Topic: Environmental assessment for watersheds

This list updated February 07, 2012

Title (link to summary) Number      Date (released or updated)
A study of Eurasian watermilfoil, macroinvertebrates and fish in a Washington lake. Article in Journal of Aquatic Plant Management 49:71-82 (2011).12-03-017February 2012
Surface Water/Groundwater Interactions and Near-Stream Groundwater Quality along Burnt Bridge Creek, Clark County12-03-003January 2012
Toxaphene: Improved Recognition in Washington Streams, Rivers, and Lakes12-03-004January 2012
Environmental Impact Statement for Penoxsulam, Imazamox, Bispyribac-sodium, Flumioxazin, & Carfentrazone-ethyl: Addendum to the Final Supplemental Environmental Impact Statement for Freshwater Aquatic Plant Management00-10-040Addendum1January 2012
Integrated Ambient Monitoring Pilot Report: Potential Causes for Impairment of Rainbow Trout Early Lifestages and Loss of Benthic Biodiversity in Indian Creek12-03-012January 2012
Background Characterization for Metals and Organic Compounds in Northeast Washington Lakes, Part 2: Fish Tissue11-03-054December 2011
South Fork Palouse River Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan11-10-074December 2011
PCB, Dioxin, and Chlorinated Pesticide Sources to Vancouver Lake11-03-063December 2011
Development of Benthic SQVs for Freshwater Sediments in Washington, Oregon, and Idaho11-09-054December 2011
Pyrethroids in Freshwater Sediments of King County11-03-061November 2011
Puget Sound Dissolved Oxygen Model Nutrient Load Summary for 1999-200811-03-057November 2011
Lake Chelan Wapato Basin Total Phosphorus Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report11-03-049November 2011
Quality Assurance Project Plan: Cherry and Ames Creeks (Snoqualmie River Tributaries) Dissolved Oxygen Study11-03-115November 2011
Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Report10-10-065November 2011
Addendum to Gibbons Creek Watershed Fecal Coliform Total Maximum Daily Load Implementation Monitoring Quality Assurance Project Plan11-03-117October 2011
Errata: Pend Oreille River Temperature Total Maximum Daily Load: Water Quality Improvement Report10-10-065errata1October 2011
Measuring Mercury Trends in Freshwater Fish in Washington State, 2010 Sampling Results11-03-053October 2011
Grays Harbor Fecal Coliform Bacteria Monitoring to Characterize Water Quality in Urban Stormwater Drains11-10-079October 2011
Salmon Creek Temperature Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan11-10-044October 2011
Little Spokane River Watershed Fecal Coliform Bacteria, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report -- DRAFT11-10-075October 2011
Quality Assurance Project Plan: Black Lake Grocery Groundwater Confirmational Monitoring11-03-114September 2011
Quality Assurance Project Plan: Salmon Creek Watershed Low Dissolved Oxygen and pH Characterization Study11-03-110September 2011
Quality Assurance Project Plan: Elwha-Dungeness Watershed Planning Area Assessment of Gaged Streamflows by Modeling11-03-112September 2011
White Salmon River Watershed Fecal Coliform Bacteria Attainment Monitoring Study11-03-046August 2011
Addendum to Quality Assurance Project Plan: Aquatic Plant Monitoring in Washington Lakes and Rivers.11-03-106Addendum1August 2011
PBT Chemical Trends in Washington State Determined from Age-Dated Lake Sediment Cores, 2010 Sampling Results11-03-045August 2011
Erratum Bear-Evans Watershed Temperature, Dissolved Oxygen and Fecal Coliform Bacteria Total Maximum Daily Load Water Quality Implementation Plan11-10-024erratum1August 2011
Characteristics of small headwater wetlands in second-growth forests of Washington, USA. Article in the journal, Forest Ecology and Management.11-03-047August 2011
Quality Assurance Project Plan: Aquatic Plant Monitoring in Washington Lakes and Rivers11-03-106July 2011
Erratum Green River Temperature Total Maximum Daily Load Water Quality Improvement Report11-10-046erratum1July 2011
Erratum Whatcom, Squalicum and Padden Creeks Temperature Total Maximum Daily Load Water Quality Improvement Report11-10-019erratum1July 2011
Wenatchee Watershed Planning Area: Prediction of Gaged Streamflows by Modeling11-03-028July 2011
River and Stream Water Quality Monitoring Report, Water Year 201011-03-037July 2011
Wetlands & CAO Updates: Guidance for Small Cities (Eastern Washington Version)10-06-001July 2011
Wetlands & CAO Updates: Guidance for Small Cities (Western Washington Version)10-06-002July 2011
Oakland Bay, Hammersley Inlet, & Selected Tributaries Fecal Coliform Bacteria Total Maximum Daily Load Water Quality Improvement Report (WQIR)/Implementation Plan (WQIP)11-10-039June 2011
Puyallup River Watershed Fecal Coliform Total Maximum Daily Load - Water Quality Improvement Report and Implementation Plan11-10-040June 2011
Green River Temperature Total Maximum Daily Load: Water Quality Improvement Report11-10-046June 2011
Polychlorinated Dibenzodioxins and Dibenzofurans in Surface Sediments of Bellingham Bay, 201011-03-033June 2011
Focus on In-Lieu Fee Mitigation11-06-012June 2011
Newaukum Creek Temperature Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan11-10-047June 2011
Relative Importance of Wastewater Treatment Plants and Non-point Sources of Perfluorinated Compounds to Washington State Rivers11-03-036June 2011
Whatcom, Squalicum, and Padden Creeks Temperature Total Maximum Daily Load: Water Quality Improvement Report11-10-019June 2011
Sinclair and Dyes Inlets Fecal Coliform Bacteria Total Maximum Daily Load: TMDL and Water Quality Implementation Plan -- DRAFT11-10-051June 2011
Focus on Sinclair & Dyes Watersheds: High levels of bacteria in local streams and inlets11-10-052June 2011
Nason Creek (Chelan County) Oxbow Reconnection Monitoring, 201011-03-032June 2011
Deschutes River Continuous Nitrate Monitoring11-03-030June 2011
Snoqualmie River Basin Temperature Total Maximum Daily Load - Water Quality Improvement Report and Implementation Plan11-10-041June 2011
2010 Report to the Legislature: Water Banking in Washington State11-11-072June 2011
Washington State Toxics Monitoring Program: Monitoring with SPMDs for PBTs in Washington Waters in 200911-03-029May 2011
Focus on Snoqualmie Watershed: Watershed Streams Too Warm11-10-042May 2011
Lower Okanogan River Basin DDT and PCB Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report11-03-009May 2011
Focus on Green River Watershed: Water in Green River and Newaukum Creek is Too Warm11-10-043May 2011
Spill Scene Summer 200000-08-017May 2011
Toxics in Surface Runoff to Puget Sound: Phase 3 Data and Load Estimates11-03-010May 2011
Spokane River PCB Source Assessment, 2003-200711-03-013May 2011
Mercury and Copper Levels in Leach Creek (Pierce County) During 2009-201011-03-014May 2011
Frequently Asked Questions: Pend Oreille River Temperature TMDL Dispute Resolution11-10-035May 2011
Hangman (Latah) Creek Watershed Fecal Coliform Bacteria, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Implementation Plan11-10-012May 2011
Focus on Urban Stream Temperature: Several Creeks Flowing to Bellingham Bay Need Your Help11-10-032May 2011
Addendum 4 to Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds.03-03-104ADD4April 2011
Assessment of Aquatic Toxicity in North Creek, Gig Harbor11-03-022April 2011
Appendix D. Figures Showing Sample Collection Times Relative to the Stream Hydrograph at Each Monitoring Location1103010AppendixDApril 2011
Appendix G. Alternative Method for Computing Watershed Scale Loading Estimates1103010AppendixGApril 2011
Appendix J. Validation Reports for Stream Gauging Data1103010AppendixJApril 2011
Appendix K. Detection Frequency Summary Tables for Individual Parameter by Flow Condition, Land Use, and Watershed1103010AppendixKApril 2011
Appendix L. Summary Statistics for Toxic Chemical Concentrations by Monitoring Location, Land Use, and Watershed1103010AppendixLApril 2011
Appendix P. Watershed-Scale Total Toxic Chemical Loading Estimates1103010AppendixPApril 2011
Phase 2: High Summer Bacteria Concentrations in South Puget Sound Streams11-03-019April 2011
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2010 Data Summary11-03-021April 2011
Appendices C-E: Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2010 Data Summary11-03-021AppendicesC-EApril 2011
Non-Project Environmental Impact Statement Aquatic Invasive Species Control10-10-010April 2011
Quality Assurance Project Plan: Wenatchee Watershed Planning Area Assessment of Gaged Streamflows by Modeling11-03-104March 2011
Bear-Evans Watershed Temperature, Dissolved Oxygen and Fecal Coliform Bacteria TMDL - Water Quality Implementation Plan11-10-024March 2011
Hangman Creek Watershed Dissolved Oxygen, pH, and Nutrients Total Maximum Daily Load Study: Data Summary Report11-03-020March 2011
Frequently Asked Questions on Ecology's Petition Response: How Ecology′s alternative to the Lake Whatcom petition will serve to protect the lake′s water quality11-11-070March 2011
Mercury Concentrations in Lake Ozette Sockeye11-03-017March 2011
Frequently Asked Questions: In-Lieu Fee Mitigation11-06-008March 2011
Lacamas Creek Fecal Coliform, Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load: Water Quality Study Design (Quality Assurance Project Plan)11-03-102February 2011
Final Economic Impact Analysis: Aquatic Plant and Algae Management General Permit11-10-014February 2011
Quality Assurance Project Plan: Pyrethroids in Freshwater Sediments of King County11-03-101February 2011
Walla Walla Watershed Planning Area: Prediction of Gaged Streamflows by Modeling11-03-002January 2011
Control of Toxic Chemicals in Puget Sound: Characterization of Toxic Chemicals in Puget Sound and Major Tributaries, 2009-1011-03-008January 2011
Mercury Levels in Gold Mining Reaches on Seven Washington Rivers and Creeks11-03-003January 2011
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2009 Data Summary11-03-004January 2011
Appendices C-G: Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2009 Data Summary11-03-004-Appendices C-GJanuary 2011
South Puget Sound Dissolved Oxygen Study: Interim Nutrient Load Summary11-03-001January 2011
Protecting Washington from invasive species and toxic algae10-10-044January 2011
Weaver Creek (Mason County) Fecal Coliform Attainment Monitoring10-03-070December 2010
Streamflow Summary for Burnt Bridge Creek (Clark County), 200810-03-072December 2010
Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report and Implementation Plan10-10-067December 2010
Streamflow Summary for the Palouse and South Fork Palouse Rivers and Selected Tributaries, 2006-0810-03-071December 2010
Addendum to Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment08-03-119 Addendum 1December 2010
Upper Naches River and Cowiche Creek Temperature Total Maximum Daily Load: Volume 2. Implementation Strategy10-10-068December 2010
Quality Assurance Project Plan: Skagit Bay Fecal Coliform Bacteria Loading Assessment10-03-121November 2010
Upper Chehalis River Watershed Multi-Parameter Total Maximum Daily Load: Water Quality Data Review10-03-057November 2010
POSTER: Washington′s Swimming Beach Program: Bacterial Monitoring in Puget Sound10-03-065November 2010
New Program Provides Assistance in Hangman Creek Watershed10-10-074November 2010
Land-Use Effects on Export and Retention of Mercury in the Lake Ozette Watershed10-03-059November 2010
Selecting Mitigation Sites Using a Watershed Approach (Eastern Washington)10-06-007November 2010
Quality Assurance Project Plan: Trend Monitoring for Organic PBTs in Washington Rivers and Lakes10-03-117October 2010
Quality Assurance Project Plan: Lake Spokane Nutrient Monitoring10-03-120October 2010
Measuring Mercury Trends in Freshwater Fish in Washington State, 2009 Sampling Results10-03-058October 2010
Quality Assurance Project Plan: Mercury Screening in Lake Ozette Sockeye10-03-118October 2010
Liberty Lake Source Trace Study Regarding PCB, PBDE, Metals, and Dioxin/Furan - A pilot project for Spokane Basin Source Tracing10-04-027October 2010
PCBs, Dioxins, and Furans in Fish, Sediment, and Wastewater Treatment Plant Effluent from West Medical Lake10-03-038September 2010
2010 Report to the Legislature and Governor: Review of Water Resources Program Functions and Funding Structure--Recommendations for a Sustainable and Efficient Program10-11-022September 2010
Walla Walla River Basin Fecal Coliform Bacteria, pH, and Dissolved Oxygen Total Maximum Daily Load: Supplemental Study10-03-054September 2010
Focus on the Clean Samish Initiative09-10-020September 2010
Quality Assurance Project Plan: Pilot Study of an Ambient Monitoring Approach for Evaluating the Biological Integrity of Urban Streams.10-03-114September 2010
Potholes Reservoir: Screening Survey for Dieldrin, Other Chlorinated Pesticides, and PCBs in Fish, Water, and Sediments10-03-053September 2010
Quality Assurance Project Plan: Hangman Hills Sewage Treatment Plant Nutrient Loading and Groundwater Study10-03-116September 2010
Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study10-03-111September 2010
Quality Assurance Project Plan: Phase 2: High Summer Bacteria Concentrations in Streams10-03-110September 2010
Quality Assurance Project Plan: Analyzing Toxaphene at Water Quality Criteria Levels in Treated Lakes and Agricultural Streams10-03-115September 2010
Public Hearings, Workshops, and Comment Period: Draft Aquatic Plant and Algae Management General Permit10-10-056September 2010
Skagit-Samish Basin Intensive Surface Water Sampling for Pesticides in Salmon-Bearing Streams, 200910-03-043August 2010
River and Stream Water Quality Monitoring Report, Water Year 200910-03-046August 2010
Quality Assurance Monitoring Plan: Ambient Biological Monitoring in Rivers and Streams: Benthic Macroinvertebrates and Periphyton10-03-109August 2010
Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design10-03-113August 2010
Perfluorinated Compounds in Washington Rivers and Lakes10-03-034August 2010
Focus on Perfluorinated Compounds: PFCs in Washington State Rivers and Lakes10-03-044August 2010
Quality Assurance Project Plan: Monitoring Stream Temperatures and Habitat Characteristics for the Extensive Riparian Status and Trends Program10-03-105July 2010
Focus on Irrigation-Influenced Wetlands10-06-015July 2010
Lower White River Nutrients and pH Study: Data Summary Report10-03-040July 2010
Tucannon River and Pataha Creek Temperature Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan10-10-019July 2010
Transforming Watersheds: Palouse River - Whitman County10-10-039July 2010
Focus on Wetlands: The Credit/Debit Method for Estimating Needs in Compensatory Wetland Mitigation10-06-013July 2010
Quality Assurance Project Plan: Asotin Creek Fecal Coliform Study.10-03-106June 2010
PBT Trend Monitoring: Measuring Lead in Suspended Particulate Matter from Washington State Rivers and Lakes, 2009 Results10-03-041June 2010
Quality Assurance Project Plan: Walla Walla Watershed Planning Area Prediction of Gaged Streamflows by Modeling10-03-108June 2010
Guidance for Stressor Identification of Biologically Impaired Aquatic Resources in Washington State10-03-036June 2010
Determination of PBT Chemical Trends in Selected Washington Lakes Using Age-Dated Sediment Cores, 2009 Sampling Results10-03-035June 2010
Focus on Regulating Isolated Wetlands01-06-020June 2010
Dungeness Bay and Dungeness River Watershed Fecal Coliform Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report10-03-032May 2010
Mercury Accumulation in Sediment Cores from Three Washington State Lakes: Evidence for Local Deposition from a Coal-Fired Power Plant. Journal article in the Archives of Environmental Contamination and Toxicology.10-03-037May 2010
Focus on Fish Testing: Fish Testing Planned for Lake Chelan and Wenatchee River in 201010-03-033May 2010
Green Shorelines for Lakes Washington and Sammamish10-06-008May 2010
An Assessment of Washington Lakes: National Lake Assessment Results10-03-029April 2010
Yakima River Pesticides and PCBs Total Maximum Daily Load: Volume 1. Water Quality Study Findings10-03-018April 2010
Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, PAHs, and PBDEs in Washington Rivers and Lakes, 200810-03-027April 2010
City of Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River10-03-028April 2010
Nooksack Watershed Planning Area (WRIA 1): Prediction of Gaged Streamflows by Modeling10-03-023April 2010
Frequently Asked Questions: Wetland Mitigation Banking09-06-015April 2010
South Prairie Creek Tributaries Fecal Coliform Bacteria Data Summary: Inglin Creek and Spiketon Ditch10-03-026April 2010
Focus on Mitigation that Works Forum08-06-023April 2010
Chehalis Basin Watershed Assessment: Description of Methods, Models, and Analysis for Water Flow Processes10-06-006March 2010
Audubon Lake′s Connection to Upper Crab Creek (Lincoln County): Source Assessment10-03-013March 2010
PBT Monitoring: PBDE Flame Retardants in Spokane River Fish, 200910-03-015March 2010
Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report07-10-073March 2010
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2006-2008 Triennial Report10-03-008March 2010
Erratum Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load Water Quality Improvement Project07-10-073bMarch 2010
General Characterization of PCBs in South Lake Washington Sediments10-03-014March 2010
Quality Assurance Project Plan: Upper Mainstem Stillaguamish River Dissolved Oxygen Study10-03-103March 2010
Quality Assurance Project Plan: Nason Creek (Chelan County) Oxbow Reconnection Monitoring10-03-104March 2010
Frequently Asked Questions: Spokane River Dissolved Oxygen TMDL Dispute Resolution10-10-015March 2010
Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation10-10-014March 2010
Frequently Asked Questions: Proposed Aquatic Mosquito Control General Permit10-10-013March 2010
Determining the Ordinary High Water Mark on Streams in Washington State (Second Review Draft)08-06-001March 2010
Errata: Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load Water Quality Improvement Project07-10-073aFebruary 2010
Frequently Asked Questions on IFIM: An Overview of the Instream Flow Incremental MethodologyQ-WR-95-104February 2010
Public Comment Period: Aquatic Mosquito Control General Permit10-10-006February 2010
Frequently Asked Questions: Solving Spokane River′s Dissolved Oxygen Shortage08-10-028January 2010
Union River Watershed Fecal Coliform Total Maximum Daily Load: Water Quality Effectiveness Monitoring10-03-001January 2010
An Assessment of the PCB and Dioxin Background in Washington Freshwater Fish, with Recommendations for Prioritizing 303(d) Listings10-03-007January 2010
Quality Assurance Project Plan Addendum: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study.06-03-105-Addendum1January 2010
Quality Assurance Project Plan: Seasonal Water Quality Study of Vancouver Lake Tributaries for PCBs, Dioxin, and Chlorinated Pesticides10-03-101January 2010
Freshwater Algae Control Program Report to the Washington State Legislature09-10-082December 2009
Clarks Creek Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan09-10-081December 2009
Water Quality Study Design (Quality Assurance Project Plan): Deschutes River Multi-parameter Total Maximum Daily Load Effectiveness Monitoring Pilot Project.09-03-133December 2009
McAllister Creek Fecal Coliform Bacteria Monitoring Summer 200909-10-094December 2009
Selecting Wetland Mitigation Sites Using a Watershed Approach (Western Washington)09-06-032December 2009
Responses to Comments: Draft Guidance on Selecting Mitigation Sites using a Watershed Approach09-06-033December 2009
Quilcene-Snow Instream Resources Protection and Watershed Management Program - WRIA 17WAC 173-517November 2009
Contaminant Loading to the Lower Duwamish Waterway from Suspended Sediment in the Green River09-03-028November 2009
Montesano Groundwater Investigation of Leaking Underground Storage Tanks: September 2008 and April 200909-03-056November 2009
Washington State Toxics Monitoring Program: Freshwater Fish Tissue Component, 200809-03-055November 2009
Quality Assurance Project Plan: Assessment of Aquatic Toxicity in North Creek, Gig Harbor.09-03-132November 2009
Frequently Asked Questions: Yakima River Watershed Toxics Study:: Progress Update09-10-088November 2009
Quality Assurance Project Plan: Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River09-03-119November 2009
Wheel-of-Water: Turns heads toward terrific new behaviors to protect aquatic treasures09-10-084October 2009
Quality Assurance Project Plan: Lake Ozette Watershed PBT Monitoring: Speciated Mercury in Stream Surface Waters09-03-129October 2009
