| Title (link to summary) |
Number |
Date (released or updated) |
| Quality Assurance Project Plan: Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River | 09-03-119 | November 2009 |
| Quality Assurance Project Plan: Deschutes River Continuous Nitrate Monitoring | 09-03-130 | October 2009 |
| Clarks Creek Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan -- DRAFT | 09-10-081 | October 2009 |
| Quality Assurance Project Plan: Lower White River pH Nutrients Study. | 09-03-131 | October 2009 |
| Quality Assurance Project Plan: White Salmon River Fecal Coliform Bacteria Compliance Monitoring | 09-03-127 | September 2009 |
| Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report -- DRAFT | 07-10-073 | September 2009 |
| Quality Assurance Monitoring Plan: Continuous Monitoring for Oxygen, Temperature, pH, and Conductivity in Statewide Rivers and Streams | 09-03-122 | September 2009 |
| DRAFT: Yakima River Pesticides and PCBs Total Maximum Daily Load: Volume 1: Water Quality Study Findings | 09-03-036 | September 2009 |
| Salmon Creek Nonpoint Source Pollution Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report | 09-03-042 | August 2009 |
| Streamflow Summary for Gaging Stations on the Snoqualmie River and Selected Tributaries, 2006 | 09-03-040 | August 2009 |
| Wenatchee River Watershed Dissolved Oxygen and pH Total Maximum Daily Load: Water Quality Improvement Report | 08-10-062 | August 2009 |
| South Fork Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report | 09-10-060 | August 2009 |
| Samish Bay Watershed Fecal Coliform Bacteria Total Maximum Daily Load - Volume 2 | 09-10-019 | July 2009 |
| Quality Assurance Project Plan, Supplemental: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study | 09-03-114 | July 2009 |
| Total Maximum Daily Loading (TMDL) to Limit Discharges of 2,3,7,8-TCDD (Dioxin) to the Columbia River Basin | 09-10-058 | July 2009 |
| Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Implementation Plan | 09-10-039 | July 2009 |
| Surface Water/Groundwater Exchange Along the East Fork Lewis River (Clark County), 2005 | 09-03-037 | June 2009 |
| Lake Sawyer Total Phosphorus TMDL Water Quality Implementation Plan | 09-10-053 | June 2009 |
| Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report | 09-10-030 | June 2009 |
| Executive Summary of Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report | 09-10-030a | June 2009 |
| Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load Study: Water Quality Effectiveness Monitoring Report | 09-10-045 | May 2009 |
| Quality Assurance Project Plan: Audubon Lake's Connection to Upper Crab Creek (Lincoln County): Source Assessment | 09-03-112 | April 2009 |
| Quality Assurance Project Plan: Okanogan River DDT and PCB Total Maximum Daily Load Effectiveness Monitoring | 09-03-107 | April 2009 |
| Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 2006 | 09-10-034 | April 2009 |
| Addendum to Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring | 05-03-201ADD1 | April 2009 |
| High-resolution Porewater Sampling Near the Groundwater/Surface Water Interface | 09-03-017 | April 2009 |
| Quality Assurance Project Plan: Innovative Temperature Total Maximum Daily Load Pilot Study | 09-03-105 | March 2009 |
| Surface-water/Groundwater Interactions and Near-stream Groundwater Quality along the Palouse River, South Fork Palouse River, and Paradise Creek | 09-03-007 | February 2009 |
| Quality Assurance Project Plan: Dungeness Bay and Lower Dungeness River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Effectiveness Monitoring | 09-03-104 | February 2009 |
| Focus on the Samish Watershed | 09-10-020 | February 2009 |
| Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills | 09-03-004 | January 2009 |
| Streamflow Summary for Gaging Stations on the East Fork Lewis River, 2005-06 | 09-03-002 | January 2009 |
| Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation | 01-03-064ADD1 | January 2009 |
| Water Quality Study Design (Quality Assurance Project Plan): Liberty Bay Tributaries Fecal Coliform Bacteria Total Maximum Daily Load | 09-03-102 | January 2009 |
| Focus on Deschutes Watershed | 08-10-103 | January 2009 |
| Adaptive Management Team Total Dissolved Gas in the Columbia and Snake Rivers: Evaluation of the 115 Percent Total Dissolved Gas Forebay Requirement | 09-10-002 | January 2009 |
| Upper Naches River Temperature Total Maximum Daily Load: Volume 1, Water Quality Study Findings | 08-03-036 | December 2008 |
| Walla Walla Watershed PCBs, Chlorinated Pesticides, Fecal Coliform, Temperature, pH, and Dissolved Oxygen Total Maximum Daily Load Water Quality Implementation Plan | 08-10-094 | December 2008 |
| Appendix G. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings. | 08-03-024AppG | November 2008 |
| Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load: Volume 1, Water Quality Study Findings | 08-03-029 | November 2008 |
| Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings | 08-03-024 | November 2008 |
| Appendix B-F. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings | 08-03-024AppB-F | November 2008 |
| Appendix H. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings. | 08-03-024AppH | November 2008 |
| Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design | 08-03-117 | October 2008 |
| Bear-Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report | 08-10-058 | September 2008 |
| Quality Assurance Project Plan: High-resolution, Pore-water Sampling Near the Groundwater/Surface Water Interface | 08-03-115 | September 2008 |
| Addendum to Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load | 08-03-105ADD1 | September 2008 |
| Willapa River Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan | 08-10-052 | August 2008 |
| Focus on Lake Whatcom TMDL: Draft study identifies limits for Lake Whatcom phosphorus and bacteria | 08-10-068 | August 2008 |
| Henderson Inlet Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan | 08-10-040 | July 2008 |
| Bear-Evans Watershed FC TMDL: WQ Improvement Report | 08-10-026 | July 2008 |
| Lower Skagit River Tributaries Temperature Total Maximum Daily Load: Water Quality Improvement Report | 08-10-020 | July 2008 |
