fish and Crab02-03-087January 2002
Quality Assurance Project Plan: Stillaguamish River Temperature Total Maximum Daily Load01-03-066December 2001
Addendum to Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks: Addendum, Arsenic Sampling of Selected Washington Rivers01-03-070December 2001
Quality Assurance Project Plan: Ferndale WWTP Outfall Sediments01-03-067November 2001
Quality Assurance Project Plan: Groundwater/Surface Water Interactions In the Sammamish River: a Preliminary Analysis.01-03-068October 2001
Benthic Macroinvertebrate Biological Monitoring Protocols for Rivers and Streams: 2001 Revision01-03-028September 2001
Quality Assurance Project Plan: Sampling to Verify 303(d) Listings for Chemical Contaminants in Shellfish Tissue from Dyes Inlet and Port Washington Narrows01-03-069August 2001
Quality Assurance Project Plan: Willapa River Temperature Total Maximum Daily Load01-03-063August 2001
Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks01-03-071June 2001
Quality Assurance Project Plan: PCBs in Sediments from Selected Sites in Puget Sound01-03-072May 2001
Quality Assurance Project Plan: Reassessment of Toxicity of Lake Roosevelt Sediments01-03-073May 2001
Quality Assurance Project Plan: Stillaguamish River Basin and Port Susan Total Maximum Daily Load Evaluation Update01-03-065April 2001
Quality Assurance Project Plan: Characterization of the Groundwater Discharge to Moses Lake, Washington01-03-074April 2001
Quality Assurance Project Plan: Moses Lake Phosphorus TMDL Study01-03-075April 2001
Quality Assurance Project Plan: Freshwater Field Protocol Comparability01-03-200April 2001
Quality Assurance Project Plan: Padden Creek Pesticide Monitoring Project01-03-076March 2001
Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation01-03-064January 2001
Quality Assurance Project Plan: Colville River Fecal Coliform TMDL Study.00-03-082December 2000
Quality Assurance Project Plan: Second Screening Investigation of Water and Sediment Quality in Creeks in Washington Mining Districts00-03-083December 2000
Quality Assurance Project Plan: Ambient Ground-Water Monitoring in the West Valley area, Yakima County, Washington00-03-084December 2000
Quality Assurance Project Plan: Toxicity Testing Spokane River Sediments00-03-085December 2000
Quality Assurance Project Plan: Ambient Groundwater Monitoring in the Dungeness Watershed, Clallam County, Washington00-03-086December 2000
Quality Assurance Project Plan: Levels and Sources of Arsenic in the Similkameen River00-03-087December 2000
Quality Assurance Project Plan: Oakland Bay and Skookum Inlet Bacteria Study00-03-088December 2000
Quality Assurance Project Plan: Spokane River PCB Source Survey00-03-089December 2000
Quality Assurance Project Plan: Little Klickitat River Temperature Total Maximum Daily Load00-03-090December 2000
Quality Assurance Project Plan: Re-evaluation of Copper Impact from Wilkeson WWTP on Wilkeson Creek00-03-091December 2000
Quality Assurance Project Plan: Metals Monitoring in Quilceda and Allen Creeks, Snohomish County00-03-092December 2000
Quality Assurance Project Plan: Water Column Concentrations of Metals In South Puget Sound and Grays Harbor00-03-093December 2000
Quality Assurance Project Plan: Analyzing Carbaryl in Willapa Bay Water00-03-094December 2000
Quality Assurance Project Plan: Lower Yakima River Water Quality Model and Evaluation of the USBR Columbia River Pump Exchange Project00-03-095December 2000
Survey of Typical Soils Arsenic Concentrations In Residential Areas of University Place00-03-096December 2000
Quality Assurance Project Plan: Characterizing Surface Water/Groundwater Interactions in the Muck Creek Watershed Pierce County, Washington00-03-097December 2000
Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment00-03-081August 2000
Quality Assurance Project Plan: Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study00-03-080February 2000
Instream Biological Assessment Monitoring Protocols: Benthic Macroinvertebrates94-113June 1994

Last updated November 23, 2009