Quality Assurance Project Plan: Deschutes River Continuous Nitrate Monitoring09-03-130October 2009
Door-to-door Outreach: Helping Streams One Home at a Time09-10-079October 2009
Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway.09-03-124October 2009
Quality Assurance Project Plan: Lower White River pH Nutrients Study.09-03-131October 2009
Wenatchee River Watershed Dissolved Oxygen and pH TMDL: Water Quality Improvement Plan -- DRAFT09-10-075October 2009
Focus on River and Stream Water Quality Monitoring Program09-03-009September 2009
Washington State Dissolved Oxygen Standard: A Review and Discussion of Freshwater Intragravel Criteria Development09-03-039September 2009
Lower Duwamish Waterway: Tracing Short-Term Movements of Suspended Sediment, Summary Report09-03-048September 2009
Quality Assurance Project Plan: Leach Creek (Pierce County) Mercury and Copper Monitoring.09-03-128September 2009
Urban Waters Initiative, 2007: Sediment Quality in Elliott Bay09-03-014September 2009
Urban Waters Initiative, 2007: Sediment Quality Changes in Elliott Bay since 1998 (Summary)09-03-031September 2009
Focus on Puget Sound's Urban Bays: Sediment Quality in Elliott Bay, 1998 to 200709-03-043September 2009
Quality Assurance Project Plan: White Salmon River Fecal Coliform Bacteria Compliance Monitoring09-03-127September 2009
Dissolved Oxygen and pH Modeling of a Periphyton Dominated, Nutrient Enriched River. Article in Journal of Environmental Engineering.09-03-049September 2009
Quality Assurance Project Plan: Monitoring Seep Water from the Port Angeles Landfill to an Intertidal Area09-03-125September 2009
Mercury Sources to Lake Ozette and Lake Dickey: Highly Contaminated Remote Coastal Lakes, Washington State, USA. Article in the journal, Water, Air, & Soil Pollution, Vol 208, No 1-4, p 275-286.09-03-047September 2009
POSTER: New Visual Tools to Use with Stream Temperature and Shade Modeling09-03-038September 2009
Quality Assurance Monitoring Plan: Continuous Monitoring for Oxygen, Temperature, pH, and Conductivity in Statewide Rivers and Streams09-03-122September 2009
Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 200809-03-044August 2009
Concise Explanatory Statement and Responsiveness Summary for the Adoption of Chapter 173-700, Wetland Mitigation Banks09-06-022August 2009
Salmon Creek Nonpoint Source Pollution Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report09-03-042August 2009
Quality Assurance Project Plan: Control of Toxic Chemicals in Puget Sound Phase 3: Characterization of Toxic Chemicals in Puget Sound and Selected Major Tributaries09-03-118August 2009
Streamflow Summary for Gaging Stations on the Snoqualmie River and Selected Tributaries, 200609-03-040August 2009
Quality Assurance Project Plan: Potential Impacts from Mercury Used in Historic Gold Mining on Six Rivers and Streams09-03-123August 2009
Implementation Plan for the Adoption of Chapter 173-700 WAC, Wetland Mitigation Banks09-06-024August 2009
Final Environmental Impact Statement: Washington State's Rule on Wetland Mitigation Banks, WAC 173-700 Wetland Mitigation Banks09-06-023August 2009
Wenatchee River Watershed Dissolved Oxygen and pH Total Maximum Daily Load: Water Quality Improvement Report08-10-062August 2009
Quality Assurance Project Plan: Skagit-Samish Watershed Intensive Surface Water Sampling for Pesticides in Salmonid-Bearing Streams09-03-120August 2009
Focus on Water Resources in the Lower Spokane River Watershed (WRIA 54)09-11-023August 2009
South Fork Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report09-10-060August 2009
River and Stream Water Quality Monitoring Report, Water Year 200809-03-041August 2009
Rule Adoption Notice - Wetland Mitigation Banks, Chapter 173-700 WAC09-06-021August 2009
Final Cost-Benefit and Least Burdensome Alternative Analysis: Chapter 173-700 WAC -Wetland Mitigation Banking09-06-026August 2009
Revised Small Business Economic Impact Statement: Chapter 173-700 WAC - Wetland Mitigation Banks09-06-027August 2009
Baseline Characterization of Nine Proposed Freshwater Sediment Reference Sites, 200809-03-032July 2009
Samish Bay Watershed Fecal Coliform Bacteria Total Maximum Daily Load - Volume 209-10-019July 2009
Setting Instream Flows in Washington State98-1813-WRJuly 2009
Quality Assurance Project Plan: Crab Creek Alternate Water Supply Route Study: Water Quality Monitoring09-03-116July 2009
Quality Assurance Project Plan: Supplemental: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study09-03-114July 2009
Total Maximum Daily Loading (TMDL) to Limit Discharges of 2,3,7,8-TCDD (Dioxin) to the Columbia River Basin09-10-058July 2009
Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Implementation Plan09-10-039July 2009
Investing in Southwest Washington and the Olympic Peninsula Communities09-01-011July 2009
Surface Water/Groundwater Exchange Along the East Fork Lewis River (Clark County), 200509-03-037June 2009
POSTER: Modeling Dissolved Oxygen in Budd Inlet and Capitol Lake09-03-034June 2009
Lake Sawyer Total Phosphorus TMDL Water Quality Implementation Plan09-10-053June 2009
Determination of PBT Chemical Trends in Selected Washington Lakes Using Age-Dated Sediment Cores, 2008 Sampling Results09-03-030June 2009
Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report09-10-030June 2009
Executive Summary of Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report09-10-030aJune 2009
Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load Study: Water Quality Effectiveness Monitoring Report09-10-045May 2009
Effect of Fluridone on Macrophytes and Fish in a Coastal Washington Lake. Article in the Journal of Aquatic Plant Management.09-03-033May 2009
POSTER: Assessing Bay-Scale Changes in Sediment Quality As Part of the Urban Waters Initiative: A New Tool for Sediment Cleanup and Watershed Managers09-03-021May 2009
POSTER: Polybrominated Diphenyl Ethers (PBDES) in Puget Sound Sediments (2004-2008)09-03-022May 2009
PBT Trend Monitoring: Lead in Suspended Particulate Matter, 200809-03-020May 2009
Straight to Implementation: Cleaner Water Faster09-10-040May 2009
Quality Assurance Project Plan: Audubon Lake's Connection to Upper Crab Creek (Lincoln County): Source Assessment09-03-112April 2009
Quality Assurance Project Plan: Okanogan River DDT and PCB Total Maximum Daily Load Effectiveness Monitoring09-03-107April 2009
Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 200609-10-034April 2009
What are Riparian Areas?92-br-003April 2009
Addendum to Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring05-03-201ADD1April 2009
Quality Assurance Project Plan: PBDE Flame Retardants in Spokane River Fish Tissues and Osprey Eggs09-03-108April 2009
Addendum 3 to Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat in Two Index Watersheds03-03-104ADD3April 2009
High-resolution Porewater Sampling Near the Groundwater/Surface Water Interface09-03-017April 2009
Entiat River Basin: Regressions for Predicting Gaged Streamflows09-03-016March 2009
Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, and PBDEs in Washington Rivers and Lakes, 200709-03-013March 2009
Barker Creek - The Future of a Watershed09-10-029March 2009
Quality Assurance Project Plan: General Characterization of PCBs in South Lake Washington Sediments.09-03-106March 2009
Quality Assurance Project Plan: Innovative Temperature Total Maximum Daily Load Pilot Study09-03-105March 2009
Preliminary Cost Benefit and Least Burden Analysis - Chapter 173-700 WAC Compensory Wetland Mitigation Banks09-06-002March 2009
Small Business Economic Impact Statement - Chapter 173-700 Wetland Mitigation Banking09-06-014March 2009
Solving Septic Impacts in the Colville Watershed09-10-021March 2009
City of Olympia -- Decatur Street LID Demonstration Project09-10-022March 2009
Focus on Wetland Mitigation Banks00-06-028March 2009
Draft Environmental Impact Statement: Washington State's Draft Rule on Wetland Mitigation Banking, WAC 173-700 Wetland Mitigation Banks01-06-022March 2009
Rule Proposal Notice: Wetland Mitigation Banks, Chapter 173-700 WAC09-06-011March 2009
Surface-water/Groundwater Interactions and Near-stream Groundwater Quality along the Palouse River, South Fork Palouse River, and Paradise Creek09-03-007February 2009
PBDE and Dioxin/Furans in Spokane Stormwater09-03-010February 2009
Montesano Groundwater Investigation of Leaking Underground Storage Tanks, October 2007 and April 200809-03-011February 2009
Quality Assurance Project Plan: Dungeness Bay and Lower Dungeness River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Effectiveness Monitoring09-03-104February 2009
Irrigation Canal Effects on Copper Levels in Water and Sediment of the Mid-Columbia and Wenatchee Rivers09-03-005February 2009
POSTER: Pesticides in Salmonid-bearing Streams in an Urban and Agricultural Watershed of the Salish Basin09-03-008February 2009
Focus On Wetland Delineation Forms09-06-010February 2009
Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills09-03-004January 2009
Streamflow Summary for Gaging Stations on the East Fork Lewis River, 2005-0609-03-002January 2009
Washington State Toxics Monitoring Program: Freshwater Fish Tissue Component, 200709-03-003January 2009
Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation01-03-064ADD1January 2009
Water Quality Study Design (Quality Assurance Project Plan): Liberty Bay Tributaries Fecal Coliform Bacteria Total Maximum Daily Load09-03-102January 2009
Summary of Watershed Characterization and Analysis Project for Clark County09-06-003January 2009
FOCUS: Safe Ballast Discharge (updated 01-09)99-1309January 2009
Focus on Deschutes Watershed08-10-103January 2009
Adaptive Management Team Total Dissolved Gas in the Columbia and Snake Rivers: Evaluation of the 115 Percent Total Dissolved Gas Forebay Requirement09-10-002January 2009
POSTER: Pesticides in Salmonid-Bearing Streams: Intensive Sampling in an Agricultural Drain08-03-014December 2008
Upper Naches River Temperature Total Maximum Daily Load: Volume 1, Water Quality Study Findings08-03-036December 2008
South Puget Sound Dissolved Oxygen Study: Interim Data Report08-03-037December 2008
Lead and Copper Concentrations in North Creek, Gig Harbor08-03-038December 2008
Making Mitigation Work: The Report of the Mitigation that Works Forum08-06-018December 2008
Walla Walla Watershed PCBs, Chlorinated Pesticides, Fecal Coliform, Temperature, pH, and Dissolved Oxygen Total Maximum Daily Load Water Quality Implementation Plan08-10-094December 2008
2008 Report to the Legislature - Progress on Watershed Planning and Setting Instream Flows08-06-027December 2008
Water Resources Management Program for the Lewis Basin, WRIA 27WAC 173-527December 2008
Water Resources Management Program for the Salmon-Washougal Basin, WRIA 28WAC 173-528December 2008
Quality Assurance Project Plan: Little Spokane River Fish Hatchery, Water Quality Monitoring for Nutrients08-03-120December 2008
Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment08-03-119December 2008
Appendix G. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings.08-03-024AppGNovember 2008
Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load: Volume 1, Water Quality Study Findings08-03-029November 2008
High Summer Bacteria Concentrations in Streams08-03-035November 2008
Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings08-03-024November 2008
Appendix B-F. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings08-03-024AppB-FNovember 2008
Appendix H. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings.08-03-024AppHNovember 2008
Quality Assurance Project Plan: Goosmus Creek Metals and Conventional Parameters Water Quality Monitoring08-03-118November 2008
Exploring Wetlands Stewardship: A Guide for Washington Landowners and Communities96-120November 2008
Focus on: Side-by-Side River and Stream Sampling Program08-03-028October 2008
Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design08-03-117October 2008
Quality Assurance Project Plan: Screening for Blue-Green Algae Toxins in Lake Fish Tissues.08-03-116October 2008
Quality Assurance Project Plan: Loading of Contaminants to the Lower Duwamish Waterway from Suspended Sediments in the Green River08-03-114September 2008
Bear-Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report08-10-058September 2008
Quality Assurance Project Plan: High-resolution, Pore-water Sampling Near the Groundwater/Surface Water Interface08-03-115September 2008
Measuring Mercury Trends in Freshwater Fish in Washington State: 2007 Sampling Results08-03-027September 2008
Addendum to Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load08-03-105ADD1September 2008
Focus on Burnt Bridge Creek08-10-081August 2008
Willapa River Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan08-10-052August 2008
Focus on Lake Whatcom TMDL: Draft study identifies limits for Lake Whatcom phosphorus and bacteria08-10-068August 2008
Pesticides in Salmonid-Bearing Streams: Intensive Sampling in an Agricultural Drain - A Cooperative Study by the Washington State Department of Ecology and the Washington State Department of Agriculture08-03-020July 2008
Henderson Inlet Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan08-10-040July 2008
Lake Whatcom Model Calibration: Memorandum to the Washington State Department of Ecology09-10-006July 2008
Bear-Evans Watershed FC TMDL: WQ Improvement Report08-10-026July 2008
Quality Assurance Project Plan: Evaluation of Candidate Freshwater Sediment Reference Sites08-03-111July 2008
Focus on Bear-Evans Watershed06-10-060July 2008
Pierre Creek and Burns Creek Fecal Coliform Bacteria Water Quality Monitoring Study08-10-060July 2008
Lower Skagit River Tributaries Temperature Total Maximum Daily Load: Water Quality Improvement Report08-10-020July 2008
River and Stream Water Quality Monitoring Report for Water Year 200708-03-019July 2008
Quality Assurance Project Plan: Burnt Bridge Creek Fecal Coliform Bacteria, Dissolved Oxygen, and Temperature Total Maximum Daily Load-Water Quality Study Design08-03-110July 2008
Quality Assurance Project Plan: Union River Fecal Coliform Total Maximum Daily Load Effectiveness Monitoring08-03-109July 2008
Progress on Watershed Planning and Setting Instream Flows - 2007 Report to the Legislature08-06-002June 2008
Focus on 2008 Legislative Session - Key Environmental Outcomes08-01-020June 2008
Focus on Bear-Evans Watershed08-10-047May 2008
Quality Assurance Project Plan: Lead and Copper Concentrations In North Creek, Gig Harbor08-03-106May 2008
History of Mercury in Selected Washington Lakes Determined from Age-Dated Sediment Cores: 2007 Sampling Results08-03-012May 2008
Fauntleroy Creek Fecal Coliform Bacteria Total Maximum Daily Load Water Quality Implementation Plan08-10-041May 2008
Puyallup and White Rivers Dissolved Oxygen and Temperature Data Summary Report08-03-013May 2008
Working for Washington's Future: Healthy Watersheds, Healthy People08-01-018May 2008
Addendum #1 to Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program07-03-104ADD1May 2008
Quality Assurance Project Plan: PBT Monitoring: Measuring Perfluorinated Compounds in Washington Rivers and Lakes08-03-107May 2008
Clarks Creek Watershed Fecal Coliform TMDL07-10-110May 2008
Transforming Watersheds: Middle Tucannon River - Columbia County08-10-036May 2008
Lake Whatcom TMDL Model - Partial Rollback Scenarios09-10-012April 2008
Lake Whatcom Models Review09-10-013April 2008
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2007 Data Summary08-03-009April 2008
Focus Sheet: Suspended Sediment and DDT in the Lower Yakima River Watershed: Progress Update08-10-023April 2008
Lake Ballinger Total Phosphorus Total Maximum Daily Load: Water Quality Attainment Monitoring Report08-03-007April 2008
Frequently Asked Questions about Tribal-State agreement to deliver water from Lake Roosevelt to farms, towns and salmon in Eastern Washington07-11-050April 2008
Focus on: The Ground Water Permit ExemptionF-WR-92-104April 2008
Snoqualmie River Basin Fecal Coliform Bacteria, Dissolved Oxygen, Ammonia-Nitrogen, and pH Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report08-03-005March 2008
Focus On: Using the Wetland Rating System in Compensatory Mitigation08-06-009March 2008
Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load: Phase 1 Water Quality Study Design08-03-105March 2008
Focus on The State Environmental Policy Act (SEPA) Reviews and TMDLs.08-06-008March 2008
Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load08-03-104February 2008
Several creeks in the Lower Skagit watershed need your help08-10-017February 2008
The Closed-Loop Scoop Newsletter, Vol. 8, Issue 108-07-002February 2008
Data Summary Report: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study08-03-001February 2008
Working Together to Protect the Columbia River: Mid-Columbia River Hydropower Projects08-10-012January 2008
Quality Assurance Project Plan: PCB and Dioxin Levels in Resident Fish from Washington Background Lakes and Rivers08-03-102January 2008
Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Dobbs Creek08-10-009January 2008
Focus Sheet: Aquatic Noxious Weed Control General Permit08-10-007January 2008
Skokomish River TMDL Cleans Up Bacteria08-10-008January 2008
Pend Oreille River Total Dissolved Gas Total Maximum Daily Load: Water Quality Improvement Report07-03-003December 2007
Spokane River PCB TMDL Stormwater Loading Analysis: Final Technical Report07-03-055December 2007
Freshwater Algae Control Program: Report to the Washington State Legislature (2006-2007)07-10-093December 2007
Skokomish River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study: Water Quality Attainment Monitoring Report07-03-054December 2007
Quality Assurance Project Plan: McAllister Creek Source Identification: Water Quality Monitoring for Fecal Coliform Bacteria and Nitrate+Nitrite-N in Medicine Creek07-10-105December 2007
Instream Resources Protection Program — Wenatchee River Basin, Water Resource Inventory Area (WRIA) 45wac173-545December 2007
Tributaries to Totten, Eld and Little Skookum Inlets Fecal Coliform Bacteria and Temperature Total Maximum Daily Load: Water Quality Implementation Plan07-10-071December 2007
Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Improvement Report06-10-045November 2007
Lake Whatcom Model Recalibration: Memorandum to the Washington State Department of Ecology09-10-009November 2007
Amendment to Lake Whatcom TMDL Final Modeling Report - Full Buildout/Rollback Scenarios and Translator: Technical memorandum from the Cadmus Group, Inc. & CDM to the Washington State Department of Ecology09-10-011November 2007
Lower Skagit River Tributaries Riparian Vegetation Change Analysis Results07-03-050November 2007
Estuarine Flow in the South Basin of Puget Sound and its Effects on Near-Bottom Dissolved Oxygen07-03-033October 2007
PCB Monitoring at Walla Walla and College Place Wastewater Treatment Plants, 2006-0707-03-046October 2007
Focus on Draft Aquatic Noxious Weed Control General Permit07-10-085October 2007
Measuring Mercury Trends in Freshwater Fish in Washington State: 2006 Sampling Results07-03-043September 2007
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, November 2006 and June 200707-03-044September 2007
Streamflow Summary for Gaging Stations on the Naches River and Rattlesnake Creek, 200407-03-042September 2007
Improving Water Quality in the Samish: Getting the manure out of streams and shellfish beds07-10-083September 2007
Focus on Fecal Coliform Bacteria in Wenatchee River Watershed07-10-077September 2007
2007-09 Public Participation Grants Guidelines (Supplemental Cycle)07-07-036August 2007
Green River and Newaukum Creek Temperature and Dissolved Oxygen Total Maximum Daily Load Study: Data Summary Report07-03-001August 2007
Addendum to Quality Assurance Monitoring Plan: Stream Ambient Water Quality Monitoring: Correction of Responsibilities and Addition of Analytes.03-03-200ADD1August 2007
Willapa River Fecal Coliform Bacteria Verification Study: Water Quality Monitoring Report07-03-039August 2007
Quality Assurance Project Plan: Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study-Water Quality Study Design07-03-110August 2007
Quality Assurance Project Plan: Dieldrin and PCB Monitoring of Wastewater Treatment Plants in the Palouse River Watershed07-03-111August 2007
Quality Assurance Project Plan: Lake Chelan Wapato Basin Total Phosphorus TMDL Effectiveness Monitoring, 200707-03-109August 2007
Clean Streams for Clean Shellfish: Stream Cleanup by Looking Around07-10-068August 2007