| Quality Assurance Project Plan: Burnt Bridge Creek Fecal Coliform Bacteria, Dissolved Oxygen, and Temperature Total Maximum Daily Load-Water Quality Study Design | 08-03-110 | July 2008 |
| Quality Assurance Project Plan: Union River Fecal Coliform Total Maximum Daily Load Effectiveness Monitoring | 08-03-109 | July 2008 |
| Fauntleroy Creek Fecal Coliform Bacteria Total Maximum Daily Load Water Quality Implementation Plan | 08-10-041 | May 2008 |
| Puyallup and White Rivers Dissolved Oxygen and Temperature Data Summary Report | 08-03-013 | May 2008 |
| Clarks Creek Watershed Fecal Coliform TMDL | 07-10-110 | May 2008 |
| Lake Whatcom TMDL Model - Partial Rollback Scenarios | 09-10-012 | April 2008 |
| Lake Ballinger Total Phosphorus Total Maximum Daily Load: Water Quality Attainment Monitoring Report | 08-03-007 | April 2008 |
| Snoqualmie River Basin Fecal Coliform Bacteria, Dissolved Oxygen, Ammonia-Nitrogen, and pH Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report | 08-03-005 | March 2008 |
| Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load: Phase 1 Water Quality Study Design | 08-03-105 | March 2008 |
| Focus on The State Environmental Policy Act (SEPA) Reviews and TMDLs. | 08-06-008 | March 2008 |
| Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load | 08-03-104 | February 2008 |
| Several creeks in the Lower Skagit watershed need your help | 08-10-017 | February 2008 |
| Data Summary Report: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study | 08-03-001 | February 2008 |
| Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Dobbs Creek | 08-10-009 | January 2008 |
| Skokomish River TMDL Cleans Up Bacteria | 08-10-008 | January 2008 |
| Pend Oreille River Total Dissolved Gas Total Maximum Daily Load: Water Quality Improvement Report | 07-03-003 | December 2007 |
| Spokane River PCB TMDL Stormwater Loading Analysis: Final Technical Report | 07-03-055 | December 2007 |
| Skokomish River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study: Water Quality Attainment Monitoring Report | 07-03-054 | December 2007 |
| Quality Assurance Project Plan: McAllister Creek Source Identification: Water Quality Monitoring for Fecal Coliform Bacteria and Nitrate+Nitrite-N in Medicine Creek | 07-10-105 | December 2007 |
| Tributaries to Totten, Eld and Little Skookum Inlets Fecal Coliform Bacteria and Temperature Total Maximum Daily Load: Water Quality Implementation Plan | 07-10-071 | December 2007 |
| Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Improvement Report | 06-10-045 | November 2007 |
| Amendment to Lake Whatcom TMDL Final Modeling Report - Full Buildout/Rollback Scenarios and Translator: Technical memorandum from the Cadmus Group, Inc. & CDM to the Washington State Department of Ecology | 09-10-011 | November 2007 |
| PCB Monitoring at Walla Walla and College Place Wastewater Treatment Plants, 2006-07 | 07-03-046 | October 2007 |
| Streamflow Summary for Gaging Stations on the Naches River and Rattlesnake Creek, 2004 | 07-03-042 | September 2007 |
| Green River and Newaukum Creek Temperature and Dissolved Oxygen Total Maximum Daily Load Study: Data Summary Report | 07-03-001 | August 2007 |
| Willapa River Fecal Coliform Bacteria Verification Study: Water Quality Monitoring Report | 07-03-039 | August 2007 |
| Quality Assurance Project Plan: Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study-Water Quality Study Design | 07-03-110 | August 2007 |
| Quality Assurance Project Plan: Dieldrin and PCB Monitoring of Wastewater Treatment Plants in the Palouse River Watershed | 07-03-111 | August 2007 |
| Quality Assurance Project Plan: Lake Chelan Wapato Basin Total Phosphorus TMDL Effectiveness Monitoring, 2007 | 07-03-109 | August 2007 |
| Palouse River Chlorinated Pesticide and PCB Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan | 07-03-018 | July 2007 |
| Wenatchee River Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report | 07-10-045 | July 2007 |
| Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish in 2006: Data Summary and Comparison to Human Health Criteria | 07-03-036 | July 2007 |
| FINAL Model Report for Lake Whatcom Watershed TMDL Model Project | 09-10-010 | July 2007 |
| Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study. | 07-03-107 | July 2007 |
| Mission Creek Watershed DDT Total Maximum Daily Load: Water Quality Improvement Report | 07-10-046 | July 2007 |
| Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design | 07-03-108 | July 2007 |
| Lower Skagit River Fecal Coliform Total Maximum Daily Load: Water Quality Implementation Plan | 07-10-056 | July 2007 |
| Stillaguamish River Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Temperature Total Maximum Daily Load: Water Quality Implimentation Plan | 07-10-033 | June 2007 |
| Walla Walla Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report | 07-10-030 | June 2007 |
| Fauntleroy Creek Fecal Coliform Total Maximum Daily Load: Water Quality Improvement Report | 07-10-037 | June 2007 |
| Similkameen River and Palmer Lake Investigation of Arsenic in Fish Tissue | 07-03-034 | June 2007 |
| Walla Walla River Basin pH and Dissolved Oxygen Total Maximum Daily Load Study: Water Quality Improvement Report | 07-03-010 | June 2007 |
| Willapa River Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Improvement Report | 07-03-021 | June 2007 |
| Quality Assurance Project Plan: Palouse River Temperature Total Maximum Daily Load Study | 07-03-106 | June 2007 |
| Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load: Water Quality Implementation Plan | 07-10-016 | June 2007 |
| Walla Walla River Tributaries Temperature Total Maximum Daily Load Study | 07-03-014 | April 2007 |
| Cottage Lake Total Phosphorus Total Maximum Daily Load Water Quality Implementation Plan | 06-10-066 | April 2007 |
| Lake Campbell and Lake Erie Total Phosphorus Total Maximum Daily Load - Water Quality Effectiveness Monitoring Report | 07-03-011 | March 2007 |
| Vancouver Lake PCBs, Chlorinated Pesticides, and Dioxins in Fish Tissue and Sediment | 07-03-017 | March 2007 |