Helping Urban Streams: North Creek Watershed -- Fighting Flashy Flow07-10-061August 2007
Water Resources Program for the Walla Walla River Basin, WRIA 32wac173-532August 2007
Palouse River Chlorinated Pesticide and PCB Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan07-03-018July 2007
Wenatchee River Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report07-10-045July 2007
Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish in 2006: Data Summary and Comparison to Human Health Criteria07-03-036July 2007
FINAL Model Report for Lake Whatcom Watershed TMDL Model Project09-10-010July 2007
Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study.07-03-107July 2007
Mission Creek Watershed DDT Total Maximum Daily Load: Water Quality Improvement Report07-10-046July 2007
Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design07-03-108July 2007
Lower Skagit River Fecal Coliform Total Maximum Daily Load: Water Quality Implementation Plan07-10-056July 2007
Stillaguamish River Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Temperature Total Maximum Daily Load: Water Quality Implimentation Plan07-10-033June 2007
Walla Walla Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report07-10-030June 2007
Fauntleroy Creek Fecal Coliform Total Maximum Daily Load: Water Quality Improvement Report07-10-037June 2007
Similkameen River and Palmer Lake Investigation of Arsenic in Fish Tissue07-03-034June 2007
Modeling the Effects of Riparian Buffer Width on Effective Shade and Stream Temperature07-03-028June 2007
Walla Walla River Basin pH and Dissolved Oxygen Total Maximum Daily Load Study: Water Quality Improvement Report07-03-010June 2007
Willapa River Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Improvement Report07-03-021June 2007
History of Mercury in Selected Washington Lakes Determined from Age-Dated Sediment Cores: 2006 Sampling Results07-03-019June 2007
Washington State Toxics Monitoring Program: Contaminants in Fish Tissue from Freshwater Environments in 2004 and 200507-03-024June 2007
Focus On - Measuring Mercury Trends in Freshwater Fish and Lake Sediments in Washington State: 2005-2006 Sampling Results07-03-030June 2007
Living with the River: A Guide to Understanding Western Washington Rivers and Protecting Yourself from Floods07-06-016June 2007
Application of automated QUAL2Kw for water quality modeling and management in the Bagmati River, Nepal. Article in the journal, Ecological Modelling.07-03-035June 2007
Quality Assurance Project Plan: Palouse River Temperature Total Maximum Daily Load Study07-03-106June 2007
Quality Assurance Project Plan: Marion Drain Intensive Surface Water Sampling for Pesticides In Salmonid-Bearing Streams07-03-105June 2007
Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program07-03-104June 2007
Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load: Water Quality Implementation Plan07-10-016June 2007
Saginaw Mill (Aberdeen) Groundwater Monitoring Results, April and August 200607-03-029May 2007
River and Stream Water Quality Monitoring Report for Water Year 200607-03-022May 2007
Frequently Asked Questions about Hydropower Fees07-11-019May 2007
Protecting Watersheds: Teanaway River Basin - Kittitas County07-10-032May 2007
Walla Walla River Tributaries Temperature Total Maximum Daily Load Study07-03-014April 2007
Focus on Next Steps to Improve Water Quality in the Stillaguamish Watershed and Port Susan07-10-035April 2007
The Impact of Diquat on Macrophytes and Water Quality in Battle Ground Lake, Washington. Article in the Journal of Aquatic Plant Management, 45:35-39.07-03-020April 2007
Cottage Lake Total Phosphorus Total Maximum Daily Load Water Quality Implementation Plan06-10-066April 2007
Lake Campbell and Lake Erie Total Phosphorus Total Maximum Daily Load - Water Quality Effectiveness Monitoring Report07-03-011March 2007
Condition of Outer Coastal Estuaries of Washington State, 1999 - A Statistical Summary07-03-012March 2007
Vancouver Lake PCBs, Chlorinated Pesticides, and Dioxins in Fish Tissue and Sediment07-03-017March 2007
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2006 Monitoring Data Summary07-03-016March 2007
Supplemental Environmental Impact Statement (SEIS) for the Condit Dam Removal07-06-012March 2007
Washington State Wetland Rating System for Eastern Washington (Annotated Version)04-06-015March 2007
Addendum to Quality Assurance Project Plan: Surface Water Monitoring Program for Pesticides in Salmonid Bearing Streams: Addition of Wenatchee and Entiat Watersheds in the Upper Columbia Basin.03-03-104ADD2February 2007
Characterizing Stormwater for Total Maximum Daily Load Studies: A Review of Current Approaches07-03-006February 2007
Measuring Mercury Trends in Freshwater Fish in Washington State: 2005 Sampling Results07-03-007February 2007
Lake Whatcom Model calibration with variable stoichiometry in sediments - REVISED: Memorandum to the Washington State Department of Ecology09-10-008February 2007
Focus on Funding for Puget Sound Aquatic Cleanup and Restoration (Aquatics)07-09-046February 2007
Assessment of Surface Water / Groundwater Interactions and Associated Nutrient Fluxes in the Deschutes River and Percival Creek Watersheds, Thurston County07-03-002January 2007
The Washington Lake Book -- A Handbook for Lake Users97-10January 2007
Quality Assurance Project Plan: Bertrand Creek and Meadowdale Areas (Whatcom County) Follow-Up Study of EDB and 1,2-DCP in Residential Wells.07-03-102January 2007
Whatcom Creek Fecal Coliform Total Maximum Daily Load Report: Water Quality Improvement Plan -- DRAFT06-10-041January 2007
Focus on Hydropower Dams & Water Quality06-10-098January 2007
Department of Ecology Status Report: 2006 Supplemental Budget Reducing toxic threats, cleaning up Puget Sound and managing our water07-01-015January 2007
Focus on Water Temperature in the Upper Yakima River Basin07-10-008January 2007
Addendum to Quality Assurance Project Plan: Naches River Temperature Total Daily Maximum Load Study.04-03-110ADDJanuary 2007
Focus Sheet: Capture and Reuse of Irrigation WaterF-WR-92-108January 2007
2006 Report to the Legislature: Progress on Watershed Planning and Setting Instream Flows06-11-046December 2006
Replicate Precision for 12 TMDL Studies and Recommendations for Precision Measurement Quality Objectives for Water Quality Parameters06-03-044December 2006
Status and Trends Monitoring for Watershed Health and Salmon Recovery: Quality Assurance Monitoring Plan06-03-203December 2006
Effectiveness of Timber Harvest Practices for Controlling Sediment Related Water Quality Impacts. Article in Journal of the American Water Resources Association, October 2006, p. 1307-1327.06-03-046December 2006
Wilson Creek Sub-basin Bacteria Total Maximum Daily Load Detailed Implementation Plan06-10-065December 2006
Quality Assurance Project Plan: Puyallup River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Study06-03-115December 2006
Quality Assurance Project Plan: Similkameen River and Palmer Lake Investigation of Arsenic in Fish Tissue06-03-118December 2006
Status of the Wetland Mitigation Banking Pilot Program December, 2006 Status Report06-06-026December 2006
2006 TMDL Workload Assessment06-10-092December 2006
Washington State Water Quality Conditions in 2005, based on Data from the Freshwater Monitoring Unit06-03-030November 2006
Washington State Water Quality Conditions in 2005, based on Data from the Freshwater Monitoring Unit: Technical Appendix06-03-031November 2006
An Evaluation of a Piezometer-Based Constant Head Injection Test (CHIT) for use in Groundwater/Surface Water Interaction Studies06-03-042November 2006
Colville National Forest Temperature and Bacteria Total Maximum Daily Load: Water Quality Implementation Plan06-10-059October 2006
Pullman Stormwater Pilot Study for Pesticides, PCBs, and Fecal Coliform Bacteria, 2005-200606-03-034October 2006
Henderson Inlet Watershed Fecal Coliform Bacteria, Dissolved Oxygen, and pH Total Maximum Daily Load: Water Quality Improvement Report Implementation Strategy06-10-058October 2006
PCB Monitoring at Walla Walla Wastewater Treatment Plants06-03-114October 2006
Addendum to Quality Assurance Project Plan: Pend Oreille River Temperature TMDL04-03-109ADDOctober 2006
Sampling and Analysis Plan and Quality Assurance Project Plan: Green River and Newaukum Creek Temperature and Dissolved Oxygen Study06-03-110October 2006
Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores.06-03-113October 2006
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2003-2005: A Cooperative Study by the Washington State Departments of Ecology and Agriculture06-03-036October 2006
Sampling and Analysis Plan and Quality Assurance Project Plan: Bear/Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load Study06-03-107September 2006
Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study06-03-112September 2006
Appendix A: A Summary of Landuse, Landcover, Stream Flow, and Water Quality Data for Watersheds of Streams, Piped Catchments, Open Watersheds, and Nearshore Areas Draining into Sinclair and Dyes Inlets05-03-042appASeptember 2006
Appendix B: Raw Data05-03-042appBSeptember 2006
Appendix C: Precipitation Data; Impervious Surface Summary; Land Use/Land Cover Analysis05-03-042appCSeptember 2006
Appendix D: Overview of Microbial Source Tracking05-03-042appDSeptember 2006
Appendix E. Fecal Coliform Loading05-03-042appESeptember 2006
Appendix F. A Modeling Study of Combined Sewer Overflows in the Port Washington Narrows and Fecal Coliform Transport in Sinclair and Dyes Inlets05-03-042appFSeptember 2006
Quality Assurance Project Plan: Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish - 2006: Assessing Progress Toward TMDL Targets and Updating the Fish Consumption Advisory06-03-111September 2006
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 200606-03-035September 2006
Results from Monitoring Endosulfan and Dieldrin in Wide Hollow Creek, Yakima River Drainage, 2005-0606-03-038September 2006
Yakima River Watershed Toxics Study06-10-069September 2006
Stillaguamish River Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report -- Vol. 2: Implementation Strategy06-10-057September 2006
Transforming Watersheds: Upper Cow Creek -- Adams County06-10-051September 2006
Welcome to the Watershed: Spokane River06-10-056September 2006
River and Stream Water Quality Monitoring Report for Water Year 200506-03-032September 2006
PCBs, PBDEs, and Selected Metals in Spokane River Fish, 200506-03-025August 2006
PBDEs Flame Retardants in Washington Rivers and Lakes: Concentrations in Fish and Water, 2005-0606-03-027August 2006
Quality Assurance Project Plan: Puyallup and White Rivers Temperature and Dissolved Oxygen Monitoring06-03-204August 2006
Quality Assurance Project Plan: Old Stillaguamish River Multi-Parameter Total Maximum Daily Load Study06-03-108August 2006
Washington State Wetland Rating System for Western Washington (Annotated Version)04-06-025August 2006
Quality Assurance Project Plan: Snoqualmie River Temperature Total Maximum Daily Load Study06-03-106July 2006
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan06-10-018July 2006
Washington Water Laws - A Primer98-152July 2006
Focus Sheet: Managing Water in the Entiat River Basin04-11-022July 2006
Moses Lake Phosphorus-Response Model and Recommendations to Reduce Phosphorus Loading06-03-011June 2006
Zinc and Copper Concentrations in an Industrial Area Creek during Storm Events06-03-023June 2006
Chapter 173-201A WAC: Small Business Economic Impact Statement for the Proposed Changes to Washington′s Surface Water Quality Standards06-10-047June 2006
Quality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study06-03-105June 2006
Focus on Spokane River Studies06-10-046June 2006
Selah Ditch Multiparameter Total Maximum Daily Load: Water Quality Improvement Report06-10-040June 2006
National Coastal Wetland Conservation Grant Application Lower Tarboo Creek Wetland Acquisition and Floodplain Restoration - Phase II0706006June 2006
Quality Assurance Project Plan: South Fork Palouse River Temperature Total Maximum Daily Load Study06-03-104June 2006
Focus on Samish Watershed06-10-030June 2006
Lower Yakima River Suspended Sediment Total Maximum Daily Load: Effectiveness Monitoring Report06-03-014May 2006
Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 200306-03-019May 2006
Instream Resources Protection Program -- Lower And Upper Skagit Water Resources Inventory Area (WRIA 3 And 4)wac173-503May 2006
North Fork Palouse River Fecal Coliform Total Maximum Daily Load: Water Quality Implementation Plan06-10-028May 2006
Wenatchee River Basin Dissolved Oxygen, pH, and Phosphorus Total Maximum Daily Load Study06-03-018April 2006
Protecting Washington State's Waters (TMDL Video)06-10-027April 2006
Lake Chelan Watershed DDT and PCB Total Maximum Daily Load: Water Quality Improvement Report06-10-022April 2006
Focus on Swamp Creek06-10-023April 2006
Quality Assurance Project Plan: Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load Study06-03-102March 2006
Tributaries to Totten, Eld, and Little Skookum Inlets - Fecal Coliform Bacteria and Temperature Total Maximum Daily Load: Water Quality Improvement Report06-03-007March 2006
Wetland Mitigation in Washington State - Part 1: Agency Policies and Guidance06-06-011aMarch 2006
Wetland Mitigation in Washington State - Part 2: Developing Mitigation Plans06-06-011bMarch 2006
Walla Walla River Chlorinated Pesticides and PCBs Total Maximum Daily Load (Water Cleanup Plan): Submittal Report05-10-079March 2006
Henderson Inlet Watershed Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Temperature Total Maximum Daily Load Study06-03-012March 2006
Wenatchee Watershed Planning06-10-008March 2006
Addendum to Quality Assurance Project Plan for Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams: Addition of Skagit-Samish Watersheds, and Extension of Program through June 2009.03-03-104ADDMarch 2006
Willapa River Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan06-10-017February 2006
Draft Protecting Aquatic Resources Responses to Comments - Using Landscape Characterization: A Guide for Puget Sound Planner06-06-009February 2006
Hangman Creek Watershed06-10-014February 2006
Quality Assurance Project Plan: Willapa River Fecal Coliform Bacteria Verification Study06-03-202February 2006
Groundwater-Surface Water Interactions along the Naches and Tieton Rivers, Summer and Fall 200406-03-003January 2006
Native Plants for Aquatic Gardens and Aquariums: A guide for using plants native to the Northwestern U.S. in decorative ponds and aquariums06-03-004January 2006
Lake Tapps (Pierce County) Monitoring, Final Data Report06-03-006January 2006
Upper White Watershed Sediment and Temperature Total Maximum Daily Load (Water Cleanup Plan) for Aquatic Habitat: Detailed Implementation Plan05-10-038January 2006
Water Quality Improvement Projects also known as Total Maximum Daily Loads (TMDLs): What should I know? What does it mean to me?05-10-100January 2006
Advisory Groups for Water Quality Improvement Projects (TMDLs)05-10-101January 2006
Palouse River Watershed06-10-002January 2006
Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study06-03-201January 2006
Washington State Water Quality Conditions in 2004, based on Data from the Freshwater Monitoring Unit05-03-036December 2005
Washington State Water Quality Conditions in 2004, based on Data from the Freshwater Monitoring Unit: Technical Appendix05-03-037December 2005
Quality Assurance Project Plan (Revised): Little Spokane River Watershed Total Maximum Daily Load Study05-03-121December 2005
Wenatchee River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study05-03-012December 2005
Washington State Groundwater Assessment Program: Hydrology and Quality of Groundwater in the Centralia-Chehalis Area Surficial Aquifer05-03-040December 2005
Quality Assurance Project Plan: PCBs and Other Contaminants in Spokane River Fish, 200505-03-120December 2005
Focus on Aquatic Plant and Algae Management Draft Permit05-10-102December 2005
Walla Walla River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study05-03-041December 2005
Focus on Fecal Coliform Bacteria02-10-010December 2005
Focus on Wilson Creek Sub-basin Bacteria TMDL03-10-022December 2005
River and Stream Water Quality Monitoring Report for Water Year 200405-03-038December 2005
Focus on Upper Yakima Basin - Restoration plan targets sediments01-10-003December 2005
Focus on Teanaway Basin - A plan to improve stream temperatures01-10-020December 2005
An Analysis of Microbial Pollution in the Sinclair-Dyes Inlet Watershed05-03-042December 2005
Quality Assurance Project Plan: Continuous Stream Temperature Monitoring by the Freshwater Monitoring Unit05-03-202December 2005
Quality Assurance Project Plan: Comparison of Stream Temperature Monitoring Protocols used by the Environmental Monitoring and Trends Section05-03-205December 2005
Protecting Aquatic Ecosystems: A Guide for Puget Sound Planners to Understand Watershed Processes05-06-027December 2005
Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study05-03-115November 2005
Old Stillaguamish River Channel Diel Surveys, July and September 200405-03-035October 2005
Lower Similkameen River Arsenic Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan05-10-074October 2005
Investigation of Petroleum Products in Black Lake Sediment and Surface Water Adjacent to an Underground Storage Tank Site05-03-030September 2005
Quality Assurance Project Plan: PBT Monitoring: Measuring PBDE Levels in Washington Rivers and Lakes05-03-113September 2005
QUAL2Kw - A framework for modeling water quality in streams and rivers using a genetic algorithm for calibration05-03-044September 2005
Quality Assurance Monitoring Plan: Streamflow Gaging Network05-03-204September 2005
Quality Assurance Project Plan: Metals Concentrations from Stormwater Runoff in an Industrial Area Creek05-03-112September 2005
Wenatchee River Temperature Total Maximum Daily Load Study05-03-011August 2005
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, April through October, 2004: A Cooperative Study by the Washington State Departments of Ecology and Agriculture05-03-025August 2005
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 200505-03-027August 2005
Flow Summary for Gaging Stations on Selected Tributaries of the Walla Walla River05-03-029August 2005
Quality Assurance Project Plan: Pataha Creek Effectiveness Monitoring Total Maximum Daily Load Study05-03-203August 2005
Gibbons Creek Watershed Fecal Coliform Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan05-10-078August 2005
Assessment of Surface Water and Groundwater Interchange in the Walla Walla River Watershed05-03-020August 2005
Changes and Trends in Puget Sound Sediments: Results of the Puget Sound Ambient Monitoring Program, 1989-200005-03-024August 2005
Willapa River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report and Detailed Implementation Plan05-10-073August 2005
Water Resources Management Program--Entiat River Basin Water Resource Inventory Area - WRIA 46wac173-546August 2005
Colville River Watershed Fecal Coliform Bacteria Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan05-10-045August 2005
Estimating Discharge and StreamFlows: A Guide for Sand and Gravel Operators05-10-070August 2005
Lake Whatcom Water Quality Model09-10-007July 2005
Assessment of Total Dissolved Gas in the Spokane River at Upriver and Little Falls Dams05-03-010July 2005
Temporal Monitoring of Puget Sound Sediments: Results of the Puget Sound Ambient Monitoring Program, 1989-200005-03-016July 2005
Groundwater Data Summary for the Wenatchee River Watershed Total Maximum Daily Load Study05-03-018July 2005
Colville National Forest Temperature, Bacteria, and pH Total Maximum Daily Load (Water Cleanup Plan): Submittal Report05-10-047July 2005
Thermal Infrared Radiometry: Taking the Temperature of the North and South Fork Palouse Rivers05-10-065July 2005
Lake Chelan DDT and PCBs in Fish Total Maximum Daily Load Study05-03-014June 2005
Flow Summary for Gaging Stations on the Wenatchee River and Selected Tributaries05-03-015June 2005
Verification of 303(d) Listings for Fish Tissue in the Skagit and Pend Oreille Rivers05-03-017June 2005
Wilson Creek Sub-Basin Bacteria Total Maximum Daily Load (Water Cleanup Plan): Submittal Report05-10-041June 2005
Final Environmental Impact Statement - Ahtanum Creek Watershed Restoration Program05-06-016June 2005
Quality Assurance Project Plan: Upper Yakima Basin Temperature Total Maximum Daily Load Study05-03-111June 2005