| Characterizing Stormwater for Total Maximum Daily Load Studies: A Review of Current Approaches | 07-03-006 | February 2007 |
| Assessment of Surface Water / Groundwater Interactions and Associated Nutrient Fluxes in the Deschutes River and Percival Creek Watersheds, Thurston County | 07-03-002 | January 2007 |
| Whatcom Creek Fecal Coliform Total Maximum Daily Load Report: Water Quality Improvement Plan -- DRAFT | 06-10-041 | January 2007 |
| Replicate Precision for 12 TMDL Studies and Recommendations for Precision Measurement Quality Objectives for Water Quality Parameters | 06-03-044 | December 2006 |
| Wilson Creek Sub-basin Bacteria Total Maximum Daily Load Detailed Implementation Plan | 06-10-065 | December 2006 |
| Quality Assurance Project Plan: Puyallup River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-115 | December 2006 |
| 2006 TMDL Workload Assessment | 06-10-092 | December 2006 |
| Washington State Water Quality Conditions in 2005, based on Data from the Freshwater Monitoring Unit | 06-03-030 | November 2006 |
| An Evaluation of a Piezometer-Based Constant Head Injection Test (CHIT) for use in Groundwater/Surface Water Interaction Studies | 06-03-042 | November 2006 |
| Colville National Forest Temperature and Bacteria Total Maximum Daily Load: Water Quality Implementation Plan | 06-10-059 | October 2006 |
| Pullman Stormwater Pilot Study for Pesticides, PCBs, and Fecal Coliform Bacteria, 2005-2006 | 06-03-034 | October 2006 |
| Henderson Inlet Watershed Fecal Coliform Bacteria, Dissolved Oxygen, and pH Total Maximum Daily Load: Water Quality Improvement Report Implementation Strategy | 06-10-058 | October 2006 |
| PCB Monitoring at Walla Walla Wastewater Treatment Plants | 06-03-114 | October 2006 |
| Sampling and Analysis Plan and Quality Assurance Project Plan: Green River and Newaukum Creek Temperature and Dissolved Oxygen Study | 06-03-110 | October 2006 |
| Sampling and Analysis Plan and Quality Assurance Project Plan: Bear/Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load Study | 06-03-107 | September 2006 |
| Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study | 06-03-112 | September 2006 |
| Quality Assurance Project Plan: Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish - 2006: Assessing Progress Toward TMDL Targets and Updating the Fish Consumption Advisory | 06-03-111 | September 2006 |
| Stillaguamish River Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report -- Vol. 2: Implementation Strategy | 06-10-057 | September 2006 |
| Quality Assurance Project Plan: Puyallup and White Rivers Temperature and Dissolved Oxygen Monitoring | 06-03-204 | August 2006 |
| Quality Assurance Project Plan: Old Stillaguamish River Multi-Parameter Total Maximum Daily Load Study | 06-03-108 | August 2006 |
| Quality Assurance Project Plan: Snoqualmie River Temperature Total Maximum Daily Load Study | 06-03-106 | July 2006 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | 06-10-018 | July 2006 |
| Quality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-105 | June 2006 |
| Spokane River PCBs Total Maximum Daily Load Study (DRAFT report) | 06-03-024 | June 2006 |
| Focus on Spokane River Studies | 06-10-046 | June 2006 |
| Selah Ditch Multiparameter Total Maximum Daily Load: Water Quality Improvement Report | 06-10-040 | June 2006 |
| Quality Assurance Project Plan: South Fork Palouse River Temperature Total Maximum Daily Load Study | 06-03-104 | June 2006 |
| Focus on Samish Watershed | 06-10-030 | June 2006 |
| Lower Yakima River Suspended Sediment Total Maximum Daily Load: Effectiveness Monitoring Report | 06-03-014 | May 2006 |
| North Fork Palouse River Fecal Coliform Total Maximum Daily Load: Water Quality Implementation Plan | 06-10-028 | May 2006 |
| Wenatchee River Basin Dissolved Oxygen, pH, and Phosphorus Total Maximum Daily Load Study | 06-03-018 | April 2006 |
| Protecting Washington State's Waters (TMDL Video) | 06-10-027 | April 2006 |
| Lake Chelan Watershed DDT and PCB Total Maximum Daily Load: Water Quality Improvement Report | 06-10-022 | April 2006 |
| Focus on Swamp Creek | 06-10-023 | April 2006 |
| Quality Assurance Project Plan: Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-102 | March 2006 |
| Tributaries to Totten, Eld, and Little Skookum Inlets - Fecal Coliform Bacteria and Temperature Total Maximum Daily Load: Water Quality Improvement Report | 06-03-007 | March 2006 |
| Walla Walla River Chlorinated Pesticides and PCBs Total Maximum Daily Load (Water Cleanup Plan): Submittal Report | 05-10-079 | March 2006 |
| Henderson Inlet Watershed Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Temperature Total Maximum Daily Load Study | 06-03-012 | March 2006 |
| Wenatchee Watershed Planning | 06-10-008 | March 2006 |
| Willapa River Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan | 06-10-017 | February 2006 |
| Quality Assurance Project Plan: Willapa River Fecal Coliform Bacteria Verification Study | 06-03-202 | February 2006 |
| Groundwater-Surface Water Interactions along the Naches and Tieton Rivers, Summer and Fall 2004 | 06-03-003 | January 2006 |
| Upper White Watershed Sediment and Temperature Total Maximum Daily Load (Water Cleanup Plan) for Aquatic Habitat: Detailed Implementation Plan | 05-10-038 | January 2006 |
| Water Quality Improvement Projects also known as Total Maximum Daily Loads (TMDLs): What should I know? What does it mean to me? | 05-10-100 | January 2006 |
| Advisory Groups for Water Quality Improvement Projects (TMDLs) | 05-10-101 | January 2006 |
| Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study | 06-03-201 | January 2006 |
| Washington State Water Quality Conditions in 2004, based on Data from the Freshwater Monitoring Unit | 05-03-036 | December 2005 |
| Wenatchee River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study | 05-03-012 | December 2005 |
| Walla Walla River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study | 05-03-041 | December 2005 |
| Focus on Wilson Creek Sub-basin Bacteria TMDL | 03-10-022 | December 2005 |
| Focus on Upper Yakima Basin - Restoration plan targets sediments | 01-10-003 | December 2005 |
| Focus on Teanaway Basin - A plan to improve stream temperatures | 01-10-020 | December 2005 |