Nisqually Watershed Bacteria and Dissolved Oxygen Total Maximum Daily Load (Water Cleanup Plan): Submittal Report05-10-040June 2005
Puyallup and White Rivers Temperature and Dissolved Oxygen July - November 2004 Monitoring Report05-10-053June 2005
Quality Assurance Project Plan: East Fork Lewis River Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study05-03-110June 2005
Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study05-03-002May 2005
Appendices: Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study05-03-002appMay 2005
Focus on Bacteria in the Issaquah Creek Basin05-10-054May 2005
Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish05-03-106May 2005
Quality Assurance Project Plan: Total Maximum Daily Load Analysis for Temperature in Tributaries to Oakland Bay-Hammersley Inlet: Mill Creek, Cranberry Creek, and Johns Creek05-03-107May 2005
Little Bear Creek Water Cleanup Plan for Fecal Coliform Bacteria, Total Maximum Daily Load - Submittal Report05-10-034May 2005
VEAT 2004 - Vessel Entries and Transits for Washington Waters05-08-003May 2005
Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Arsenic, and Mercury Total Maximum Daily Load (Water Cleanup Plan) - Submittal Report05-10-044May 2005
A Comparison of Water Quality Data Collected from Two Washington Rivers by the Department of Ecology and the U.S. Geological Survey05-03-009April 2005
Water Quality Certifications for Existing Hydropower Dams: Guidance Manual04-10-022April 2005
Focus Sheet: Water Cleanup Planning in the East Fork Lewis River Watershed05-03-013April 2005
Focus on Aquatic Permits05-10-048April 2005
Spatial Extent of Dioxin/Furan Contaminated Sediments in Dillenbaugh Creek05-03-008April 2005
Quality Assurance Project Plan: Investigation of Petroleum Products in Black Lake Sediment and Surface Water from Underground Tanks.05-03-105April 2005
Concentrations of 303(d) Listed Pesticides, PCBs, and PAHs Measured with Passive Samplers Deployed in the Lower Columbia River05-03-006March 2005
Effects of Small-Scale Gold Dredging on Arsenic, Copper, Lead, and Zinc Concentrations in the Similkameen River05-03-007March 2005
Little Klickitat River Watershed Temperature TMDL: Detailed Implementation Plan04-10-075March 2005
Salmon Creek Watershed Bacteria and Turbidity Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan05-10-037March 2005
Frequently Asked Questions about Protecting Oxygen in the Spokane River05-10-036March 2005
Lower Okanogan River Basin DDT and PCBs Total Maximum Daily Load: Submittal Report04-10-043February 2005
Quality Assurance Project Plan: Saginaw Mill Groundwater Monitoring05-03-102February 2005
North Fork Palouse River Fecal Coliform Total Maximum Daily Load: Submittal Report04-10-067February 2005
Focus on Little Bear Creek05-10-024February 2005
Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study, Data Summary Report05-03-003February 2005
Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring05-03-201February 2005
Selah Ditch Multiparameter Total Maximum Daily Load: Technical Assessment05-10-020February 2005
Focus on Interim Wastewater Permitting05-10-006January 2005
Focus on Hydropower Dam Licensing and Water Quality05-10-010January 2005
Lake Whatcom Total Maximum Daily Load Groundwater Study05-03-001January 2005
Focus on Water Quality Cleanup Plan for Port Susan and Stillaguamish Watershed04-10-085January 2005
Quality Assurance Project Plan: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study05-03-101January 2005
2004 Report to the Legislature: Watershed Planning and Instream Flow Setting Progress04-11-035December 2004
Dungeness River and Matriotti Creek Post-Total Maximum Daily Load Data Review04-03-053December 2004
The Chehalis/Grays Harbor Watershed Dissolved Oxygen, Temperature, and Fecal Coliform Bacteria TMDL: Detailed Implementation (Cleanup) Plan04-10-065December 2004
Results of a Screening Analysis for Pharmaceuticals in Wastewater Treatment Plant Effluents, Wells, and Creeks in the Sequim-Dungeness Area04-03-051November 2004
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, April to December, 2003: A Cooperative Study Conducted by the Washington State Departments of Ecology and Agriculture04-03-048November 2004
Clean Water Strategy for addressing Bacteria Pollution in Dungeness Bay and Watershed and Water Cleanup Detailed Implementation Plan04-10-059November 2004
Quality Assurance Project Plan: Verification of 303(d) Listings for Fish Tissue in the Skagit and Pend Oreille Rivers04-03-115November 2004
A Total Maximum Daily Load Evaluation for Chlorinated Pesticides and PCBs in the Walla Walla River04-03-032October 2004
DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County: Total Maximum Daily Load Assessment04-03-043October 2004
Quality Assurance Project Plan: Old Stillaguamish River Channel Diel Surveys.04-03-113October 2004
Upper White Watershed Temperature Data Report: 1989 to 200304-10-061September 2004
Quality Assurance Project Plan: Naches River Temperature Total Maximum Daily Load04-03-110September 2004
Quality Assurance Project Plan: Fecal Coliform Bacteria TMDL for Oakland Bay-Hammersley Inlet and Tributaries04-03-111September 2004
Quality Assurance Project Plan: Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell04-03-206September 2004
Willapa River Watershed Temperature Total Maximum Daily Load Study04-03-024September 2004
Quality Assurance Project Plan: Pend Oreille River Temperature Total Maximum Daily Load Technical Study04-03-109September 2004
Condition of Fresh Waters in Washington State for the Year 2003: Technical Appendix04-03-034August 2004
Water Quality Program Responsiveness Summary: Fiscal Year 2005 Water Cleanup Plans TMDLs04-10-071August 2004
Data Summary: Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Arsenic Total Maximum Daily Load Study04-03-037August 2004
Whatcom Creek Fecal Coliform Total Maximum Daily Load Study04-03-015August 2004
Washington's Water Quality Management Plan to Control Nonpoint Sources of Pollution - Volume 104-10-063August 2004
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 200404-03-038August 2004
DRAFT Wetlands in Washington State, Volume 2: Guidance for Protecting and Managing Wetlands04-06-024August 2004
The impact of endothall on the aquatic plant community of Kress Lake, Washington. Journal of Aquatic Plant Management 42: 109-114.04-03-057July 2004
Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Mercury, and Arsenic Total Maximum Daily Load Study04-03-017July 2004
River and Stream Water Quality Monitoring Report for Water Year 200304-03-031July 2004
Verification of 303(d)-listed Sites in Northwest, Central, and Eastern Regions of Washington State04-03-035July 2004
Quality Assurance Project Plan: Lake Tapps Monitoring04-03-204July 2004
Quality Assurance Project Plan: Lake Bacteria Sampling Project04-03-202July 2004
Guidance for Integrated Aquatic Vegetation: Management Plans04-10-053July 2004
Quality Assurance Project Plan: Effects of Small-Scale Gold Dredging on Metals Concentrations in the Similkameen River04-03-108July 2004
Cómo Comentar Eficazmente sobre Proyectos de Limpiar las Aguas04-10-039esJuly 2004
Guide to Healthy Streams, Lakes, and Wetlands for Small Farms and Rural Landowners in Eastern Washington01-10-014July 2004
Issaquah Creek Basin Water Cleanup Plan for Fecal Coliform Bacteria: Submittal Report04-10-055July 2004
Cottage Lake Total Maximum Daily Load Analysis: Submittal Report03-10-085June 2004
Flow Summary for Gaging Stations on the Willapa River and Selected Tributaries04-03-023June 2004
Total Maximum Daily Load for Total Dissolved Gas in the Mid-Columbia River and Lake Roosevelt04-03-002June 2004
Supplemental Environmental Impact Statement Assessments of Aquatic Herbicides: Volume 5: Triclopyr04-10-015June 2004
How to Comment Effectively on Water Cleanup Plans04-10-039June 2004
Focus on Lake-Friendly Landscaping04-10-046June 2004
Mercury in Lake Whatcom Sediments: Spatial Distribution, Depositional History, and Tributary Inputs04-03-019June 2004
Groundwater Contributions to Siebert Creek (Clallam County) During the Summer of 200304-03-021May 2004
North Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Recommendations04-03-022May 2004
Upper Chehalis River Fecal Coliform Bacteria Total Maximum Daily Load: Submittal Report04-10-041May 2004
Quality Assurance Project Plan: Tributaries to Totten, Eld, and Little Skookum Inlets Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study04-03-106May 2004
Quality Assurance Project Plan: Pend Oreille River Total Dissolved Gas Total Maximum Daily Load Technical Study04-03-107May 2004
Nutrient Criteria Development in Washington State - Phosphorus04-10-033May 2004
Wind River Watershed Temperature Total Maximum Daily Load:Detailed Implementation Plan04-10-037May 2004
Focus on Bacteria in the Issaquah Creek Basin04-10-038May 2004
Little Squalicum Creek Screening Level Assessment04-03-014April 2004
DRAFT - Guidance on Wetland Mitigation in Washington State, Part 1: Laws, Rules, Policies and Guidance Related to Wetland Mitigation04-06-013aApril 2004
DRAFT - Guidance on Wetland Mitigation in Washington State, Part 2: Guidelines for Developing Wetland Mitigation Plans and Proposal04-06-013bApril 2004
Upper Chehalis River Fecal Coliform Bacteria Total Maximum Daily Load Recommendations04-03-004April 2004
Draft Washington State Wetland Rating System for Western Washington - Revised04-06-014April 2004
Water Cleanup Plan for Bacteria in Dungeness Bay:Total Maximum Daily Load (TMDL) Submittal Report04-10-026April 2004
Assessment of Changes in Water Quality in the Spokane River Between Riverside State Park and the Washington-Idaho Border04-03-007April 2004
Chehalis River Basin, WRIAs 22 and 23, Fish Habitat Analysis Using the Instream Flow Incremental Methodology04-11-006April 2004
Stillaguamish River Watershed Temperature Total Maximum Daily Load Study04-03-010March 2004
Quality Assurance Project Plan: Snoqualmie River Total Maximum Daily Load Effectiveness Evaluation04-03-201March 2004
Dungeness Bay Fecal Coliform Bacteria Total Maximum Daily Load Study04-03-012March 2004
Trophic State Census of Washington State Lakes by Satellite Imagery04-03-011March 2004
Level 1 Technical Assessment: WRIA 60, Kettle River Watershed04-06-012March 2004
Third Screening Investigation of Water and Sediment Quality of Creeks in Ten Washington Mining Districts, with Emphasis on Metals04-03-005February 2004
Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen04-03-006February 2004
Entiat and Mad Rivers Fish Habitat Analysis Using the Instream Flow Incremental Methodology95-166February 2004
Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study04-03-103February 2004
Lower Similkameen River Arsenic Total Maximum Daily Load: Submittal Report03-10-074February 2004
Lower Skagit River Tributaries Temperature Total Maximum Daily Load Study04-03-001January 2004
Squalicum Creek Toxics Screening Study04-03-003January 2004
Focus on Cottage Lake Cleanup Plan04-10-013January 2004
Focus on Water Cleanup Plans04-10-002January 2004
Meeting Notice: Workshops on Water Quality Assessment Including Update of "Polluted Waters" List04-10-006January 2004
Focus on finishing and using local watershed plans04-06-02January 2004
Quality Assurance Project Plan: Spatial Extent of Dioxin/Furan Contaminated Sediments in Dillenbaugh Creek04-03-101January 2004
Johnson Creek Watershed Bacteria Total Maximum Daily Load: Detailed Implementation Plan03-10-079January 2004
Focus on finishing and using local watershed plans04-06-0022004
2003 Report to the Legislature: Instream Flow Setting Progress across the State04-11-0012004
Oceanographic Changes in Puget Sound and the Strait of Juan de Fuca during the 2000-01 Drought. Article in Canadian Water Resources Journal, Vol. 28, No. 4, p. 715-728 (2003).03-03-053December 2003
Focus on Prior Converted Croplands/Wetlands - Clarifying State Authority and the Regulatory Process03-06-032December 2003
Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load: Detailed Implementation Plan03-10-058December 2003
Wetlands are Home: A Guide to Washington's Wetlands Poster03-06-033December 2003
Colville River Dissolved Oxygen Total Maximum Daily Load: Submittal Report03-10-029December 2003
Quality Assurance Project Plan: Verification of 303(d) Listed Sites in Northwest, Central, and Eastern Regions of Washington State03-03-112December 2003
A Framework for Delineating Channel Migration Zones03-06-027November 2003
Wenatchee National Forest Water Temperature Total Maximum Daily Load: Technical Report03-10-063November 2003
Final EIS - Dungeness River Agricultural Water Users Association Comprehensive Water Conservation Plan03-11-016November 2003
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 200303-03-046October 2003
Quality Assurance Project Plan: Little Squalicum Creek Biological Toxicity Assessment03-03-110October 2003
Padden Creek Pesticide Study: Final Report03-03-048October 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River03-03-107October 2003
Water Quality Program Responsiveness Summary--Fiscal Year 2004 TMDL Priority List03-10-083October 2003
Quality Assurance Project Plan: Monitoring 303(d) Listed Pesticides, PCBs, and PAHs in the Lower Columbia River Drainage Using a Semipermeable Membrane Device03-03-108October 2003
North Creek Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan03-10-047October 2003
Meeting Notice: Mosquito Control Methods To Be Revised03-10-081October 2003
Aquatic Plants Technical Assistance Program, 2002 Activity Report03-03-033September 2003
Focus on Little Klickitat River03-10-075September 2003
Development of Freshwater Sediment Quality Values for Use in Washington State: Phase II Report03-09-088September 2003
Data Summary: Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen03-03-023August 2003
Quality Assurance Project Plan: Lake Bacteria Sampling Project03-03-201August 2003
Total Maximum Daily Load for Lower Snake River Total Dissolved Gas03-03-020August 2003
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, pH, and Fecal Coliform Total Maximum Daily Load, Year 2 Technical Study03-03-106August 2003
Upper White Watershed Spring Chinook Redd, Scour, and Cross-Section Assessments: 1995 - 200103-10-071August 2003
Quality Assurance Project Plan: TMDL Effectiveness Monitoring and Water Quality Evaluation in the Lower Yakima River04-03-203July 2003
TMDL Technical Assessment of DDT and PCBs in the Lower Okanogan River Basin03-03-013July 2003
Symposium Article: Total Maximum Daily Load Effectiveness Monitoring Strategy for Washington State03-03-039July 2003
Focus on Public Involvement with Your Community′s Water Quality03-10-067July 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan03-03-105July 2003
Upper Humptulips River Temperature Total Maximum Daily Load: Detailed Implementation Plan03-10-042July 2003
Inner Bellingham Bay Contaminated Sediments TMDL: Detailed Implementation Plan03-10-057July 2003
Condition of Fresh Waters in Washington State for the Year 200203-03-030June 2003
Condition of Fresh Waters in Washington State for the Year 2002: Technical Appendix03-03-031June 2003
River and Stream Ambient Monitoring Report for Water Year 200203-03-032June 2003
Lower Snohomish River Tributaries Fecal Coliform Bacteria Total Maximum Daily Load:Detailed Implementation Plan03-10-031June 2003
Ecology/Health Responses to Public Comments Received on the Draft Mercury Chemical Action Plan03-03-029June 2003
Mt. Baker Snoqualmie National Forest Upper White Watershed Sediment and Temperature TMDL for Aquatic Habitat: Submittal Report03-10-032June 2003
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report03-10-055June 2003
Focus on Proposed Water Cleanup Plans03-10-056June 2003
Mercury in Edible Fish Tissue and Sediments from Selected Lakes and Rivers of Washington State03-03-026June 2003
Focus on Mercury in Fish: Study finds elevated levels in Washington fish03-03-036June 2003
Frequently Asked Questions about Mercury in Bass03-03-037June 2003
Focus on Cleaning Up Water Pollution03-10-040June 2003
Little Klickitat River Watershed Temperature Total Maximum Daily Load:Submittal Report03-10-046June 2003
Effectiveness Monitoring for Fecal Coliform Total Maximum Daily Loads in Pipers Creek03-03-027June 2003
Quality Assurance Monitoring Plan: Stream Ambient Water Quality Monitoring, Revision of 1995 Version03-03-200June 2003
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study03-03-021June 2003
Focus on Water Temperatures in the Lower Skagit River Tributaries03-10-039June 2003
Stormwater Management MANUAL for Eastern Washington - FINAL DRAFT - Chapters 1 through 403-10-038AJune 2003
Stormwater Management MANUAL for Eastern Washington - FINAL DRAFT - Chapter 4 Maps03-10-038AmapsJune 2003
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Chapters 5 and 603-10-038BJune 2003
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Chapters 7 and 803-10-038CJune 2003
Stormwater Management MANUAL for Eastern Washington - DRAFT FINAL - Glossary, Bibliography, Cost Analysis, and Response to Comments03-10-038DJune 2003
Colville River Watershed Bacteria Total Maximum Daily Load: Submittal Report - Amended03-10-030May 2003
Focus on North Creek Water Quality Action Plan03-10-043May 2003
Focus on Moses Lake Water Cleanup Plan03-10-048May 2003
Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds: A Study for the Washington State Department of Agriculture by the Washington State Department of Ecology03-03-104May 2003
Investigation of Background Inorganic and Organic Arsenic in Four Washington Lakes03-03-024May 2003
Lake Chelan DDT/PCB Watershed Cleanup Plan03-10-035May 2003
Flow Summary for Gaging Stations on the Stillaguamish River and Selected Tributaries, May through October 200103-03-019April 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT Contamination and Transport in the Lower Mission Creek Basin, Chelan County, Washington03-03-103April 2003
Skokomish River Detailed Implementation Plan for Fecal Coliform Bacteria02-10-072April 2003
Verification of 1998 303(d) PCB Listing, Inner Budd Inlet03-03-016April 2003
Teanaway Temperature Total Maximum Daily Load: Detailed Implementation Plan03-10-025April 2003
Groundwater/Surface Water Interactions in the Upper Sammamish River: A Preliminary Analysis03-03-015March 2003
Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation03-03-102March 2003
Focus on White River pH Water Cleanup Plan03-10-026March 2003
Washington Water Acquisition Program: Finding Water to Restore Streams03-11-005March 2003
Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 200103-03-012March 2003
Final Environmental Impact Statement for Watershed Planning Under Chapter 90.82 RCW03-06-013March 2003
Sediment Toxicity Near Gas Works Park, Lake Union, Seattle03-03-014March 2003
Focus on National Pollutant Discharge Elimination System (NPDES) Permits for Aquatic Pest Control03-10-007March 2003
Focus on Water Quality Permit Fees03-10-008March 2003
Focus on Water Cleanup Plans03-10-010March 2003
A Guide to Instream Flow Setting in Washington State03-11-007March 2003
Focus on South Prairie Creek03-10-024March 2003
An Assessment of Watershed Planning - Report to the Legislature03-06-009March 2003
Moses Lake Total Maximum Daily Load Groundwater Study03-03-005February 2003
Norfolk Combined Sewer Overflow (Duwamish River) Sediment Cap Recontamination, Phase I Investigation03-03-004February 2003
Washington State Mercury Chemical Action Plan03-03-001February 2003
Quality Assurance Project Plan: Henderson and Nisqually TMDL Study03-03-100February 2003
Total Mercury Concentrations among Fish and Crayfish Inhabiting Different Trophic Levels in Lake Whatcom, Washington. Article in Journal of Freshwater Ecology, Volume 71, Number 4, p. 621-633, December 2002.03-03-008February 2003
Effectiveness Monitoring for Dioxin Total Maximum Daily Loads in Western Washington03-03-002January 2003
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load: Detailed Implementation Plan03-10-0042003
Water Quality Assessments of Volunteer-Monitored Lakes Within Washington State, 1998-199902-03-019December 2002
Appendices for "Water Quality Assessments of Volunteer-Monitored Lakes Within Washington State, 1998-1999"02-03-019appDecember 2002
Washington State Marine Water Quality, 1998 through 200002-03-056December 2002
2002 Index Watershed Salmon Recovery Monitoring Report02-03-061December 2002
Quality Assurance Project Plan: Characterization of Groundwater Discharge to Lake Whatcom02-03-082December 2002
Quality Assurance Project Plan: Monitoring for Nitrate Trends in the Central Sumas-Blaine Surficial Aquifer02-03-084December 2002
Grays Harbor/Chehalis Watershed Fecal Coliform Bacteria Total Maximum Daily Load Submittal Report01-10-025December 2002
Quality Assurance Project Plan: Squalicum Creek Toxics Screening Study02-03-083December 2002
Arsenic Concentrations in Three Palmer Lake Sediment Samples02-03-058December 2002
Walla Walla River Fish Habitat Analysis Using the Instream Flow Incremental Methodology02-11-009December 2002
Focus: Lake Whatcom Cleaning up Water Pollution02-10-070December 2002
Evaluating Standards for Protecting Aquatic Life in Washington's Surface Water Quality Standards Temperature Criteria Draft Discussion Paper and Literature Summary00-10-070December 2002
Evaluating Criteria for the Protection of Aquatic Life in Washington's Surface Water Quality Standards Dissolved Oxygen Draft Discussion Paper and Literature Summary00-10-071December 2002
Effectiveness Monitoring for Total Phosphorus Total Maximum Daily Loads in Fenwick and Sawyer Lakes02-03-054December 2002
A Water Quality Index for Ecology's Stream Monitoring Program02-03-052December 2002
Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent to the B&L Landfill, Milton02-03-053November 2002
Total Dissolved Gas Monitoring Results Columbia and Snake Rivers, May-July 200202-03-051November 2002
A Total Maximum Daily Load Evaluation for Arsenic in the Similkameen River02-03-044November 2002
Analysis of Fish Tissue from Long Lake (Spokane River) for PCBs and Selected Metals02-03-049November 2002
Development of Freshwater Sediment Quality Values for Use in Washington State: Phase 1 Task 6 Appendices02-09-050ANovember 2002
Finding water to restore streams: Introducing Washington's Water Acquisition Program02-11-007November 2002
Quality Assurance Project Plan: Screening Investigation of Water and Sediment Quality in Creeks from Ten Washington Mining Districts02-03-081October 2002
Quality Assurance Project Plan: Verification of 1998 303(d) Listing for PCBs in Budd Inlet (Inner)02-03-085October 2002
Quality Assurance Project Plan: Screening Survey of Mercury Levels in Edible Fish Tissue from Selected Lakes and Rivers of Washington State02-03-080October 2002
Health Advisory for Spokane River Fish Consumption02-09-076October 2002
Un Aviso de Salud sobre La Consumición de Pescado Del Río Spokane (inglés: Spokane River)02-09-076ESOctober 2002
Health Advisory for Spokane River Fish Consumption (Russian)02-09-076ruOctober 2002
River and Stream Ambient Monitoring Report for Water Year 200102-03-047October 2002
Pesticide Monitoring in the Mission Creek Basin, Chelan County02-03-022October 2002
Results and Recommendations from Monitoring Arsenic Levels in 303(d) Listed Rivers in Washington02-03-045October 2002
Quality Assurance Project Plan: Woodland Creek Temperature TMDL02-03-077September 2002
Quality Assurance Project Plan: Mercury in Sediments from Lake Whatcom and Surrounding Lakes: Determination of Spatial and Temporal Patterns and Characterization of Tributary Inputs02-03-079September 2002
Development of Freshwater Sediment Quality Values for use in Washington State: Phase I Task 602-09-050September 2002
Total Maximum Daily Load for Lower Columbia River Total Dissolved Gas02-03-004September 2002
Reconnaissance Survey of Dioxins and Furans in Dillenbaugh Creek and the Chehalis River near the American Crossarm Site02-03-043September 2002
Stormwater Management MANUAL for Eastern Washington -- DRAFT -- Chapters 1 through 402-10-040ASeptember 2002
Stormwater Management MANUAL for Eastern Washington -- DRAFT -- Chapter 4 Maps02-10-040AmapsSeptember 2002
Stormwater Management MANUAL for Eastern Washington -- DRAFT -- Chapters 5 and 602-10-040BSeptember 2002
Stormwater Management MANUAL for Eastern Washington -- DRAFT -- Chapters 7 and 802-10-040CSeptember 2002
MODEL Municipal Stormwater Management Program for Eastern Washington -- DRAFT -- Chapters 1 through 902-10-041September 2002
MODEL Municipal Stormwater Management Program for Eastern Washington -- DRAFT -- Appendices 9A and 9B02-10-041-9abSeptember 2002
Public Notice: Workshops/Hearings to Focus on the Use of Diquat Dibromide for Aquatic Pest Control02-10-050September 2002
Focus: Ecology Proposes to Approve the Aquatic Herbicide Diquat Dibromide for Use in Washington State02-10-051September 2002
Water Quality Assessment of the Nooksack River between Brennan and North Cedarville02-03-037September 2002
Quality Assurance Project Plan: Investigation of Background Concentrations of Organic and Inorganic Arsenic in Freshwater Fish Tissue in Four Washington Lakes02-03-075September 2002
Water Cleanup Plans: Total Maximum Daily Loads (TMDLs)02-10-038September 2002
Results of Sampling to Verify 303(d) Metals Listings for Selected Washington State Rivers and Creeks02-03-039September 2002
The Estuary Guide - Level 102-06-006aSeptember 2002
Quality Assurance Project Plan: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study02-03-076August 2002
Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load -- Submittal Report02-10-047August 2002
A Summary of Water Quality Data Collected in the Wilson/Cherry Sub-basin, April - October 199902-03-038August 2002
Quality Assurance Project Plan: TMDL Technical Assessment of DDT and PCBs in the Okanogan River02-03-070August 2002
Little Klickitat River Watershed Temperature Total Maximum Daily Load02-03-031August 2002
Surface Water-Ground Water Interactions Along the Dungeness River and Vertical Hydraulic Conductivity of Streambed Sediments, Clallam County, Washington, September 1999-July 200102-03-027August 2002
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load, Year 1 Technical Study02-03-069July 2002
Addendum to Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load Year 1 Technical Study02-03-069ADDJuly 2002
Colville River Fecal Coliform Total Maximum Daily Load Study02-03-036July 2002
Data Summary: Upper Yakima River Basin Suspended Sediment and Organochlorine Pesticide TMDL Evaluation02-03-032July 2002
Quality Assurance Project Plan: Norfolk CSO Sediment Cap Recontamination Phase 1 Inspection02-03-073July 2002
Quality Assurance Project Plan: Lake Whatcom TMDL Study02-03-074July 2002
Quality Assurance Project Plan: TMDL Technical Study: Chlorinated Pesticides and PCBs in the Walla Walla River02-03-068July 2002
Inhibition of Erythrocyte d-Aminolevulinic Acid Dehydratase (ALAD) Activity in Fish from Waters Affected by Lead Smelters. Article in Environmental Monitoring and Assessment 77:99-119, 2002.02-03-035July 2002
Water Cleanup Plans: Taking the temperature of the Walla Walla watershed02-10-035July 2002
Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring02-03-067July 2002
Quality Assurance Project Plan: Pesticide Monitoring in the Mission Creek Basin02-03-071July 2002
Update on Best Available Science for Freshwater Wetlands02-06-014July 2002
Quality Assurance Project Plan: Walla Walla River Tributaries Temperature Total Maximum Daily Load02-03-066June 2002
Moses Lake Inflow-Outflow Balance: A Component of the Moses Lake Total Phosphorus Total Maximum Daily Load02-03-029June 2002
North Creek Fecal Coliform Total Maximum Daily Load Submittal Report02-10-020June 2002
Union River Fecal Coliform Total Maximum Daily Load Submittal Report02-10-022June 2002
Wind River Watershed Temperature Total Maximum Daily Load Submittal Report02-10-029June 2002
Surface Water Quality Standards -- Proposed Changes02-10-033June 2002
Washington State Water Quality Assessment: Year 2002 Section 305(b) Report02-03-026June 2002
Second Screening Investigation of Water and Sediment Quality of Creeks in Ten Washington Mining Districts, with Emphasis on Metals02-03-024June 2002
Journal article: Determining trophic state in Lake Whatcom, Washington (USA), a soft water lake exhibiting seasonal nitrogen limitation. Hydrobiologia 468:107-121, 200202-03-028June 2002
Focus Sheet: Dissolved Oxygen in the Spokane River and Long Lake02-10-002June 2002
Spill Scene Summer 200202-08-006June 2002
Water Cleanup Plan for Bacteria in the Lower Dungeness Watershed -- Total Maximum Daily Load (TMDL) Submittal Report02-10-015June 2002
Aquatic Plants Technical Assistance Program 2001 Activity Report02-03-025June 2002
Water Cleanup Plans: Taking the temperature of the Wenatchee watershed02-10-028June 2002
Chehalis River Watershed Surficial Aquifer Characterization - Maps98-335mapsMay 2002
Dungeness River and Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study02-03-014May 2002
Water Cleanup Plans: Waterbodies Proposed for Cleanup Plans02-10-027May 2002
Notice: Public comment sought on 303(d) listing policy02-10-025May 2002
1998 303(d) PCB Listing for Chambers Creek Mussels: New Data02-03-013April 2002
Quality Assurance Project Plan: Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent the B&L Landfill, Milton, Washington02-03-086April 2002
Chehalis Best Management Practices Evaluation Project, Final Report for Water Quality Sites02-03-015April 2002
Focus Sheet: Union River Needs Your Help!02-10-021April 2002
Focus Sheet: North Creek Needs Your Help02-10-019April 2002
Focus Sheet: Cleanup Plan - Wenatchee Watershed Cleanup Plan (TMDL)02-10-023April 2002
Plan de Limpieza: Plan de Limpieza para la Cuenca de Wenatchee (Wenatchee TMDL)02-10-024April 2002
Upper Yakima River Basin Suspended Sediment and Organochlorine Pesticide Total Maximum Daily Load Evaluation02-03-012April 2002
Public comments invited on draft plan to clean up lower Dungeness watershed02-10-016April 2002
McAllister Creek Water Quality Survey for Fecal Coliform Bacteria, Total Suspended Solids, Turbidity, and Nutrients02-10-017April 2002
Spokane Area Point Source PCB Survey, May 200102-03-009March 2002
Wind River Watershed Temperature Total Maximum Daily Load02-03-010March 2002
Focus Sheet: Water Quality in the Colville River Watershed02-10-013March 2002
Quality Assurance Project Plan: Comparison of Toxicity in Lake Union Sediments Using Molecular DNA Techniques and Conventional Bioassay Measures02-03-089March 2002
The Lower Nooksack River: Metals in Sediments Upstream and Downstream of the Ferndale Wastewater Treatment Plant02-03-006March 2002
Factors Affecting Waters with a High pH: Statewide Analysis02-03-005February 2002
VEAT 2001 - Vessel Entries and Transits for Washington Waters02-08-003February 2002
Washington State Wetland Mitigation Evaluation Study - Phase 2, Evaluating Success02-06-009February 2002
Quality Assurance Project Plan: Analysis of Fish from Long Lake, Washington, for PCBs and Selected Metals02-03-088February 2002
Appendix F: Project Summaries for the Washington State Wetland Mitigation Evaluation Study - Phase 2: Evaluating Success02-06-010February 2002
2001 Washington State Water Quality Assessment Section 305(b) Report Update01-10-015January 2002
Nooksack River Watershed Bacteria Total Maximum Daily Load -- Detailed Implementation Plan01-10-060January 2002
Guide to Watershed Planning and Management - Addendum #102-06-005January 2002
Focus Sheet: Nutrients in Our Lakes and Streams02-10-004January 2002
Focus Sheet: Dissolved Oxygen and the Water Quality Standards02-10-001January 2002
Washington Water Acquisition Program: Finding Water to Restore Streams02-11-0162002
Assessment of Surface Water and Groundwater Interchange within the Muck Creek Watershed, Pierce County01-03-037December 2001
Salmon Recovery Index Watershed Monitoring Program: Water Quality Index Report, October 2000 - September 200101-03-046December 2001
Quality Assurance Project Plan: Stillaguamish River Temperature Total Maximum Daily Load01-03-066December 2001
Addendum to Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks: Addendum, Arsenic Sampling of Selected Washington Rivers01-03-070December 2001
Padden Creek Pesticide Monitoring Program, 2001 Progress Report01-03-045December 2001
Relationship Between the Upper Dungeness River and the Bedrock Aquifer, Clallam County01-03-027December 2001
Reassessment of Toxicity of Lake Roosevelt Sediments01-03-043December 2001
Flow Investigation of the Nisqually River Lower Reach, Thurston County, Washington01-11-015December 2001
River and Stream Ambient Monitoring Report for Water Year 200001-03-042December 2001
Chehalis Best Management Practices Evaluation Project, 1995-2000 Temperature Monitoring Data01-03-041December 2001
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load -- Submittal Report01-10-062November 2001
Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study Streamflow Summary01-03-039November 2001
Teanaway Temperature Total Maximum Daily Load Submittal Report01-10-019November 2001
Union River Fecal Coliform Total Maximum Daily Load Study01-03-038November 2001
Stream Sampling Protocols for the Environmental Monitoring and Trends Section01-03-036November 2001
Focus Sheet: Burning In and Around Moses Lake (OBSOLETE)01-02-012November 2001
Quality Assurance Project Plan: Groundwater/Surface Water Interactions In the Sammamish River: a Preliminary Analysis.01-03-068October 2001
Granger Drain Fecal Coliform Bacteria Total Maximum Daily Load Assessment and Evaluation -- FINAL01-10-012October 2001
Condition of Freshwaters in Washington State for the Year 200001-03-025October 2001
Condition of Freshwaters in Washington State: Technical Appendix01-03-026October 2001
Zinc, Copper, and Lead Concentrations in Quilceda and Allen Creeks: Results of Cooperative Monitoring by Snohomish County and the Washington State Department of Ecology01-03-031October 2001
Focus Sheet: Best Available Science for Wetlands01-06-023October 2001
Analysis and Occurrence of Polybrominated Diphenyl Ethers in Washington State Freshwater Fish. Article in Archives of Environmental Contamination and Toxicology 41, 339-344 (2001)01-03-033September 2001
Upper Humptulips River Temperature Total Maximum Daily Load -- Technical Report01-10-056September 2001
2001 Stormwater Management Manual for Western Washington: Volume I -- Minimum Technical Requirements and Site Planning99-11September 2001
2001 Stormwater Management Manual for Western Washington: Volume II -- Construction Stormwater Pollution Prevention99-12September 2001
2001 Stormwater Management Manual for Western Washington: Volume III -- Hydrologic Analysis and Flow Control Design/BMPs99-13September 2001
2001 Stormwater Management Manual for Western Washington: Volume IV -- Source Control BMPs99-14September 2001
2001 Stormwater Management Manual for Western Washington: Volume V -- Runoff Treatment BMPs99-15September 2001
Aquatic Plants Technical Assistance Program 2000 Activity Report01-03-034September 2001
Periodic Dam Safety Inspection Report: Serenity Lake Dam01-11-014September 2001
Investigation into Recurring Toxicity of the Chinet Company Columbia River Intake01-03-030September 2001
Benthic Macroinvertebrate Biological Monitoring Protocols for Rivers and Streams: 2001 Revision01-03-028September 2001
Inner Bellingham Bay Contaminated Sediments Total Maximum Daily Load -- Submittal Report99-58September 2001
Inner Bellingham Bay Contaminated Sediments TMDL Submittal Report01-10-036September 2001
Water Quality Program Responsiveness Summary -- Fiscal Year 2001 TMDL Priority List01-10-053August 2001
Water Cleanup Plan: Priority Water Cleanup Plans for Fiscal Year 200201-10-052August 2001
Water Cleanup Plans : Taking the temperature of Yakima River waterways01-10-045August 2001
Quality Assurance Project Plan: Willapa River Temperature Total Maximum Daily Load01-03-063August 2001
At Home with Wetlands - A Landowners Guide90-31August 2001
Water Quality Assessments of Selected Lakes within Washington State: 199901-03-009July 2001
Chemical Analysis and Toxicity Testing of Spokane River Sediments Collected in October 200001-03-019July 2001
Water Quality Financial Assistance Program -- Funding Overview & Quick Reference01-10-043July 2001
Spokane River/Aquifer Interaction Project Results, May - November 199901-03-024July 2001
Upper Chehalis River Basin Temperature Total Maximum Daily Load99-52July 2001
Periodic Dam Safety Inspection Report: Leader Lake Dams01-11-008July 2001
Periodic Dam Safety Inspection Report: Beitey Lake Dam01-11-009July 2001
Aquatic Plant Sampling Protocols01-03-017June 2001
Upper Humptulips River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan) Submittal Report01-10-022June 2001
Water Cleanup Plans: Skagit River Watershed01-10-035June 2001
An Aquatic Plant Identification Manual for Washington's Freshwater Plants01-10-032June 2001
Skokomish River Basin Fecal Coliform Total Maximum Daily Load (Water Cleanup Plan) -- Submittal Report01-10-017June 2001
VEAT 2000 - Vessel Entries and Transits for Washington Waters01-08-004June 2001
Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks01-03-071June 2001
Snohomish River Tributaries Fecal Coliform Total Maximum Daily Load Submittal Report00-10-087June 2001
Water Cleanup Plans: Stillaguamish River Watershed01-10-034June 2001
Water Cleanup Plans: Inner Bellingham Bay Contaminated Sediment TMDL Review Draft01-10-037June 2001
North Creek Watershed: Total Maximum Daily Load Evaluation for Fecal Coliform Bacteria01-03-020June 2001
Focus Sheet: Upper White River at Risk: First Steps Toward Restoration01-10-038June 2001
Water Cleanup Plan: Taking the temperature of Washington′s waterways01-10-041June 2001
Re-Evaluation of Copper Impact from Wilkeson Wastewater Treatment Plant on Wilkeson Creek.01-03-021May 2001
Water Cleanup Plans -- Total Maximum Daily Loads (TMDLs)01-2033May 2001
Update: Watershed Planning in Eastern Washington01-06-018May 2001
Final Statewide 303(d) Workload Assessment01-03-018May 2001
Quality Assurance Project Plan: Reassessment of Toxicity of Lake Roosevelt Sediments01-03-073May 2001
Focus Sheet: Waterbodies Proposed for Cleanup Plans01-10-023May 2001
An Ecological Hazard Assessment for PCBs in the Spokane River01-03-015April 2001
Quality Assurance Project Plan: Stillaguamish River Basin and Port Susan Total Maximum Daily Load Evaluation Update01-03-065April 2001
Quality Assurance Project Plan: Moses Lake Phosphorus TMDL Study01-03-075April 2001
Spokane River PCB and Source Survey, August 200001-03-016April 2001
Skokomish River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study01-03-014April 2001
Mercury Concentrations in Edible Muscle of Lake Whatcom Fish01-03-012April 2001
River and Stream Ambient Monitoring Report for Water Year 199901-03-013April 2001
Quality Assurance Project Plan: Padden Creek Pesticide Monitoring Project01-03-076March 2001
Flow Summary at Three Seasonal Gaging Stations on the Little Klickitat River01-03-006March 2001
Focus Sheet: Riparian Areas00-10-023March 2001
Final Supplemental Environmental Impact Statement For Freshwater Aquatic Plant Management00-10-040February 2001
Final Supplemental Environmental Impact Statement for Aquatic Plant Management -- Appendix A -- Ecology′s Water Quality Modification Process, Sample Application Form and Permit00-10-041February 2001
Final Supplemental Environmental Impact Statement for Aquatic Plant Management -- Appendix B -- State Water Pollution Control Laws and Washington′s Administrative Codes Governing the Use of Aquatic Pesticides00-10-042February 2001
Herbicide Risk Assessment for the Aquatic Plant Management Final Supplemental Environmental Impact Statement -- Appendix C -- Volume 3: 2,4-D00-10-043February 2001
Herbicide Risk Assessment for the Aquatic Plant Management Final Supplemental Environmental Impact Statement -- Appendix D -- Volume 2: Endothall00-10-044February 2001
Risk Assessments for the Aquatic Plant Management Final Supplemental Environmental Impact Statement -- Appendix E00-10-045February 2001
Water Cleanup Plans: Granger Drain Fecal Coliform TMDL01-10-004February 2001
Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation01-03-064January 2001
Focus Sheet: New Water Quality Standards Implementation01-10-006January 2001
Salmon Creek Watershed Bacteria and Turbidity Total Maximum Daily Load -- Submittal Report01-10-007January 2001
USBR Columbia River Pump Exchange Project: Potential Water Quality Impacts on the Lower Yakima River01-03-000January 2001
The Use of Sediment Cores to Track Persistent Pollutants in Washington State: A Review01-03-001January 2001
Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 200001-03-002January 2001
Prevention Bulletin 01-01: The Super Rubin01-08-002January 2001
Newcastle Coal Creek Landfill01-09-041January 2001
Watershed Assessments and Water Rights Decision-Making00-06-002January 2001
Update: Watershed Planning in Eastern Washington00-06-0012001