| An Analysis of Microbial Pollution in the Sinclair-Dyes Inlet Watershed | 05-03-042 | December 2005 |
| Quality Assurance Project Plan: Continuous Stream Temperature Monitoring by the Freshwater Monitoring Unit | 05-03-202 | December 2005 |
| Quality Assurance Project Plan: Comparison of Stream Temperature Monitoring Protocols used by the Environmental Monitoring and Trends Section | 05-03-205 | December 2005 |
| Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study | 05-03-115 | November 2005 |
| Lower Similkameen River Arsenic Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | 05-10-074 | October 2005 |
| Wenatchee River Temperature Total Maximum Daily Load Study | 05-03-011 | August 2005 |
| Flow Summary for Gaging Stations on Selected Tributaries of the Walla Walla River | 05-03-029 | August 2005 |
| Quality Assurance Project Plan: Pataha Creek Effectiveness Monitoring Total Maximum Daily Load Study | 05-03-203 | August 2005 |
| Gibbons Creek Watershed Fecal Coliform Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | 05-10-078 | August 2005 |
| Assessment of Surface Water and Groundwater Interchange in the Walla Walla River Watershed | 05-03-020 | August 2005 |
| Willapa River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report and Detailed Implementation Plan | 05-10-073 | August 2005 |
| Colville River Watershed Fecal Coliform Bacteria Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | 05-10-045 | August 2005 |
| Lake Whatcom Water Quality Model | 09-10-007 | July 2005 |
| Assessment of Total Dissolved Gas in the Spokane River at Upriver and Little Falls Dams | 05-03-010 | July 2005 |
| Groundwater Data Summary for the Wenatchee River Watershed Total Maximum Daily Load Study | 05-03-018 | July 2005 |
| Colville National Forest Temperature, Bacteria, and pH Total Maximum Daily Load (Water Cleanup Plan): Submittal Report | 05-10-047 | July 2005 |
| Lake Chelan DDT and PCBs in Fish Total Maximum Daily Load Study | 05-03-014 | June 2005 |
| Flow Summary for Gaging Stations on the Wenatchee River and Selected Tributaries | 05-03-015 | June 2005 |
| Wilson Creek Sub-Basin Bacteria Total Maximum Daily Load (Water Cleanup Plan): Submittal Report | 05-10-041 | June 2005 |
| Quality Assurance Project Plan: Upper Yakima Basin Temperature Total Maximum Daily Load Study | 05-03-111 | June 2005 |
| Nisqually Watershed Bacteria and Dissolved Oxygen Total Maximum Daily Load (Water Cleanup Plan): Submittal Report | 05-10-040 | June 2005 |
| Quality Assurance Project Plan: East Fork Lewis River Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study | 05-03-110 | June 2005 |
| Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study | 05-03-002 | May 2005 |
| Appendices: Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study | 05-03-002app | May 2005 |
| Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish | 05-03-106 | May 2005 |
| Quality Assurance Project Plan: Total Maximum Daily Load Analysis for Temperature in Tributaries to Oakland Bay-Hammersley Inlet: Mill Creek, Cranberry Creek, and Johns Creek | 05-03-107 | May 2005 |
| Little Bear Creek Water Cleanup Plan for Fecal Coliform Bacteria, Total Maximum Daily Load - Submittal Report | 05-10-034 | May 2005 |
| Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Arsenic, and Mercury Total Maximum Daily Load (Water Cleanup Plan) - Submittal Report | 05-10-044 | May 2005 |
| Focus Sheet: Water Cleanup Planning in the East Fork Lewis River Watershed | 05-03-013 | April 2005 |
| Salmon Creek Watershed Bacteria and Turbidity Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | 05-10-037 | March 2005 |
| Lower Okanogan River Basin DDT and PCBs Total Maximum Daily Load: Submittal Report | 04-10-043 | February 2005 |
| North Fork Palouse River Fecal Coliform Total Maximum Daily Load: Submittal Report | 04-10-067 | February 2005 |
| Focus on Little Bear Creek | 05-10-024 | February 2005 |
| Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study, Data Summary Report | 05-03-003 | February 2005 |
| Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring | 05-03-201 | February 2005 |
| Selah Ditch Multiparameter Total Maximum Daily Load: Technical Assessment | 05-10-020 | February 2005 |
| Focus on Interim Wastewater Permitting | 05-10-006 | January 2005 |
| Lake Whatcom Total Maximum Daily Load Groundwater Study | 05-03-001 | January 2005 |
| Quality Assurance Project Plan: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study | 05-03-101 | January 2005 |
| Dungeness River and Matriotti Creek Post-Total Maximum Daily Load Data Review | 04-03-053 | December 2004 |
| A Total Maximum Daily Load Evaluation for Chlorinated Pesticides and PCBs
in the Walla Walla River | 04-03-032 | October 2004 |
| DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County: Total Maximum Daily Load Assessment | 04-03-043 | October 2004 |
| Quality Assurance Project Plan: Old Stillaguamish River Channel Diel Surveys. | 04-03-113 | October 2004 |
| Quality Assurance Project Plan: Naches River Temperature Total Maximum Daily Load | 04-03-110 | September 2004 |
| Quality Assurance Project Plan: Fecal Coliform Bacteria TMDL for Oakland Bay-Hammersley Inlet and Tributaries | 04-03-111 | September 2004 |
| Quality Assurance Project Plan: Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell | 04-03-206 | September 2004 |
| Willapa River Watershed Temperature Total Maximum Daily Load Study | 04-03-024 | September 2004 |
| Quality Assurance Project Plan: Pend Oreille River Temperature Total Maximum Daily Load Technical Study | 04-03-109 | September 2004 |
| Water Quality Program Responsiveness Summary: Fiscal Year 2005 Water Cleanup Plans TMDLs | 04-10-071 | August 2004 |
| Data Summary: Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Arsenic Total Maximum Daily Load Study | 04-03-037 | August 2004 |
| Whatcom Creek Fecal Coliform Total Maximum Daily Load Study | 04-03-015 | August 2004 |
| Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Arsenic Total Maximum Daily Load Study | 04-03-017 | July 2004 |
| Cómo Comentar Eficazmente sobre Proyectos de Limpiar las Aguas | 04-10-039es | July 2004 |