Quality Assurance Project Plan: Colville River Fecal Coliform TMDL Study.00-03-082December 2000
Quality Assurance Project Plan: Second Screening Investigation of Water and Sediment Quality in Creeks in Washington Mining Districts00-03-083December 2000
Quality Assurance Project Plan: Toxicity Testing Spokane River Sediments00-03-085December 2000
Quality Assurance Project Plan: Ambient Groundwater Monitoring in the Dungeness Watershed, Clallam County, Washington00-03-086December 2000
Quality Assurance Project Plan: Levels and Sources of Arsenic in the Similkameen River00-03-087December 2000
Quality Assurance Project Plan: Spokane River PCB Source Survey00-03-089December 2000
Quality Assurance Project Plan: Little Klickitat River Temperature Total Maximum Daily Load00-03-090December 2000
Quality Assurance Project Plan: Re-evaluation of Copper Impact from Wilkeson WWTP on Wilkeson Creek00-03-091December 2000
Quality Assurance Project Plan: Metals Monitoring in Quilceda and Allen Creeks, Snohomish County00-03-092December 2000
Quality Assurance Project Plan: Lower Yakima River Water Quality Model and Evaluation of the USBR Columbia River Pump Exchange Project00-03-095December 2000
Quality Assurance Project Plan: Characterizing Surface Water/Groundwater Interactions in the Muck Creek Watershed Pierce County, Washington00-03-097December 2000
Quality Assurance Project Plan: Program for Monitoring Salmon Recovery in Index Watersheds: Water Quality and Quantity00-03-098December 2000
Sediment Quality in Puget Sound: Year 2, Central Puget Sound00-03-055December 2000
Summary of Streamflow Conditions, September 2000: Fisher Creek and Carpenter Creek Basin00-03-049December 2000
Concentrations of Chemical Contaminants and Bioassay Response to Sediments in Salmon Bay, Seattle: Results of Phase III Sampling00-03-053December 2000
Water Reclamation and Reuse -- The Demonstration Projects00-10-062December 2000
Water Cleanup Plans: Ecology seeks comments on plan to clean up bacteria in Snohomish River tributaries00-10-092December 2000
Water Quality Assessments of Selected Lakes within Washington State: 199800-03-039December 2000
Methods for Assessing Wetland Functions, Vol. 2 - Depressional Wetlands in the Columbia Basin of Eastern Washington, Part 100-06-047December 2000
Methods for Assessing Wetland Functions, Vol. 2 - Depressional Wetlands in the Columbia Basin of Eastern Washington, Part 200-06-048December 2000
Lake Washington School District Plant & Facilities #9400-09-010November 2000
Germany Creek Photo Points and Channel Stability Evaluation: 1990 - 200000-10-038November 2000
Moses Lake Proposed Phosphorus Criterion and Preliminary Load Allocations Based on Historical Review00-03-036October 2000
Data Summary: Lower Nooksack River Basin Bacteria Total Maximum Daily Load00-03-038September 2000
Results from Analyzing PCBs in 1999 Spokane River Fish and Crayfish Samples00-03-040September 2000
River and Stream Ambient Monitoring Report for Water Year 199800-03-035September 2000
Saltwater Intrusion in Salmon Bay and Lake Union Sediments00-03-032August 2000
Flow Summary of Ten Streams and Irrigation Ditches in the Upper Yakima River Basin00-03-028August 2000
Update Summer 2000 - Wetland Function Assessment Project00-06-027August 2000
Focus Sheet: Lower Skokomish River water quality study99-2002August 2000
Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment00-03-081August 2000
Washington's Environmental Health 200000-01-003August 2000
Focus Sheet: Priority Water Cleanup Plans for Fiscal Year 200100-10-052August 2000
Meeting Notice: Aquatic Weed Management Fund Grant Workshops00-10-053August 2000
Responsiveness Summary: Fiscal Year 2000 TMDL Priority List00-10-055August 2000
2000 Washington State Water Quality Assessment -- Section 305(b) Report00-10-058August 2000
Review of Sediment Quality Data for the Similkameen River00-03-027July 2000
Focus Sheet: Grays Harbor Watershed cleanup planning00-10-050July 2000
Beach Monitoring in the Columbia River Littoral Cell, 1997-200000-06-26July 2000
Simpson Northwest Timberlands Temperature Total Maximum Daily Load -- Submittal Report00-10-047July 2000
Grays Harbor Fecal Coliform Total Maximum Daily Load Study00-03-020June 2000
Concentrations of 303(d) Listed Metals in the Upper Yakima River00-03-024June 2000
Verifying 303(d) DDT/DDE and Dieldrin Listings for the Upper Yakima River00-03-023June 2000
Focus Sheet: Lake Management Using Herbicides with IPM: Public Review and Open House Forums Planned00-10-034June 2000
Reconnaissance Survey on Metals, Semivolatiles, and PCBs in Sediment Deposits Behind Upriver Dam, Spokane River00-03-021June 2000
Data Appendix: Reconnaissance Survey on Metals, Semivolatiles, and PCBs in Sediment Deposits Behind Upriver Dam, Spokane River00-03-026June 2000
Washington State Wetland Mitigation Evaluation Study, Phase I: Compliance00-06-016June 2000
Focus Sheet: Longview Ditches water cleanup planning update00-10-032June 2000
Lower Skagit River Fecal Coliform Total Maximum Daily Load Submittal Report -- Water Cleanup Plan00-10-010June 2000
SEA-TAC RUNWAY FILL --Hydrologic Studies -- Project Completion Fact Sheet00-10-027June 2000
Johnson Creek Watershed, Total Maximum Daily Load -- Submittal Report00-10-033June 2000
Nooksack River Watershed Bacteria -- Total Maximum Daily Load Submittal Report00-10-036June 2000
Gibbons Creek Watershed -- Fecal Coliform Total Maximum Daily Load Submittal Report00-10-039June 2000
Aquatic Plants Technical Assistance Program 1999 Activity Report00-03-018May 2000
Focus Sheet: Lower Nooksack River -- Cleaning up water pollution00-10-022May 2000
Watershed Assessments, Plans, and Water Right Decisions00-06-003May 2000
Lower Skagit River Dissolved Oxygen Total Maximum Daily Load Submittal Report00-10-031May 2000
Teanaway River Basin Temperature Pilot Technical Assessment00-03-015April 2000
Focus Sheet: Water Quality in Snohomish County - Cleaning up bacteria in Snohomish River tributaries00-10-020April 2000
Periodic Dam Safety Inspection Report: Trout Creek Dam00-11-008April 2000
McDonald Creek Stream Channel Assessment00-03-011March 2000
Water and Sediment Quality in the Vicinity of Cleveland Mine, Hunters Creek Drainage, Stevens County00-03-013March 2000
Identification of Cleveland Mine Tailing Pile Particulate Matter in Hunters Creek Drainage, Stevens County. Article in the journal, Microscope, Vol 93-105, June 2000.00-03-056March 2000
Revised -- Upper Chehalis River Basin Dissolved Oxygen Total Maximum Daily Load Submittal Report00-10-018March 2000
Water Quality Assessments of Selected Lakes within Washington State: 199700-03-009March 2000
Gibbons Creek water cleanup planning update00-10-012March 2000
Focus Sheet: Salmon Creek water cleanup planning update00-10-013March 2000
Focus Sheet: Water cleanup planning in the Dungeness watershed00-10-016March 2000
Results from Analyzing Metals in 1999 Spokane River Fish and Crayfish Samples00-03-017February 2000
Prevention Bulletin 96-01: The Keystone Canyon00-08-009February 2000
Focus Sheet: Water Quality in Washington State -- Lower Skagit River Bacteria Water Cleanup Plans00-10-009February 2000
Focus Sheet: Johnson Creek Watershed -- Cleaning up water pollution00-10-006February 2000
Focus Sheet: Teanaway Temperature TMDL -- A plan to improve stream temperatures00-10-008February 2000
Quality Assurance Project Plan: Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study00-03-080February 2000
Washington State Pesticide Monitoring Program: 1997 Surface Water Sampling Report00-03-003January 2000
Screening Level Investigation of Water and Sediment Quality of Creeks in Ten Eastern Washington Mining Districts, with Emphasis on Metals00-03-004January 2000
Willapa River Total Maximum Daily Load Data Summary Report00-03-005January 2000
Lower Nooksack River Basin Bacteria Total Maximum Daily Load Evaluation00-03-006January 2000
Focus Sheet: Island/Snohomish Water Cleanup Plan Priorities for Fiscal Year 200000-10-004January 2000
Shoptalk, Winter 2000, Volume 10 #1: Canyon Creek Cabinet Company wins the Governor's Award00-04-045January 2000
Review Draft: Assimilative Capacity Study for Nutrient Loading in the Lower White River00-03-001December 1999
Annual Report for Implementing the Watershed Planning Act99-123December 1999
Estimates of Nitrate-N Loading to South Puget Sound by Groundwater Discharge99-348November 1999
Groundwater Data Compilation for the Okanogan Watershed99-342October 1999
Estimated Baseflow Characteristics of Selected Washington Rivers and Streams: Water Supply Bulletin No. 6099-327October 1999
Estimated Baseflow Characteristics of Selected Washington Rivers and Streams - data and GIS project files99-327dataOctober 1999
Water Quality Data Compilation and TMDL Ranking for the San Juan Islands99-339October 1999
Briefing Paper for the Okanogan Watershed, WRIAs 48, 49, 5099-340October 1999
Simpson Northwest Timberlands Temperature Total Maximum Daily Load Submittal99-56October 1999
Lilliwaup Bay Bacterial Source Identification Monitoring99-329September 1999
PCB Concentrations in Fish from Ward Lake (Thurston County) and the Lower Elwha River99-338September 1999
Lake Whatcom Watershed Cooperative Drinking Water Protection Project: Results of 1998 Water, Sediment and Fish Tissue Sampling99-337September 1999
Applying the Public Benefit Rating System as a Watershed Action Tool99-108September 1999
Focus Sheet: Priority Water Cleanup Plans for Fiscal Year 199999-2035September 1999
Metals Concentrations in Spokane River Sediments Collected with USGS in 199899-330August 1999
River and Stream Ambient Monitoring Report for Water Year 199799-332August 1999
Methods for Assessing Wetland Functions, Volume 1, Part 1 - Riverine and Depressional Wetlands in the Lowlands of Western Washington99-115August 1999
Methods for Assessing Wetland Functions, Volume 1, Part 2 - Riverine and Depressional Wetlands in the Lowlands of Western Washington - Procedures for Collecting Data99-116August 1999
Invasive, Exotic, Aquatic Plants99-05August 1999
Water Quality Program Responsiveness Summary -- Fiscal Year 1999 TMDL Priority List99-24August 1999
Snohomish River Estuary -- Total Maximum Daily Load Submittal Report99-57August 1999
Lake Chelan TMDL -- a plan for keeping it clean98-2017July 1999
Moses Lake Dunes Wastewater Treatment Plant, Class II Groundwater Inspection99-325June 1999
Aquatic Plants Technical Assistance Program 1998 Activity Report99-328June 1999
TFW Monitoring Program Method Manual for the Stream Temperature Survey99-e01June 1999
East Fork Lewis River Fish Habitat Analysis Using the Instream Flow Incremental Methodology and Toe-Width Method for WRIA 2799-151June 1999
Kalama River Fish Habitat Analysis Using the Instream Flow Incremental Methodology99-152June 1999
Washougal River Fish Habitat Analysis Using the Instream Flow Incremental Methodology and the Toe-Width Method for WRIAs 25, 26, 28, and 2999-153June 1999
Effectiveness of Forest Road and Timber Harvest Best Management Practices with Respect to Sediment-Related Water Quality Impacts99-317May 1999
Spokane River Dissolved Metals Total Maximum Daily Load -- Submittal Report99-49May 1999
Hamilton/Labree Road PCE Site Ground Water Monitoring October 1997 - July 199899-322April 1999
Dredging Simulation Test on Similkameen River Sediments99-318April 1999
Moses Lake (Dunes) Wastewater Treatment Plant Class II Wastewater Inspection April 27-29, 199899-320April 1999
Pesticides Detected in Urban Streams During Rainstorms and Relations to Retail Sales of Pesticides in King County, Washington99-324April 1999
Focus Sheet: Lower Skokomish River water quality study99-20-22April 1999
VEAT 1998 - Vessel Entries and Transits for Washington Waters99-251March 1999
The Relationship Between Stream Macroinvertebrates and Salmon in the Quilceda/Allen Drainage99-311March 1999
Sun Lakes Trophic Status Assessment Study99-315March 1999
Totten and Eld Inlets Clean Water Projects - 1997 Annual Report99-316March 1999
Big Quilcene River Fish Habitat Analysis Using the Instream Flow Incremental MethodologyOFTR 99-05March 1999
Visibility Monitoring Data Analysis for the Columbia River Gorge National Scenic Area (9/1/96-8/31/97)99-202February 1999
McDonald Creek Benthic Macroinvertebrate Study: A Cumulative Impact Assessment after Timber Harvesting in a Small Watershed99-304February 1999
Lower Budd Inlet Sediment Characterization Study/ Midwest Site Evaluation & Chemical Screening of Selected Point Sources99-305February 1999
Draft Guide to Watershed Planning & Management99-106January 1999
Pacific Northwest Salmon Habitat Indicators - Pilot Project Snohomish River Basin99-3011999
Biological Assessment of Small Streams in the Coast Range Ecoregion & the Yakima River Basin99-3021999
Chehalis River Watershed Surficial Aquifer Characterization98-335December 1998
DDT in Osoyoos Lake Fish98-337December 1998
Washington State Marine Water Quality in 1996 and 199798-338December 1998
Toxics Control Accounts Appropriation Recommendations for the 1999-2001 Biennium98-703December 1998
Lower Yakima River Cleanup Plan - a plan targeting sediment and pesticides98-2026WQDecember 1998
Cleaning up the Willapa River98-2031December 1998
Stream Biological Assessments (Benthic Macroinvertebrates) for Watershed Analysis/Mid-Sol Duc Water98-334November 1998
Basic American Foods Class II Groundwater Inspection98-330October 1998
Quincy NPDES Permit TMDL for Wasteway DW237 and W64598-10-201September 1998
Rocky Ford Creek TMDL Study98-326September 1998
Marine Sediment Monitoring Program II - Distribution and Structure of Benthic Communities in Puget Sound - 1989-199398-328September 1998
Cadmium, Lead, and Zinc in the Spokane River Recommendations for TMDL and Waste Load Allocations98-329September 1998
Planning As Process: A Community Guide to Watershed Planning99-01September 1998
Mill Creek and Cameron Creek Benthic Macroinvertebrate Survey98-324August 1998
White River Spring Chinook Habitat Guidance -- A Water Quality Management Approach for the Upper White River98-10July 1998
Diquat Concentrations in the Steilacoom Lake Outlet (Chambers Creek)98-322July 1998
Total Maximum Daily Loads (TMDL) Workload Model -- Program Definition and Cost98-026July 1998
Lake Chelan TMDL- A Plan for Keeping it Clean98-2017-WQJuly 1998
Chehalis Best Management Practices Evaluation Project, 1997-98 Annual Report98-316June 1998
River and Stream Ambient Monitoring Report for Wateryear 199698-317June 1998
Appendices for the report, Assessment of Metals Contamination in Sediments of Gibbons Creek Remnant Channel98-315appMay 1998
Rainbow Trout Abnormalities in Douglas Creek: Results from Chemical Analyses. Memo to Terry Jackson, WDFW, May 27, 1998.98-e02May 1998
Dissolved Oxygen in Lake Whatcom/Trend in the Depletion of Hypolimnetic Oxygen in Basin I 83-9798-313May 1998
Assessment of Metals Contamination in Sediments of Gibbons Creek Remnant Channel98-315May 1998
Aquatic Plants Technical Assistance Program 1997 Activity Report98-311April 1998
Water Resource Program For The John Day-McNary Pools Reach Of The Columbia River, WRIA 31 And Parts Of WRIA′s 32, 33, 36, And 37wac173-531AMarch 1998
Instream Resources Protection Program For The Mainstem Columbia River In Washington Statewac173-563March 1998
Upper White River Spring Chinook Habitat Assessment Study98-304March 1998
Washington State Pesticide Monitoring Program: 1996 Surface Water Sampling Report98-305March 1998
Chehalis Best Management Practices Evaluation Project, 1996-97 Beaver/Allen Creek WQ Data Report98-309March 1998
Washington State Pesticide Monitoring Program: 1995 Surface Water Sampling Report98-3001998
Garrison Creek Use-Based Receiving Water Study98-3021998
Chehalis Best Management Practices Evaluation Project, 1996/97 Water Quality Data Report for Bunker Creek98-3331998
Evaluation of R-Emap Techniques for the Measurement of Ecological Integrity of Streams in Washington State's Coast Range Ecoregion. Article in Environmental Monitoring and Assessment 51:345-355, 1998.98-e041998
Draft Calibrated Methods to Assess Riverine & Depressional Wetlands in the Lowlands of Western W98-1061998
An Approach to Developing Methods to Assess the Performance of Washington Wetlands98-1081998
Wetlands Function Assessment Project Update No. 498-1091998
Wetland Mitigation Banking Rule Development Underway98-1201998
Lake Sawyer Water Cleanup Plan (TMDL) for Phosphorus98-2022-WQ1998
South Fork Palouse Water Cleanup Plan (TMDL) for ammonia98-2023-WQ1998
Focus Sheet: Cleaning up the Willapa River98-2031-WQ1998
Water Cleanup Plans98-2033-WQ1998
Watershed Assessment Water Resource Inventory Area 28, Salmon-Washougal98-0021998
Survey of Metals Concentrations in the Similkameen River. Memo to Jim Milton, Central Regional Office, December 31, 1997.97-e10December 1997
Identification of Holden Mine Tailing Pile Particulate Matter in Railroad Creek. Article in journal, Microscope, Vol 45:4 155-161 (1997).97-e13December 1997
DDT Sources to the Okanogan River and Lake Osoyoos. Memo to Jim Milton, Central Regional Office.97-e09December 1997
Polychlorinated Dibenzo-P-Dioxins and Dibenzofurans in Upper Columbia River Suspended Particulate Matter, 1990-199497-342December 1997
Department of Ecology Overview - 1997-9997-752December 1997
Watershed Briefing Paper for the Cedar/Green Water Quality Management Area97-335October 1997
Watershed Briefing Paper for the Eastern Olympic Watershed Water Quality Management Area97-336October 1997
The Economic Value of Wetlands: Wetlands' Role in Flood Protection in Western Washington97-100October 1997
Using Invertebrates to Assess the Quality of Washington Streams and to Describe Biological Expectations97-332September 1997
Water Quality Assessment of Tributaries to the Snohomish River and Nonpoint Source Pollution TMDL97-334September 1997
Metal Concentrations in the Spokane River During Spring 1997. Memo to J. Manning and C. Nuechterlein, August 26, 1997.97-e02August 1997
Water Quality in the Wapato Basin of Lake Chelan, Summer 199697-323August 1997
Washington Lakes: A Department of Ecology Update97-324August 1997
City of Walla Walla Wastewater Treatment Plant Class II Inspection97-326August 1997
Polychlorinated Dibenzo-P-Dioxins and Dibenzofurans in Snake River Suspended Particulate Matter97-328August 1997
Campbell Lake Total Phosphorus Total Maximum Daily Load97-10-201July 1997
Eric Lake Total Phosphorus Total Maximum Daily Load97-10-202July 1997
A Suspended Sediment and DDT Total Maximum Daily Load Evaluation Report for the Yakima River97-321July 1997
Creation and Analysis of Freshwater Sediment Quality Values in Washington State97-323aJuly 1997
Lower Skagit River Total Maximum Daily Load Water Quality Study97-326aJuly 1997
Effects of Holden Mine on the Water, Sediments, and Benthic Invertebrates at Railroad Creek (Lake Chelan)97-330July 1997
Snohomish River Estuary Dry Season TMDL Study Phase II97-325June 1997
Focus Sheet: Columbia River Water Allocation Reviewed97-1802-SH&WRJune 1997
Watershed Approach to Water Quality Management: Needs Assessment for the Mid-Columbia Watershedwq-97-06June 1997
Aquatic Plants Technical Assistance Program 1996 Activity Report97-319May 1997
Clark County Salmon Creek Wastewater Treatment Plant Class II Inspection97-320May 1997
Wetland Management by Local Governments: Case studies that illustrate the wetland planning process97-096May 1997
Potential Effects of Sea Level Rise on Washington State Wetlands97-098May 1997
Puyallup Basin Treatment Plant Metals Survey97-303April 1997
Washington State Marine Water Quality in 1994 and 199597-316April 1997
Protocol for Determining the Mean Epilimnetic Total Phosphorus Concentration in the Wapato Basin of Lake Chelan97-317April 1997
Survey of NPDES Compliance Monitoring in Nine States97-309March 1997
Waste Load Allocations for Biochemical Oxygen Demand for Inland Empire Paper Company97-313March 1997
Washington State Wetlands Identification and Delineation Manual96-94March 1997
Pesticides Detected in the Walla Walla Drainage, April and June 1996. Memo to C. Nuechterlein, D. Knight, and J. Jacobson, Eastern Regional Office.97-e03February 1997
Chehalis Best Management Practices Evaluation Project, 1996-97 Annual Report97-305February 1997
Chehalis Best Management Practices Evaluation Project, 1995-96 Water Quality Data Report for Bunker/Deep Creek Project Area97-306February 1997
Water Quality Assessments of Selected Lakes within Washington State - 199497-307February 1997
Stormwater and Wetlands97-091February 1997
Colville River Water Quality: Pollutant Loading Capacity and Recommendations for Total Daily Maximum Loads96-3491997
Beaver/Allen Creek Water Quality Data Report 1995-199697-3001997
Persistence and Drift of the Aquatic Herbicide Diquat Following Application at Steilacoom and Gravelly Lakes97-3011997
Watershed Briefing Paper for the Spokane Water Quality Management Area97-3371997
Pesticides in Selected Small Streams in the Puget Sound Basin, 1987-199597-e001997
Results from Additional Pesticide Sampling in the Walla Walla Drainage, April and May 1997. Memo to C. Nuechterlein, D. Knight, and J. Jacobsen, August 5, 1997.97-e061997
Pollutant Loading Capacity for the Black River, Chehalis River System, Washington. Article in the Journal of the American Water Resources Assn, Vol. 33, No. 2, April 1997.97-e081997
National Estuary Program for the Lower Columbia River97-2004-WQ&FA1997
Draft Models to Assess Riverine & Depressional Wetlands in the Lowlands of Western Washington97-0931997
Periodic Dam Safety Inspection Report/Indian Creek Dam97-0941997
Restoring Wetlands at a River Basin Scale - A Guide for Washington's Puget Sound97-0991997
Wetlands Function Assessment Project Update #397-1051997
Confluence, Fall 1997 Vol.2 No. 197-1081997
How Ecology Regulates Wetlands97-1121997
Identification of Holden Mine Tailing Pile Particulate Matter in Railroad Creek96-e03December 1996
Washington State Pesticide Monitoring Program: 1994 Fish Tissue and Sediment Sampling Report96-352December 1996
Chehalis Best Management Practices Evaluation Project-1995-96 Water Quality Data Report for the Chehalis River Project Area96-353December 1996
River and Stream Ambient Monitoring Report for Wateryear 199596-355December 1996
Ambient Database Management System Documentation, Version 1.596-356December 1996
Total Maximum Daily Load Development Guidelines97-315November 1996
Lower Skagit Total Maximum Daily Load Data Summary96-345November 1996
Ground Water Quality Characterization and Nitrate Investigation of the Glade Creek Watershed96-348November 1996
Relationship Between Ground Water and Surface Water in the Quilceda Creek Watershed96-333October 1996
DRAFT: Washington State Wetland Delineation Rule (Proposed Revisions to WAC 173-22)96-118October 1996
Watershed Briefing Paper for the Kitsap Basin Watershed96-335September 1996
Watershed Briefing Paper for the Upper and Lower Yakima Watersheds96-336September 1996
Watershed Briefing Paper for the Mid-Columbia Basin Watershed96-337September 1996
Watershed Briefing Paper for the Lower Columbia Basin Watershed96-338September 1996
Applying Metals Criteria to Water Quality-Based Discharge Limits96-339September 1996
Chehalis Best Management Practices Evaluation Project--1995 Temperature Monitoring Data96-340September 1996
Totten and Eld Inlets Clean Water Projects: Annual Report96-342September 1996
Results of Monitoring Metals in Chambers/Clover Creek Drainage. Memo to Bob Duffy, SWRO.96-e08July 1996
An Analysis of the Effect of Discharged Wastewater on the Stillaguamish River at Stanwood96-330July 1996
Spokane River PCB Source Monitoring Follow-up Study November and December 199596-331July 1996
Aquatic Plants Technical Assistance Program 1995 Activity Report96-332July 1996
Pendleton Woolen Mill Land Application Site Ground Water Monitoring Evaluation96-321June 1996
Taxonomic Laboratory Protocol for Stream Macroinvertebrates Collected by the Washington State Department of Ecology96-323June 1996
Chehalis Best Management Practices Evaluation Project, Report on the Black River Project Area96-325June 1996
Aquatic Plants Technical Assistance Implementation Plan - 1996 Field Season96-328June 1996
Spokane Basin Data Analysis Report - Little Spokane Sub-Basin96-329June 1996
Nooksack Watershed Surficial Aquifer Characterization96-311May 1996
Olympus Terrace Sewer District Wastewater Treatment Plant Class II Inspection Oct 16-19-199596-322May 1996
Sumas River BOD, Ammonia-N, and Chlorine Total Maximum Daily Load96-10-201April 1996
Pesticide Residues in the Skagit Delta Surficial Aquifer - Washington State Pesticide Monitoring Program96-302April 1996
Gibbons Creek Remnant Channel Receiving Water Study96-313April 1996
Gibbons Creek Fecal Coliform Total Maximum Daily Load Assessment96-316April 1996
Washington Water Power Company Kettle Falls Generator Station Class II Inspection96-320April 1996
Water Quality Guidelines for Wetlands: Using the Surface Water Quality Standards for Activities Involving Wetlands96-06April 1996
Results of Pesticide/PCB Monitoring in Chambers/Clover Creek Drainage. Memorandum to Bob Duffy, SWRO, March 15, 1996.96-e07March 1996
Washington State Pesticide Monitoring Program: Pesticides and PCBs in Marine Mussels, 199596-301March 1996
Chehalis Best Management Practices Evaluation Project, 1995/96 Annual Report96-306March 1996
Beaver/Allen Creek Water Quality Report, 1994-199596-310March 1996
Restover Truck Stop Ground Water Monitoring, August and October 199596-312March 1996
Chehalis Best Management Practices Evaluation Project, 1994-95 Water Quality Data Report for Bunker/Deep Creek Project Area96-312aMarch 1996
The Determination of Ambient Metals in Aqueous Ecosystems by ICP-MS and Cold Vapor Atomic Fluorescence Spectroscopy. Paper presented at The Pittsburg Conference, Chicago, Illinois, March 1996.96-e10March 1996
Washington State Pesticide Monitoring Program: 1994 Surface Water Sampling Report96-305February 1996
Evaluation of High Temperature in Rock Creek (Klickitat County)96-308February 1996
Lake Water Quality Assessment Program, 199396-3041996
Lacamas Creek Watershed Total Maximum Daily Load Evaluation96-3071996
Particulate Matter and Polychlorinated Biphenyls in Spokane River, Washington. Article in Microscope, Vol 44:1 1-6, 1996.96-e051996
Results of Sampling for Copper in Drainages to Sylvia Lake. Memo to Loree Randall, SWRO, January 4, 1996.96-e141996
Draft Washington State Wetland Function Assessment Project96-1101996
Wetland Function Assessment Project Update No. 296-1261996
Conducting Wetland Function Assessment Project96-1805-S&WR1996
Washington State Wetland Function Assessment Project96-br-1031996
State Wetlands Delineation Manual Notice of Public Hearings and Rule Adoption96-br-1181996
Exploring Wetland Stewardship Video96-v-1271996
Periodic Dam Safety Inspection Report - Lake Margaret Dam96-0961996
Progress Report on Survey of Metals Concentrations in the Similkameen River. Memo to Jim Milton.95-e07November 1995
Seawater Challenge of Chinook Salmon Smolts Exposed to the Aquatic Herbicide Hydrothol 19195-358November 1995
Estimates of Ground-Water Contaminant Loading to the Colville River in the Vicinity of L-Bar Products95-344October 1995
City of Chewelah Wastewater Treatment Plant Class II Inspection - October 3-6, 199495-354October 1995
Salmon Creek Nonpoint Source Pollution TMDL95-355October 1995
Washington State Pesticide Monitoring Program: 1993 Fish Tissue Sampling Report95-356October 1995
Linking Land and Water: Third National Nonpoint Source Watershed Monitoring Workshop Proceedings95-e01October 1995
Chehalis River BMP Evaluation Project: Interim Report on the Chehalis River Project Area95-336September 1995
Revised Continuous Simulation of Ammonia WLAs during November-April for the City of Enumclaw NPDES Permit. Memo to Kathy Cupps.95-e14September 1995
Pesticide Residues in the Walla Walla Surficial Aquifer - Pesticides in Ground Water Report #795-327September 1995
South Fork Palouse River Total Maximum Daily Load for Ammonia95-329September 1995
Watershed Briefing Paper for the Upper and Lower Snake River Water Quality Management Area95-346September 1995
Watershed Briefing Paper for the San Juan Islands Water Resource Inventory Area95-347September 1995
Watershed Briefing Paper for the Wenatchee Basin Water Resource Inventory Area95-348September 1995
River and Stream Ambient Monitoring Report for Wateryear 199495-349September 1995
Watershed Briefing Paper for the Western Olympic Water Quality Management Area95-351September 1995
Metals Concentrations in Rivers and Streams Dropped from the 1994 Section 303(d) List95-352September 1995
Land Use and Water Quality Mission Creek Little Mission Creek Sub-Basins - Lower Hood Canal95-072September 1995
Impacts of the Spokane Wastewater Treatment Plant in Spokane River Including Recommended NPDES Limits for Chorine and Ammonia. Memo to Roger Ray.85-e01August 1995
Loon Lake Sewer District 4 Treatment Plant Class II Inspection95-341August 1995
1995 Ambient Biological Assessment Monitoring Implementation Plan95-343August 1995
Wetlands Delineation Fact Sheet: Recent History and Current Status94-125August 1995
Ambient Monitoring Instream Biological Assessment: Progress Report of 1993 Pilot Survey95-333July 1995
Aquatic Plants Technical Assistance Implementation Plan - 1995 Field Season95-334July 1995
Snohomish River Estuary Dry Season TMDL Study Phase I - Water Quality Model Calibration95-338July 1995
Discover Wetlands - Curriculum (Part A)88-16-aJuly 1995
Discover Wetlands - Curriculum (Part B)88-16-bJuly 1995
Discover Wetlands - Curriculum (Part C)88-16-cJuly 1995
Discover Wetlands - Curriculum (Part D)88-16-dJuly 1995
Description of Spatial Analyses in Support of Columbia Gorge TMDL Projects, Memo to David Giglio, Karol Erickson, and Bob Cusimano.95-e18June 1995
GIS Analysis, Yakima River Suspended Sediment TMDL Evaluation. Memo to Joe Joy.95-e17June 1995
Chehalis Best Management Practices Evaluation Project, 1994-1995 Annual Report95-315June 1995
Water Quality Impacts from Dairies in Washington State: A Literature Review95-326June 1995
Fishtrap Creek Total Maximum Daily Load Study95-328June 1995
Joe Creek Receiving Water Study95-330June 1995
Aquatic Plants Technical Assistance 1994 Activity Report95-331June 1995
Loon Lake Class II Inspection, Groundwater Permit No. ST 801995-319May 1995
Watershed Briefing Paper for the Nooksack Water Resource Inventory Area95-321May 1995
Results of Monitoring Copper Sulfate Application to Sylvia Lake95-322May 1995
Protocols for Determining the Mean Epilimnetic Total Phosphorus Concentration and Secchi Disc Depth in the Wapato Basin of Lake Chelan95-e16May 1995
Summary of Guidelines for Contaminated Freshwater Sediments95-308March 1995
Puyallup - White Watershed Initial Assessment95-008March 1995
Tucannon River Fish Habitat Analysis Using the Instream Flow Incremental Methodology95-167March 1995
Bioassays of Spokane River Sediments (Final).95-e19February 1995
Guidance for Conducting Water Quality Assessments & Watershed Characterizations under the Nonpoint Rule (Chapter 400-12 WAC)95-307February 1995
Department of Ecology 1993-94 Investigation of PCBs in the Spokane River95-310February 1995
1994 Statewide Water Quality Assessment Lakes Chapter - Companion Document to WA State 305(b)95-311February 1995
Water Resources Management Program for The Main Stem Of The Snake River in Washington Statewac173-564January 1995
Corrections to Ecology Report 94-100, "Spokane River Basin Class II Inspection at the Spokane River Industrial Park Wastewater Treatment Plant."95-e021995
Atomic Fluorescence Determination of Mercury in Fresh Water Ecosystems. Article in Journal of Automatic Chemistry, Volume 17, Number 2 (March-April 1995).95-e091995
Corps of Engineers Wetlands Delineation Manual '8794-5501995
Duwamish - Green Watershed Initial Assessment95-0011995
Entiat Watershed Initial Assessment95-0021995
Upper Chehalis Watershed Initial Assessment95-0031995
Tucannon River Watershed Initial Assessment95-0041995
Snohomish Watershed Initial Assessment95-0061995
Cedar-Sammamish Watershed Initial Assessment95-0071995
Chambers - Clover Creek Watershed Initial Assessment95-0091995
Deschutes Watershed Initial Assessment95-0101995
Walla Walla Watershed Initial Assessment95-0111995
Wenatchee River Watershed Initial Assessment95-0121995
Chelan Watershed Initial Assessment95-0131995
Okanogan Watershed Initial Assessment95-0141995
Little Spokane Watershed Initial Assessment95-0151995
Kettle Watershed Initial Assessment95-0161995
Pend Oreille Watershed Initial Assessment95-0171995
Upper Chehalis Watershed Assessment Summary95-1501995
Entiat River Watershed Assessment Summary95-1511995
Tucannon River Watershed Assessment Summary95-1521995
Duwamish-Green Watershed Assessment Summary95-1531995
Snohomish River Watershed Assessment Summary95-1541995
Cedar-Sammamish Watershed Assessment Summary95-1551995
Puyallup-White Watershed Assessment Summary95-1561995
Chambers-Clover Watershed Assessment Summary95-1571995
Deschutes River Watershed Assessment Summary95-1581995
Walla Walla Watershed Assessment Summary95-1591995
Wenatchee River Watershed Assessment Summary95-1601995
Chelan Watershed Assessment Summary95-1611995
Okanogan River Watershed Assessment Summary95-1621995
Little Spokane River Watershed Assessment Summary95-1631995
Kettle River Watershed Assessment Summary95-1641995
Pend Oreille River Watershed Assessment Summary95-1651995
Washington State Pesticide Monitoring Program: Reconnaissance Sampling of Fish Tissue and Sediments (1992)94-194December 1994
Responsiveness Summary : Amendments to: Chapter 1273-563 WAC Instream Resources Protection Program for the Main Stem Columbia River in Washington State and Chapter 173-564 WAC Water Resources Management Program for the Main Stem of the Snake River94-11-001December 1994
Wetland Regulations Guidebook88-05December 1994
State Wetlands Integration Strategy95-100December 1994
Executive Summary: State Wetlands Integration Strategy95-103December 1994
PCB and Lead Results for 1994 Spokane River Fish Samples94-e41November 1994
Lake Stevens Sewer District Basin Class II Inspection Summary94-e20November 1994
Contaminant Trends in Lake Roosevelt94-185November 1994
Assessment of Declining-Water Levels in Lake Devereaux, Mason County, WA.OFTR 94-08November 1994
Pendleton Woolen Mills Class II Inspection, April 199394-162October 1994
Town of Naches Sewage Treatment Plant Class II Inspection, July 199394-163October 1994
Washington State Pesticide Monitoring Program: 1993 Surface Water Sampling Report94-164October 1994
Water Quality Assessment in the Burley Minter Creek Watersheds Kitsap & Pierce Counties, WA94-172October 1994
Priority Pollutants in Sediment from Ebey Slough, Snohomish River Estuary94-173October 1994
Zinc, Copper, and Cadmium Concentrations in Four Washington Rivers94-58October 1994
Upper Chehalis River Basin: Evaluation of Total Maximum Daily Loads Summary Report94-144September 1994
Survey of Chemical Contaminants in Ten Washington Lakes94-154September 1994
Dissolved Oxygen in the Spokane River Downstream from Inland Empire Paper Company with Recommendations for Waste Load Allocations for Biochemical Oxygen Demand94-155September 1994
City of Medical Lake Sewage Treatment Facility Class II Inspection94-156September 1994
River and Stream Ambient Monitoring Report for Wateryear 199394-158September 1994
Wenatchee River Basin Class II Inspection at the City of Cashmere Wastewater Treatment Plant94-e12July 1994
Addendum to the 1993 Puyallup River TMDL Report (Pub #96-326)94-e36July 1994
Wenatchee River Basin Class II Inspection at the City of Leavenworth Wastewater Treatment Plant94-e13July 1994
Results of 1993 Screening Survey on PCBs and Metals in the Spokane River94-e24July 1994
1994 Spokane River Survey - Fish Tissue and Sediment Sampling Plan.94-e05July 1994
Spokane River Basin Class II Inspection at Kaiser Aluminum Corp at Trentwood Wastewater Treatment Plant94-122July 1994
1992 Budd Inlet Seasonal Monitoring Report94-132July 1994
Black River Wet Season Nonpoint Source Total Maximum Daily Load Study94-104June 1994
Black River Dissolved Oxygen and Phosphorus Total Maximum Daily Load Study94-106June 1994
Instream Biological Assessment Monitoring Protocols: Benthic Macroinvertebrates94-113June 1994
Whatcom County Hydraulic Continuity Investigation, Part II94-01May 1994
Planar PCBs in Spokane River Fish. Memo to Carl Nuechterlein, ERO.94-e23May 1994
Effectiveness of Forest Road and Timber Harvest Best Management Practices with Respect to Sediment-Related Water Quality Impacts, Interim Report No. 294-67May 1994
Freshwater Ambient Monitoring Report for Wateryear 199294-70May 1994
Snoqualmie River Total Maximum Daily Load Study94-71May 1994
Spokane River Basin Class II Inspection at the Inland Empire Paper Company Wastewater Treatment Plant94-88May 1994
Spokane River Basin Class II Inspection at the City of Spokane Wastewater Treatment Plant94-89May 1994
Drainage Basin Tracing Study: Phase II, Chemicals Found in Storm Drains, Whatcom Creek and Squalicum Harbor in Bellingham, Washington94-90May 1994
Lake Water Quality Assessment Program, 1991-199294-46April 1994
Spokane River Basin Class II Inspection at the Liberty Lake Wastewater Treatment Plant94-55April 1994
Woodland Creek Water Quality Assessment Final Report, Ecology Building Project94-62April 1994
City of Tekoa. Wastewater Treatment Plan Class II Inspection, August 31 - September 1, 199394-33March 1994
A Review of the Data from the Entiat River Basin Collected for the Ambient Monitoring Database94-e15March 1994
Guidelines for Developing Freshwater Wetlands Mitigation Plans and Proposals94-029March 1994
Ponderosa Dam Hydrologic AnalysisOFTR 94-03March 1994
Technical Guidance for Assessing the Quality of Aquatic Environments, A Handbook prepared for the Water Quality Financial Assistance Program (revised 1994)91-78February 1994
Water-Level Monitoring, Bellingham Frozen Foods, September 14 through December 9, 1993, Bellingham, Washington94-e14February 1994
Assessment of Declining Water Levels in Lake Devereaux, Mason County, WA94-08 OFTRJanuary 1994
Spokane River Basin Class II Inspection at the Spokane Industrial Park Wastewater Treatment Plant94-1001994
Appendices for the report, Black River Dissolved Oxygen and Phosphorus Total Maximum Daily Load Study94-106app1994
Upper Chehalis River Dry Season Total Maximum Daily Load Study94-1261994
Cadmium, Copper, Mercury, Lead, and Zinc in the Spokane River: Comparisons with Water Quality Standards and Recommendations for Total Maximum Daily Loads94-991994
Wetlands Poster94-p-5151994
Fabulous Wetlands Videos94-V-5001994
A Citizen′s Manual for Developing Integrated Aquatic Vegetation Management Plans93-0931994
Woodland Creek Water Quality Assessment Final Report Ecology Building Project94-0621994
A Citizen's Guide to Understanding & Monitoring Lakes and Streams94-1491994
Forming a Lake Association94-1501994
Aquatic Plant ControlWQFA-94-1071994
Periodic Dam Safety Inspection Report Dawn Lake94-0071994
Periodic Dam Safety Inspection. Report Power Lake Dam94-0111994
Periodic Dam Safety Inspection Report, Marcel Lake Dam, King County94-0531994
Dam Safety Inspection - Lacamas/Round Lake Dams94-0601994
Periodic Dam Safety Inspection Report-Rose Lake Dam94-1421994
Chehalis River Basin Class II Inspections at Eight NPDES Permitted Dischargers, August 1991-August 199293-e11December 1993
Evaluation of Effluent Centrifugation: Lessons Learned93-e62December 1993
Field Sampling and Measurement Protocols for the Watershed Assessments Section93-e04November 1993
Yakima Regional Wastewater Treatment Plant Class II Inspection, October 5-7,1992.93-e28November 1993
Longview Fibre Company Class II Inspection November 2-3, 199394-160November 1993
Whatcom County Hydraulic Continuity Investigation, Part I93-08October 1993
Whole Effluent Toxicity Testing And Limitswac173-205October 1993
Effectiveness of Best Management Practices for Aerial Application of Forest Pesticides93-81October 1993
Summary of Ambient Monitoring Data Collected from the Snohomish River Basin93-e18October 1993
The High Rock Aquifer Break of October 1993OFTR 95-21October 1993
Willapa Bay Watershed Bacterial Evaluation and Preliminary Control Strategy93-64September 1993
Stanwood Class II Inspection - September 8-9, 199293-e29September 1993
Moxee Drain BMP Implementation Demonstration Project Water Quality Monitoring Report93-e55September 1993
Meadow Lake Dam Hydrologic AnalysisOFTR 93-04September 1993
South Fork Palouse River Analysis of Ambient Monitoring Data93-e25August 1993
Interim Report on Monitoring Contaminant Trends in Lake Roosevelt93-e53August 1993
Washington State Wetlands Rating System-Western Washington (Second Edition)93-074August 1993
Coordinating Wetlands Requirements Under the Shoreline Management Act and the Growth Management Act94-180August 1993
Puyallup River Total Maximum Daily Load for Biochemical Oxygen Demand, Ammonia, and Residual Chlorine (This is a summary of 96-326, a 1993 report with the same title.)96-326aJuly 1993