| Issaquah Creek Basin Water Cleanup Plan for Fecal Coliform Bacteria: Submittal Report | 04-10-055 | July 2004 |
| Cottage Lake Total Maximum Daily Load Analysis: Submittal Report | 03-10-085 | June 2004 |
| Total Maximum Daily Load for Total Dissolved Gas in the Mid-Columbia River and Lake Roosevelt | 04-03-002 | June 2004 |
| How to Comment Effectively on Water Cleanup Plans | 04-10-039 | June 2004 |
| North Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Recommendations | 04-03-022 | May 2004 |
| Upper Chehalis River Fecal Coliform Bacteria Total Maximum Daily Load: Submittal Report | 04-10-041 | May 2004 |
| Quality Assurance Project Plan: Tributaries to Totten, Eld, and Little Skookum Inlets Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study | 04-03-106 | May 2004 |
| Quality Assurance Project Plan: Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study | 04-03-107 | May 2004 |
| Wind River Watershed Temperature Total Maximum Daily Load:Detailed Implementation Plan | 04-10-037 | May 2004 |
| Focus on Bacteria in the Issaquah Creek Basin | 04-10-038 | May 2004 |
| Upper Chehalis River Fecal Coliform Bacteria Total Maximum Daily Load Recommendations | 04-03-004 | April 2004 |
| Water Cleanup Plan for Bacteria in Dungeness Bay:Total Maximum Daily Load (TMDL) Submittal Report | 04-10-026 | April 2004 |
| Stillaguamish River Watershed Temperature Total Maximum Daily Load Study | 04-03-010 | March 2004 |
| Quality Assurance Project Plan: Snoqualmie River Total Maximum Daily Load Effectiveness Evaluation | 04-03-201 | March 2004 |
| Dungeness Bay Fecal Coliform Bacteria Total Maximum Daily Load Study | 04-03-012 | March 2004 |
| Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study | 04-03-103 | February 2004 |
| Lower Similkameen River Arsenic Total Maximum Daily Load: Submittal Report | 03-10-074 | February 2004 |
| Lower Skagit River Tributaries Temperature Total Maximum Daily Load Study | 04-03-001 | January 2004 |
| Focus on Cottage Lake Cleanup Plan | 04-10-013 | January 2004 |
| Focus on Water Cleanup Plans | 04-10-002 | January 2004 |
| Johnson Creek Watershed Bacteria Total Maximum Daily Load: Detailed Implementation Plan | 03-10-079 | January 2004 |
| Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load: Detailed Implementation Plan | 03-10-058 | December 2003 |
| Colville River Dissolved Oxygen Total Maximum Daily Load: Submittal Report | 03-10-029 | December 2003 |
| Wenatchee National Forest Water Temperature Total Maximum Daily Load: Technical Report | 03-10-063 | November 2003 |
| Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River | 03-03-107 | October 2003 |
| Water Quality Program Responsiveness Summary--Fiscal Year 2004 TMDL Priority List | 03-10-083 | October 2003 |
| North Creek Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan | 03-10-047 | October 2003 |
| Focus on Little Klickitat River | 03-10-075 | September 2003 |
| Data Summary: Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen | 03-03-023 | August 2003 |
| Total Maximum Daily Load for Lower Snake River Total Dissolved Gas | 03-03-020 | August 2003 |
| Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, pH, and Fecal Coliform Total Maximum Daily Load, Year 2 Technical Study | 03-03-106 | August 2003 |
| Quality Assurance Project Plan: TMDL Effectiveness Monitoring and Water Quality Evaluation in the Lower Yakima River | 04-03-203 | July 2003 |
| Symposium Article: Total Maximum Daily Load Effectiveness Monitoring Strategy for Washington State | 03-03-039 | July 2003 |
| Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan | 03-03-105 | July 2003 |
| Upper Humptulips River Temperature Total Maximum Daily Load: Detailed Implementation Plan | 03-10-042 | July 2003 |
| Inner Bellingham Bay Contaminated Sediments TMDL: Detailed Implementation Plan | 03-10-057 | July 2003 |
| Lower Snohomish River Tributaries Fecal Coliform Bacteria Total Maximum Daily Load:Detailed Implementation Plan | 03-10-031 | June 2003 |
| Mt. Baker Snoqualmie National Forest Upper White Watershed Sediment and Temperature TMDL for Aquatic Habitat: Submittal Report | 03-10-032 | June 2003 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report | 03-10-055 | June 2003 |
| Focus on Proposed Water Cleanup Plans | 03-10-056 | June 2003 |
| Little Klickitat River Watershed Temperature Total Maximum Daily Load:Submittal Report | 03-10-046 | June 2003 |
| Effectiveness Monitoring for Fecal Coliform Total Maximum Daily Loads in Pipers Creek | 03-03-027 | June 2003 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study | 03-03-021 | June 2003 |
| Focus on Water Temperatures in the Lower Skagit River Tributaries | 03-10-039 | June 2003 |
| Colville River Watershed Bacteria Total Maximum Daily Load: Submittal Report - Amended | 03-10-030 | May 2003 |
| Focus on North Creek Water Quality Action Plan | 03-10-043 | May 2003 |
| Focus on Moses Lake Water Cleanup Plan | 03-10-048 | May 2003 |
| Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington | 03-03-103 | April 2003 |
| Skokomish River Detailed Implementation Plan for Fecal Coliform Bacteria | 02-10-072 | April 2003 |
| Teanaway Temperature Total Maximum Daily Load: Detailed Implementation Plan | 03-10-025 | April 2003 |
| Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation | 03-03-102 | March 2003 |
| Focus on White River pH Water Cleanup Plan | 03-10-026 | March 2003 |
| Focus on Water Cleanup Plans | 03-10-010 | March 2003 |
| Focus on South Prairie Creek | 03-10-024 | March 2003 |
| Moses Lake Total Maximum Daily Load Groundwater Study | 03-03-005 | February 2003 |
| Quality Assurance Project Plan: Henderson and Nisqually TMDL Study | 03-03-100 | February 2003 |
| Effectiveness Monitoring for Dioxin Total Maximum Daily Loads in Western Washington | 03-03-002 | January 2003 |
| Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan | 03-10-004 | 2003 |
| Grays Harbor/Chehalis Watershed Fecal Coliform Bacteria Total Maximum Daily Load Submittal Report | 01-10-025 | December 2002 |
| Focus: Lake Whatcom Cleaning up Water Pollution | 02-10-070 | December 2002 |
| Effectiveness Monitoring for Total Phosphorus Total Maximum Daily Loads in Fenwick and Sawyer Lakes | 02-03-054 | December 2002 |
| A Total Maximum Daily Load Evaluation for Arsenic in the Similkameen River | 02-03-044 | November 2002 |
| Results and Recommendations from Monitoring Arsenic Levels in 303(d) Listed Rivers in Washington | 02-03-045 | October 2002 |
| Quality Assurance Project Plan: Woodland Creek Temperature TMDL | 02-03-077 | September 2002 |
| Quality Assurance Project Plan: Mercury in Sediments from Lake Whatcom and Surrounding Lakes: Determination of Spatial and Temporal Patterns and Characterization of Tributary Inputs | 02-03-079 | September 2002 |
| Total Maximum Daily Load for Lower Columbia River Total Dissolved Gas | 02-03-004 | September 2002 |
| MODEL Municipal Stormwater Management Program for Eastern Washington -- DRAFT -- Chapters 1 through 9 | 02-10-041 | September 2002 |
| MODEL Municipal Stormwater Management Program for Eastern Washington -- DRAFT -- Appendices 9A and 9B | 02-10-041-9ab | September 2002 |
| Water Cleanup Plans: Total Maximum Daily Loads (TMDLs) | 02-10-038 | September 2002 |
| Quality Assurance Project Plan: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study | 02-03-076 | August 2002 |
| Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load -- Submittal Report | 02-10-047 | August 2002 |
| Quality Assurance Project Plan: TMDL Technical Assessment of DDT and PCBs in the Okanogan River | 02-03-070 | August 2002 |
| Little Klickitat River Watershed Temperature Total Maximum Daily Load | 02-03-031 | August 2002 |
| Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load, Year 1 Technical Study | 02-03-069 | July 2002 |
| Addendum to Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load Year 1 Technical Study | 02-03-069ADD | July 2002 |
| Colville River Fecal Coliform Total Maximum Daily Load Study | 02-03-036 | July 2002 |
| Data Summary: Upper Yakima River Basin Suspended Sediment and Organochlorine Pesticide TMDL Evaluation | 02-03-032 | July 2002 |
| Quality Assurance Project Plan: Lake Whatcom TMDL Study | 02-03-074 | July 2002 |
| Quality Assurance Project Plan: TMDL Technical Study: Chlorinated Pesticides and PCBs in the Walla Walla River | 02-03-068 | July 2002 |
| Water Cleanup Plans: Taking the temperature of the Walla Walla watershed | 02-10-035 | July 2002 |
| Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring | 02-03-067 | July 2002 |
| Quality Assurance Project Plan: Walla Walla River Tributaries Temperature Total Maximum Daily Load | 02-03-066 | June 2002 |
| Moses Lake Inflow-Outflow Balance: A Component of the Moses Lake Total Phosphorus Total Maximum Daily Load | 02-03-029 | June 2002 |
| North Creek Fecal Coliform Total Maximum Daily Load Submittal Report | 02-10-020 | June 2002 |
| Union River Fecal Coliform Total Maximum Daily Load Submittal Report | 02-10-022 | June 2002 |
| Wind River Watershed Temperature Total Maximum Daily Load Submittal Report | 02-10-029 | June 2002 |
| Water Cleanup Plan for Bacteria in the Lower Dungeness Watershed -- Total Maximum Daily Load
(TMDL) Submittal Report | 02-10-015 | June 2002 |
| Water Cleanup Plans: Taking the temperature of the Wenatchee watershed | 02-10-028 | June 2002 |
| Dungeness River and Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study | 02-03-014 | May 2002 |
| Water Cleanup Plans: Waterbodies Proposed for Cleanup Plans | 02-10-027 | May 2002 |
| Focus Sheet: Union River Needs Your Help! | 02-10-021 | April 2002 |
| Plan de Limpieza: Plan de Limpieza para la Cuenca de Wenatchee (Wenatchee TMDL) | 02-10-024 | April 2002 |
| Upper Yakima River Basin Suspended Sediment and Organochlorine Pesticide Total Maximum Daily Load Evaluation | 02-03-012 | April 2002 |
| Public comments invited on draft plan to clean up lower Dungeness watershed | 02-10-016 | April 2002 |
| Wind River Watershed Temperature Total Maximum Daily Load | 02-03-010 | March 2002 |
| Focus Sheet: Water Quality in the Colville River Watershed | 02-10-013 | March 2002 |
| Factors Affecting Waters with a High pH: Statewide Analysis | 02-03-005 | February 2002 |
| Nooksack River Watershed Bacteria Total Maximum Daily Load -- Detailed Implementation Plan | 01-10-060 | January 2002 |
| Quality Assurance Project Plan: Stillaguamish River Temperature Total Maximum Daily Load | 01-03-066 | December 2001 |
| Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load -- Submittal Report | 01-10-062 | November 2001 |
| Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study Streamflow Summary | 01-03-039 | November 2001 |
| Teanaway Temperature Total Maximum Daily Load Submittal Report | 01-10-019 | November 2001 |
| Union River Fecal Coliform Total Maximum Daily Load Study | 01-03-038 | November 2001 |
| Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load Assessment and Evaluation -- FINAL | 01-10-012 | October 2001 |
| Upper Humptulips River Temperature Total Maximum Daily Load -- Technical Report | 01-10-056 | September 2001 |
| Inner Bellingham Bay Contaminated Sediments Total Maximum Daily Load -- Submittal Report | 99-58 | September 2001 |
| Inner Bellingham Bay Contaminated Sediments TMDL Submittal Report | 01-10-036 | September 2001 |
| Water Quality Program Responsiveness Summary -- Fiscal Year 2001 TMDL Priority List | 01-10-053 | August 2001 |
| Water Cleanup Plan: Priority Water Cleanup Plans for Fiscal Year 2002 | 01-10-052 | August 2001 |
| Water Cleanup Plans : Taking the temperature of Yakima River waterways | 01-10-045 | August 2001 |
| Quality Assurance Project Plan: Willapa River Temperature Total Maximum Daily Load | 01-03-063 | August 2001 |
| Upper Chehalis River Basin Temperature Total Maximum Daily Load | 99-52 | July 2001 |
| Upper Humptulips River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan) Submittal Report | 01-10-022 | June 2001 |
| Water Cleanup Plans: Skagit River Watershed | 01-10-035 | June 2001 |
| Skokomish River Basin Fecal Coliform Total Maximum Daily Load (Water Cleanup Plan) -- Submittal Report | 01-10-017 | June 2001 |
| Snohomish River Tributaries Fecal Coliform Total Maximum Daily Load Submittal Report | 00-10-087 | June 2001 |
| Water Cleanup Plans: Stillaguamish River Watershed | 01-10-034 | June 2001 |
| Water Cleanup Plans: Inner Bellingham Bay Contaminated Sediment TMDL Review Draft | 01-10-037 | June 2001 |
| North Creek Watershed: Total Maximum Daily Load Evaluation for Fecal Coliform Bacteria | 01-03-020 | June 2001 |
| Water Cleanup Plan: Taking the temperature of Washington′s waterways | 01-10-041 | June 2001 |
| Water Cleanup Plans -- Total Maximum Daily Loads (TMDLs) | 01-2033 | May 2001 |
| Final Statewide 303(d) Workload Assessment | 01-03-018 | May 2001 |
| Quality Assurance Project Plan: Stillaguamish River Basin and Port Susan Total Maximum Daily Load Evaluation Update | 01-03-065 | April 2001 |
| Quality Assurance Project Plan: Moses Lake Phosphorus TMDL Study | 01-03-075 | April 2001 |
| Skokomish River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study | 01-03-014 | April 2001 |
| Flow Summary at Three Seasonal Gaging Stations on the Little Klickitat River | 01-03-006 | March 2001 |
| Water Cleanup Plans: Granger Drain Fecal Coliform TMDL | 01-10-004 | February 2001 |
| Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation | 01-03-064 | January 2001 |
| Focus Sheet: New Water Quality Standards Implementation | 01-10-006 | January 2001 |
| Salmon Creek Watershed Bacteria and Turbidity Total Maximum Daily Load -- Submittal Report | 01-10-007 | January 2001 |
| Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 2000 | 01-03-002 | January 2001 |
| Quality Assurance Project Plan: Colville River Fecal Coliform TMDL Study. | 00-03-082 | December 2000 |
| Quality Assurance Project Plan: Little Klickitat River Temperature Total Maximum Daily Load | 00-03-090 | December 2000 |
| Water Cleanup Plans: Ecology seeks comments on plan to clean up bacteria in Snohomish River tributaries | 00-10-092 | December 2000 |
| Data Summary: Lower Nooksack River Basin Bacteria Total Maximum Daily Load | 00-03-038 | September 2000 |
| Flow Summary of Ten Streams and Irrigation Ditches in the Upper Yakima River Basin | 00-03-028 | August 2000 |
| Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment | 00-03-081 | August 2000 |
| Focus Sheet: Priority Water Cleanup Plans for Fiscal Year 2001 | 00-10-052 | August 2000 |
| Responsiveness Summary: Fiscal Year 2000 TMDL Priority List | 00-10-055 | August 2000 |
| Simpson Northwest Timberlands Temperature Total Maximum Daily Load -- Submittal Report | 00-10-047 | July 2000 |
| Grays Harbor Fecal Coliform Total Maximum Daily Load Study | 00-03-020 | June 2000 |
| Focus Sheet: Longview Ditches water cleanup planning update | 00-10-032 | June 2000 |
| Lower Skagit River Fecal Coliform Total Maximum Daily Load Submittal Report -- Water Cleanup Plan | 00-10-010 | June 2000 |
| Johnson Creek Watershed, Total Maximum Daily Load -- Submittal Report | 00-10-033 | June 2000 |
| Nooksack River Watershed Bacteria -- Total Maximum Daily Load Submittal Report | 00-10-036 | June 2000 |
| Gibbons Creek Watershed -- Fecal Coliform Total Maximum Daily Load Submittal Report | 00-10-039 | June 2000 |
| Focus Sheet: Lower Nooksack River -- Cleaning up water pollution | 00-10-022 | May 2000 |
| Lower Skagit River Dissolved Oxygen Total Maximum Daily Load Submittal Report | 00-10-031 | May 2000 |
| Teanaway River Basin Temperature Pilot Technical Assessment | 00-03-015 | April 2000 |
| Focus Sheet: Water Quality in Snohomish County - Cleaning up bacteria in Snohomish River tributaries | 00-10-020 | April 2000 |
| Revised -- Upper Chehalis River Basin Dissolved Oxygen Total Maximum Daily Load Submittal Report | 00-10-018 | March 2000 |
| Gibbons Creek water cleanup planning update | 00-10-012 | March 2000 |
| Focus Sheet: Salmon Creek water cleanup planning update | 00-10-013 | March 2000 |
| Focus Sheet: Water cleanup planning in the Dungeness watershed | 00-10-016 | March 2000 |
| Focus Sheet: Water Quality in Washington State -- Lower Skagit River Bacteria Water Cleanup Plans | 00-10-009 | February 2000 |
| Focus Sheet: Teanaway Temperature TMDL -- A plan to improve stream temperatures | 00-10-008 | February 2000 |
| Quality Assurance Project Plan: Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study | 00-03-080 | February 2000 |
| Willapa River Total Maximum Daily Load Data Summary Report | 00-03-005 | January 2000 |
| Lower Nooksack River Basin Bacteria Total Maximum Daily Load Evaluation | 00-03-006 | January 2000 |
| Focus Sheet: Island/Snohomish Water Cleanup Plan Priorities for Fiscal Year 2000 | 00-10-004 | January 2000 |
| Water Quality Data Compilation and TMDL Ranking for the San Juan Islands | 99-339 | October 1999 |
| Simpson Northwest Timberlands Temperature Total Maximum Daily Load Submittal | 99-56 | October 1999 |
| Focus Sheet: Priority Water Cleanup Plans for Fiscal Year 1999 | 99-2035 | September 1999 |
| Upper Chehalis River Basin Temperature
Total Maximum Daily Load | 99-52-WQ | September 1999 |
| Water Quality Program Responsiveness Summary -- Fiscal Year 1999 TMDL Priority List | 99-24 | August 1999 |
| Snohomish River Estuary -- Total Maximum Daily Load Submittal Report | 99-57 | August 1999 |
| Lake Chelan TMDL -- a plan for keeping it clean | 98-2017 | July 1999 |
| Spokane River Dissolved Metals Total Maximum Daily Load -- Submittal Report | 99-49 | May 1999 |
| Lower Yakima River Cleanup Plan - a plan targeting sediment and pesticides | 98-2026WQ | December 1998 |
| Rocky Ford Creek TMDL Study | 98-326 | September 1998 |
| Cadmium, Lead, and Zinc in the Spokane River Recommendations for TMDL and Waste Load Allocations | 98-329 | September 1998 |
| Total Maximum Daily Loads (TMDL) Workload Model -- Program Definition and Cost | 98-026 | July 1998 |
| Lake Chelan TMDL- A Plan for Keeping it Clean | 98-2017-WQ | July 1998 |
| Washington State Pesticide Monitoring Program: 1996 Surface Water Sampling Report | 98-305 | March 1998 |
| Washington State Pesticide Monitoring Program: 1995 Surface Water Sampling Report | 98-300 | 1998 |
| Lake Sawyer Water Cleanup Plan (TMDL) for Phosphorus | 98-2022-WQ | 1998 |
| South Fork Palouse Water Cleanup Plan (TMDL) for ammonia | 98-2023-WQ | 1998 |
| Focus Sheet: Cleaning up the Willapa River | 98-2031-WQ | 1998 |
| Water Cleanup Plans | 98-2033-WQ | 1998 |
| Polychlorinated Dibenzo-P-Dioxins and Dibenzofurans in Upper Columbia River Suspended Particulate Matter, 1990-1994 | 97-342 | December 1997 |
| Water Quality Assessment of Tributaries to the Snohomish River and Nonpoint Source Pollution TMDL | 97-334 | September 1997 |
| Water Quality in the Wapato Basin of Lake Chelan, Summer 1996 | 97-323 | August 1997 |
| Polychlorinated Dibenzo-P-Dioxins and Dibenzofurans in Snake River Suspended Particulate Matter | 97-328 | August 1997 |
| Campbell Lake Total Phosphorus Total Maximum Daily Load | 97-10-201 | July 1997 |
| Eric Lake Total Phosphorus Total Maximum Daily Load | 97-10-202 | July 1997 |
| A Suspended Sediment and DDT Total Maximum Daily Load Evaluation Report for the Yakima River | 97-321 | July 1997 |
| Lower Skagit River Total Maximum Daily Load Water Quality Study | 97-326a | July 1997 |
| Snohomish River Estuary Dry Season TMDL Study Phase II | 97-325 | June 1997 |
| Protocol for Determining the Mean Epilimnetic Total Phosphorus Concentration in the Wapato Basin of Lake Chelan | 97-317 | April 1997 |
| Colville River Water Quality: Pollutant Loading Capacity and Recommendations for Total Daily Maximum Loads | 96-349 | 1997 |
| Pollutant Loading Capacity for the Black River, Chehalis River System, Washington. Article in the Journal of the American Water Resources Assn, Vol. 33, No. 2, April 1997. | 97-e08 | 1997 |
| Total Maximum Daily Load Development Guidelines | 97-315 | November 1996 |
| Lower Skagit Total Maximum Daily Load Data Summary | 96-345 | November 1996 |
| Watershed Briefing Paper for the Upper and Lower Yakima Watersheds | 96-336 | September 1996 |
| Gibbons Creek Fecal Coliform Total Maximum Daily Load Assessment | 96-316 | April 1996 |
| Lacamas Creek Watershed Total Maximum Daily Load Evaluation | 96-307 | 1996 |
| Salmon Creek Nonpoint Source Pollution TMDL | 95-355 | October 1995 |
| Chehalis River BMP Evaluation Project: Interim Report on the Chehalis River Project Area | 95-336 | September 1995 |
| South Fork Palouse River Total Maximum Daily Load for Ammonia | 95-329 | September 1995 |
| Watershed Briefing Paper for the Upper and Lower Snake River Water Quality Management Area | 95-346 | September 1995 |
| Snohomish River Estuary Dry Season TMDL Study Phase I - Water Quality Model Calibration | 95-338 | July 1995 |
| Description of Spatial Analyses in Support of Columbia Gorge TMDL Projects, Memo to David Giglio, Karol Erickson, and Bob Cusimano. | 95-e18 | June 1995 |
| GIS Analysis, Yakima River Suspended Sediment TMDL Evaluation. Memo to Joe Joy. | 95-e17 | June 1995 |
| Fishtrap Creek Total Maximum Daily Load Study | 95-328 | June 1995 |
| Protocols for Determining the Mean Epilimnetic Total Phosphorus Concentration and Secchi Disc Depth in the Wapato Basin of Lake Chelan | 95-e16 | May 1995 |
| Upper Chehalis River Basin: Evaluation of Total Maximum Daily Loads Summary Report | 94-144 | September 1994 |
| Addendum to the 1993 Puyallup River TMDL Report (Pub #96-326) | 94-e36 | July 1994 |
| Black River Wet Season Nonpoint Source Total Maximum Daily Load Study | 94-104 | June 1994 |
| Black River Dissolved Oxygen and Phosphorus Total Maximum Daily Load Study | 94-106 | June 1994 |
| Snoqualmie River Total Maximum Daily Load Study | 94-71 | May 1994 |
| Appendices for the report, Black River Dissolved Oxygen and Phosphorus Total Maximum Daily Load Study | 94-106app | 1994 |
| Upper Chehalis River Dry Season Total Maximum Daily Load Study | 94-126 | 1994 |
| Cadmium, Copper, Mercury, Lead, and Zinc in the Spokane River: Comparisons with Water Quality Standards and Recommendations for Total Maximum Daily Loads | 94-99 | 1994 |
| Willapa Bay Watershed Bacterial Evaluation and Preliminary Control Strategy | 93-64 | September 1993 |
| Puyallup River Total Maximum Daily Load for Biochemical Oxygen Demand, Ammonia, and Residual Chlorine (This is a summary of 96-326, a 1993 report with the same title.) | 96-326a | July 1993 |
| Puyallup River Total Maximum Daily Load for Biochemical Oxygen Demand, Ammonia, and Residual Chlorine (This is a 1993 report; 96-326a is a summary of this report with the same title.) | 96-326 | June 1993 |
| South Fork Palouse River Total Maximum Daily Load of Ammonia | 93-e48 | June 1993 |
| Ballinger Lake Total Phosphorus Total Maximum Daily Load | 93-10-202 | April 1993 |
| Sawyer Lake Total Maximum Daily Load for Phosphorus | 93-10-201 | February 1993 |
| Fenwick Lake Total Phosphorus Total Maximum Daily Load | 93-10-203 | January 1993 |
| Snoqualmie River Basin Class II Inspections at North Bend, Snoqualmie, and Duvall Wastewater Treatment Plants | 92-e21 | December 1992 |
| Annual Report for the Black River Nonpoint TMDL Study. Memo to Bill Backous, Diane Harvester, Dick Wallace, and Kahle Jennings, October 13, 1992. | 92-e11 | October 1992 |
| Sumas River Receiving Water Study | 92-e07 | October 1992 |
| Chehalis River Basin Water Quality Screening, January and March 1991 | 92-e12 | July 1992 |
| Historical Data Sources and Water Quality Problems in the Chehalis River Basin - First Interim Report for the Chehalis River TMDL | 92-e54 | June 1992 |
| Guidance for Determination and Allocation of Total Maximum Daily Loads (TMDL) in Washington State | 91-e31 | August 1991 |
| PCDDs and PCDFs in Columbia River Suspended Particulate Matter. Memo to Bob Barwin and Steve Saunders. | 91-e28 | May 1991 |
| Lake Chelan Total Maximum Daily Load for Total Phosphorus | 91-e50 | April 1991 |
| Endicott Wastewater Treatment Plant Limited Class II Inspection and Impact of Discharge on Rebel Flat Creek | 90-e70 | March 1990 |
| Selah Wastewater Treatment Plant Receiving Water Survey, October 1988. | 90-e51 | 1990 |
| Walla Walla Wastewater Treatment Plant/Mill Creek Receiving Water Survey, February 12-13, 1986, and TMDL Evaluation. | 87-e20 | March 1987 |
| Goldendale Wastewater Treatment Plant/Little Klickitat River Receiving Water Studies and Total Maximum Daily Load Evaluation. Memo to Jim Milton. | 86-e22 | October 1986 |
| Chehalis River TMDL, Ground Water Reconnaissance and Estimated Inflows. Memo to Paul Pickett. | 93-e14 | June 1983 |