Alderwood Wastewater Treatment Plant - October 26-27, 199293-e56July 1993
Puyallup River Total Maximum Daily Load for Biochemical Oxygen Demand, Ammonia, and Residual Chlorine (This is a 1993 report; 96-326a is a summary of this report with the same title.)96-326June 1993
South Fork Palouse River Total Maximum Daily Load of Ammonia93-e48June 1993
Effectiveness of Forest Road and Timber Harvest Best Management Practices with Respect to Sediment-Related Water Quality Impacts, Interim Report No. 194-27June 1993
Persistence and Drift of the Herbicide Endothall Following Applications at Lakeland Village and Gravelly Lakes, Washington93-e51May 1993
City of Grandview Class II Inspection, October 21-23, 199193-e60May 1993
Ballinger Lake Total Phosphorus Total Maximum Daily Load93-10-202April 1993
Lower Columbia River Bi-State Water Quality Program: Bacteria Study, November - December 199293-28April 1993
Yakima River Basin Class II Inspections at Toppenish, Zillah, Sunnyside, Mabton, Wapato, Moxee, Selah, Ellensburg, and Granger Wastewater Treatment Plants93-e19April 1993
Contaminants in Vactor Truck Wastes93-e49April 1993
Liberty Lake Phosphorus Total Maximum Daily Load93-10-205March 1993
Pipers Creek Fecal Coliform Bacteria Total Maximum Daily Load93-10-210March 1993
Weaver Creek BOD and Ammonia-N Total Maximum Daily Load (TMDL)93-10-206March 1993
Washington State Pesticide Monitoring Program: Reconnaissance Sampling of Surface Waters (1992)93-e09March 1993
Sonoco Products Company (Sumner Mill), June 2-3, 1992, Class II Inspection93-e22March 1993
Snohomish Wastewater Treatment Plant Class II Inspection - September 20-21, 199293-e59March 1993
Aberdeen Lake Dam Hydrologic AnalysisOFTR 93-02March 1993
Sawyer Lake Total Maximum Daily Load for Phosphorus93-10-201February 1993
Wildcat Creek Ammonia-N, BOD, Chlorine, and Fecal Coliform TMDL93-10-208February 1993
Dragoon Creek BOD TMDL93-10-209February 1993
Class II Inspection of the Boise Cascade Pulp & Paper Mill, Wallula, Washington - April 199293-e33February 1993
Fenwick Lake Total Phosphorus Total Maximum Daily Load93-10-203January 1993
Chelan Lake Total Phosphorus Total Maximum Daily Load (TMDL)93-10-204January 1993
Lake Water Quality Assessment Project, 199092-1241993
Water Quality Data Summary and Linear Trend Analysis of the Wenatchee River Basin93-e161993
Clark Fork - Pend Oreille Basin Water Quality Study, A Summary of Findings and a Management Plan93-e541993
Restoring Wetlands in Washington: A Guidebook for Wetland Restoration, Planning & Implementation93-0171993
Appendices to Restoring Wetlands in Washington: A Guidebook for Wetland Restoration, Planning & Implementation93-017-appx1993
Los Humedales93-026ES1993
Nisqually River Management Plan93-0691993
Wetlands, Streams and Estuaries Poster Distributors94-1511993
Selecting Best Management Practices for Stormwater ManagementWQ-R-93-0111993
Stormwater Erosion and Sediment Control for Small Parcel ConstructionWQ-R-93-0121993
Periodic Dam Safety Inspection Report: Trout Lake Dam92-0841993
Periodic Dam Safety Inspection Report - Aberdeen Lake Dam93-0291993
Water Quality Screening in the Dakota, Bertrand, and Fishtrap Creek Watersheds, Whatcom County, Washington92-e14December 1992
Snoqualmie River Basin Class II Inspections at North Bend, Snoqualmie, and Duvall Wastewater Treatment Plants92-e21December 1992
Mount Vernon Wastewater Treatment Plant Class II Inspection92-e32December 1992
Controlling Lake Plants With Chemicals92-116December 1992
Review and Evaluation of Microtox Test for Freshwater Sediments92-e04November 1992
City of Lynnwood WTP Class II Inspection92-e17November 1992
Johnson Creek, Whatcom County, Washington92-e13October 1992
Annual Report for the Black River Nonpoint TMDL Study. Memo to Bill Backous, Diane Harvester, Dick Wallace, and Kahle Jennings, October 13, 1992.92-e11October 1992
Sumas River Receiving Water Study92-e07October 1992
Nitrate-Nitrite Level in Glade Creek92-e16October 1992
Woodland Creek Baseline Data Summary, January 1991-March 199292-e15August 1992
Survey of Contaminants in Sediments in Lake Union and Adjoining Waters92-e10August 1992
Methow River Basin Fish Habitat Analysis Using the Instream Flow Incremental Methodology92-082August 1992
An Investigation of Recurrent Fish Kills at Maritime Heritage Fish Hatchery in Bellingham: Fall 1990 Study92-e53July 1992
Chehalis River Basin Water Quality Screening, January and March 199192-e12July 1992
Effectiveness of Washington's Forest Practice Riparian Management Zone Regulations for Protection of Stream Temperature92-64July 1992
Grays Harbor (Inner) Dioxin Total Maximum Daily Load92-10-202June 1992
Results of Ground Water Sampling at National Frozen Foods/Midway Meats, Centralia, October 199192-e05June 1992
Copper in Sediments from Lake Steilacoom Lake, Pierce County, WA92-e00June 1992
Effects of Polycyclic Aromatic Hydrocarbons (PAHs) in Sediments from Lake Washington on Freshwater Bioassay Organisms and Benthic Macroinvertebrates92-e01June 1992
Pomeroy Wastewater Treatment Plant Limited Class II Inspection and Receiving Water Study on Pataha Creek92-e06June 1992
Salmon Creek WTP Class II Inspection92-e20June 1992
Historical Data Sources and Water Quality Problems in the Chehalis River Basin - First Interim Report for the Chehalis River TMDL92-e54June 1992
Administration Of Surface And Ground Water Codeswac508-12June 1992
Results of Sediment Sampling in the J.H. Baxter Cove, Lake Washington - June 1991.92-e50May 1992
Spatial and Temporal Trends in Contaminant Levels Associated with Settling Particulate Matter in Sitcum Waterway (Commencement Bay) July 1990 to June 199192-e51May 1992
Commencement Bay (Inner) Dioxin Total Maximum Daily Load92-10-201April 1992
Miller Creek WTP Class II Inspection April 199192-e19April 1992
South Fork Palouse River Basin Class II Inspections at Pullman and Albion, July 23-25 and October 1-3, 199192-e31April 1992
Shoptalk, Spring 1992, Volume 2 #2: Paint: A Common Waste Stream92-04-002April 1992
Des Moines Creek WWTP Class II Inspection October 21-23, 199192-e30March 1992
Impacts of Eastern State Hospital and Lakeland Village Wastewater Discharges on the Quality of West Medical Lake92-e63March 1992
Wetlands Mitigation Banking92-012March 1992
Designing Wetlands Preservation Programs for Local Governments: A Guide to Non-Regulatory Protection92-018March 1992
Designing Wetlands Preservation Programs for Local Governments: A Summary92-019March 1992
Evaluation of Bioassay Organisms for Freshwater Sediment Toxicity Testing92-e02February 1992
Inland Empire Paper Company Mixing Zone Survey, September 199092-e40February 1992
Wetland Mitigation Replacement Ratios: Defining Equivalency92-008February 1992
Wetland Mitigation Replacement Ratios: an Annotated Bibliography92-009February 1992
Wetland Buffers: Use and Effectiveness92-010February 1992
Wetland Buffers: An Annotated Bibliography92-011February 1992
Wetland Buffers: Use and Effectiveness (Appendices)92-10aFebruary 1992
Timber/Fish/Wildlife Ecoregion Bioassessment Pilot Project92-631992
Status Report: Freshwater Sediment Criteria Development Project92-e031992
Upper Snoqualmie River Special Study92-e341992
The Changing Spokane River Watershed: Actions to Improve and Maintain Water Quality. (Chapter in a book.)92-e601992
Approach to Developing Nutrient Loading Criteria for Franklin D. Roosevelt Lake92-e621992
Upper Snoqualmie River Special Study92-e641992
Wetlands92-0491992
Washington's Wetlands92-1051992
Wetland Tales - A Collection of Stories92-171992
Wetlands Preservation-Opportunities for Landowners92-br-0061992
Focus Sheet: Controlling Lake Plants with ChemicalsF-WQ-92-1161992
Focus Sheet: Permission Needed to Put Herbicides in the WaterF-WQ-92-1341992
Washington State Hydropower Development/Resource Protection Plan92-016A1992
Periodic Dam Safety Inspection Report: Solmar Lake Dam92-0831992
Review of Metals, Bioassay, and Macroinvertebrate Data from Lake Roosevelt Benthic Samples Collected in 1989. Memo to Carl Nuechterlein.91-e23December 1991
Trends in Pend Oreille River Ambient Monitoring Data. Memo to Will Kendra.91-e16December 1991
Investigation of WQ Problems in the Black River Between the Black River Canoe Club & Mouth of Mima91-e41December 1991
Wetland Walks: A Guide to Washington's Public Access Wetlands89-030December 1991
Wetlands Preservation: An Information & Action Guide90-005December 1991
Polychlorinated Dioxins and -Furans in Columbia River Sportfish, Chief Joseph Dam to McNary Dam91-49November 1991
Lake Water Quality Assessment Project, 198991-60November 1991
Water Resources Program In The Methow River Basin, WRIA 48wac173-548November 1991
Little Spokane River Study, Final Report91-e15November 1991
Kaiser Aluminum and Chemical Corporation-Trentwood, Class II Inspection. Memo to Roger Ray and Patrick Hallinan, November 8, 1991.91-e13November 1991
Pend Oreille River Primary Productivity and Water Quality of Selected Tributaries91-e08November 1991
Seneca Foods, Wastewater Treatment Plant Class II Inspection91-e21November 1991
Toppenish Sewage Treatment Plant Class II Inspection, May 29-30, 199091-e02October 1991
Basic Water Monitoring Program Fish Tissue and Sediment Sampling for 198991-e14October 1991
Washington State Wetlands Rating System for Eastern Washington91-058October 1991
Summary of Criteria and Guidelines for Contaminated Freshwater Sediments91-e03September 1991
Organochlorine analysis of Yakima River samples for State of the Environment Report. Memo to Bob Barwin and Steve Saunders September 27, 1991.91-e27September 1991
Water Resources Management Program Established Pursuant To The Water Resources Act Of 1971wac173-500August 1991
James River, Camas Pulp and Paper Mill Class II Inspection, June 4-6, 199091-e01August 1991
Guidance for Determination and Allocation of Total Maximum Daily Loads (TMDL) in Washington State91-e31August 1991
Waste Antifreeze Characterization Study91-e46August 1991
Beaver Creek Methow River Closed Tributary Report91-11-001August 1991
Hydrologic Effects of Ground-Water Pumping on Sinking Creek and Tributary Springs, Lincoln County, WashingtonOFTR 91-04August 1991
Results of Screen for EPA Xenobiotics in Sediment and Bottom Fish from Lake Roosevelt (Columbia River). Memo to Carl Nuechterlein.91-e24July 1991
Water Quality Survey of 15 "Volunteer-Monitored" Lakes in Washington State91-e06July 1991
Metals Concentrations in Lake Roosevelt (Columbia River) Largescale Suckers. Memo to Carl Nuechterlein.91-e26June 1991
Spatial Trends in TCDD/TCDF Concentrations in Sediment and Bottom Fish Collected in Lake Roosevelt (Columbia River)91-29June 1991
Metal and Fecal Coliform Concentrations in the Lower Columbia River. Memo to Steve Saunders.91-e25May 1991
PCDDs and PCDFs in Columbia River Suspended Particulate Matter. Memo to Bob Barwin and Steve Saunders.91-e28May 1991
Snoqualmie River NPDES Permitted Dischargers July - September 1989 Inspections91-e20May 1991
Distribution and Significance of Polycyclic Aromatic Hydrocarbons in Lake Washington Sediments Adjacent to Quendall Terminals/J.H. Baxter Site91-e39May 1991
Lake Chelan Total Maximum Daily Load for Total Phosphorus (Memorandum)91-e50April 1991
Longview Fibre Company Class II Inspection91-e09April 1991
Snoqualmie River Low Flow Water Quality Assessment, July-September 1989.91-e30April 1991
Second Progress Report on Ecology's Dioxin/Furan Survey in the Middle Columbia River. Memo to Gerry Jewett, Bob Barwin, and Carl Nuechterlein, April 9.91-e43April 1991
Polychlorinated Dioxins and -Furans in Lake Roosevelt (Columbia River) Sportfish, 199091-4March 1991
Diagnostic Study of Lake Sawyer, King County, Washington91-e05March 1991
Pend Oreille River Fishery/Rotovation Study91-e07March 1991
Lake Union Fish Histopathology Study91-e33March 1991
Appendices A and B for: Diagnostic Study of Lake Sawyer, King County, Washington91e05appAB1991
Appendices C and D for: Diagnostic Study of Lake Sawyer, King County, Washington91e05appCD1991
Appendices E, F, and G for: Diagnostic Study of Lake Sawyer, King County, Washington91e05appEFG1991
Reynolds Metal Company Class II Inspection February 199091-e191991
Quality of Salmonid Hatchery Effluents during a Summer Low-Flow Season. Article in Transactions of the American Fisheries Society 120:43-51, 1991.91-e321991
First Progress Report on Ecology's Dioxin/Furan Survey in the Middle Columbia River91-e421991
Roslyn Post-Upgrade Wastewater Treatment Plant Limited Class II Inspection and Receiving Water Study on Crystal Creek91-e471991
Portage Creek: Nonpoint Source Pollution Effects on Quality of the Water Resource95-3001991
Periodic Dam Safety Inspection Report - Cascade Lk91-0071991
Periodic Dam Safety Inspection Report: Clear Lake Reservoir, Main Dam and Saddle Dam.91-0551991
Responsiveness Summary - Methow Closed Basin Regulation91-0651991
Lower Columbia River Bi-State Program: 1990 Documents05-10-081December 1990
Black River Water Quality, Winter 1989/1990. Memo to Gene Deschamps.90-e14December 1990
Timber-Fish-Wildlife - Evaluation of Prediction Models and Characterization of Stream Temperature Regimes in Washington90-e74December 1990
Second Progress Report on Ecology's Dioxin/Furan Survey in Lake Roosevelt. Memo to Carl Nuechterlein.90-e42November 1990
Lake Sawyer Hydrogeologic Study--Black Diamond, Washington90-e23October 1990
Data Appendix: Timber-Fish-Wildlife - Evaluation of Prediction Models and Characterization of Stream Temperature Regimes in Washington90-e75October 1990
First Progress Report: Freshwater Sediment Criteria Project90-e04September 1990
Model Wetlands Protection Ordinance93-504September 1990
First Progress Report on Ecology's Dioxin/Furan Survey in Lake Roosevelt. Memo to Carl Nuechterlein.90-e39August 1990
Little Klickitat River Basin Fish Habitat Analysis Using the Instream Flow Incremental Methodology90-030August 1990
Washington State Hydric Soils Guidebook90-020July 1990
Tacoma Central Wastewater Treatment Plant Class II Inspection, June 26-28, 198990-e01June 1990
Water Quality in the Johnson Creek Watershed after the Implementation of Best Management Practices90-e16June 1990
Quality of Grays Harbor Pulp Mill Effluents, March-June 198990-e43June 1990
Methow River Water Quality Survey and Assessment of Compliance with Water Quality Standards90-e71June 1990
1989 Lakes and Reservoir Water Quality Assessment Program: Survey of Chemical Contaminants in Ten Washington Lakes90-e35May 1990
Copper in Steilacoom Lake. Memo to Steve Saunders.90-e11April 1990
Follow-up Survey for Volatiles in the Little Spokane River. Memo to Mike Blum March 26, 1990.90-e34March 1990
Survey of Metals and Organics in the Skagit River Below the Burlington Wastewater Treatment Plant. Memo to Dave Nunnallee.90-e08March 1990
Water Quality Survey of 25 Citizen-Volunteer Lakes from Washington State90-e03March 1990
Diagnostic Study of Myron Lake, Yakima County, Washington, July 1988 through December 198990-e61March 1990
Progress Report No. 1, Pend Oreille River Water Quality Study90-e62March 1990
Endicott Wastewater Treatment Plant Limited Class II Inspection and Impact of Discharge on Rebel Flat Creek90-e70March 1990
Results of Screen for Dioxin and Related Compounds in Lake Roosevelt Sportfish. Memo to John Arnquist, Carl Nuechterlein, and Phil Kauzloric.90-e46February 1990
Brief Analysis of the Cause of Reduced Spring Discharge and Streamflow, Sinking Creek Area, Lincoln CountyOFTR 90-02February 1990
Okanogan Wastewater Treatment Plant Receiving Water Survey, October 198890-e061990
A Water Quality Based Evaluation of Spokane Advanced Wastewater Treatment Plant Effluent Dilution and Receiving Water Quality During September 20-22, 198890-e071990
Transboundary Metal Pollution of the Columbia River (Franklin D. Roosevelt Lake). Article in Bulletin of Environmental Contamination and Toxicology (1990) 45:703-710.90-e381990
Survey for Volatiles in the Little Spokane River. Memo to Mike Blum January 25, 1990.90-e451990
Selah Wastewater Treatment Plant Receiving Water Survey, October 1988.90-e511990
Puget Sound Wetlands Preservation Program90-0601990
Milfoil - an Aggressive Water Weed90-br-0021990
Beehive Reservoir Hydrologic AnalysisOFTR 90-011990
A Guide to Conducting Wetlands Inventories89-60December 1989
Survey of Mercury and Dioxin in Lake Roosevelt Sportfish - 1989: Preliminary Results for Mercury. Memo to Carl Nuechterlein and Phil Kauzloric.89-e29November 1989
The Black River Fish Kill Report89-54October 1989
Lake Sawyer - Black Diamond Waste Load Allocation Evaluation.89-e40September 1989
Enumclaw Class II Inspection Report, October 4-5, 1988.89-e16August 1989
Eagle Harbor Remedial Investigation Draft Report. Memo to Nigel Blakley.89-e04July 1989
Tekoa Wastewater Treatment Plant Limited Class II and Receiving Water Survey.89-e00July 1989
Green River Fish Habitat Analysis Using the Instream Flow Incremental Methodology89-035July 1989
Lake Sawyer Fishkill. Memo to Bob Newman through Greg Pelletier.89-e35June 1989
Ceriodaphnia Bioassay Results from the Chehalis and Humptulips Rivers. Memo to Art Johnson June 9, 1989.89-e34June 1989
Reconnaissance Survey of the Impacts of Northside Landfill Leachate on Ground/Surface Water Quality, Spokane, Washington.89-e09May 1989
Water Quality in Fauntleroy Creek and Cove During the Summer of 1988.89-e33May 1989
Colville Wastewater Treatment Plant/Colville River Receiving Water Study.89-e39April 1989
Pacific Woodtreating Corporation, Class II Inspection89-e47April 1989
Snoqualmie Pass Wastewater Treatment Plant February 9-10, 1988 and March 2, 1988 Class II Inspection Report89-e19March 1989
An Assessment of Metals Contamination in Lake Roosevelt. Ecology Report (1988), Revised 198989-e261989
Lake Chelan Water Quality Assessment. Prepared by Harper-Owes.89-e361989
Lake Chelan Water Quality Assessment, Executive Summary. Prepared by Harper-Owes89-e371989
Shorelands Education Materials (OBSOLETE)89-br-0071989
Wetland Nightmare: Solutions for Local Gov94-v-5011989
Dillenbaugh Creek Benthic Invertebrate and Sediment Assessment, July 1987. Memo to Mike Templeton.88-e19December 1988
Screening Survey for Chemical Contaminants and Toxicity in Sediments at Five Lower Columbia River Ports, September 22-24, 1987.88-e15December 1988
Investigation of Bacterial Contamination of the Inner Harbor of Oakland Bay, 1987-88 Winter Study.88-e27December 1988
Best Management Practices Analysis for Solid Waste - Vol I of IV88-033aDecember 1988
Best Management Practices Analysis for Solid Waste - Vol II of IV88-033bDecember 1988
Best Management Practices Analysis for Solid Waste - Vol IV of IV88-033dDecember 1988
Metals Concentrations in Fish Caught in Claypit Pond, Whatcom County, WA. Memo to Kevin Fitzpatrick.88-e01October 1988
Domestic Water Withdrawals From Lake SamishOFTR 88-02October 1988
Pesticides/PCBs Analysis of McNary Pool Fish. Memo to Russ Taylor.88-e16September 1988
Quality of Palouse Wastewater Treatment Plant Effluent and Impact of Discharge to the North Fork Palouse River.88-e25September 1988
Colville Wastewater Treatment Plant Class II Inspection September 22-23, 198788-e10August 1988
Duck Lake Ground Water Management Subareawac173-132June 1988
Protection Of Upper Aquifer Zoneswac173-154June 1988
Instream Resources Protection Program–Nooksack Water Resource Inventory Area (WRIA) 1wac173-501June 1988
Instream Resources Protection Program--Snohomish River Basin, Water Resource Inventory Area (WRIA) 7wac173-507June 1988
Instream Resources Protection Program— Cedar–Sammamish Basin, Water Resource Inventory Area (WRIA) 8wac173-508June 1988
Instream Resources Protection Program– Green–Duwamish River Basin, Water Resource Inventory Area (WRIA) 9wac173-509June 1988
Instream Resources Protection Program - Puyallup River Basin, Water Resource Inventory Area (WRIA) 10wac173-510June 1988
Instream Resources Protection Program--Nisqually River Basin, Water Resource Inventory Area (WRIA) 11wac173-511June 1988
Instream Resources Protection Program-chambers- Clover Creeks Basin, Water Resource inventory Area (WRIA) 12wac173-512June 1988
Instream Resources Protection Program–Deschutes River Basin, Water Resource Inventory Area (WRIA) 13wac173-513June 1988
Instream Resources Protection Program–Kennedy– Goldsborough Water Resource Inventory Area (WRIA) 14wac173-514June 1988
Instream Resources Protection Program–Kitsap Water Resource Inventory Area (WRIA) 15wac173-515June 1988
Water Resources Program In The Chehalis River Basin, WRIA–22 And 23wac173-522June 1988
Water Resources Program In The Okanogan River Basin, WRIA 49wac173-549June 1988
Water Resources Program In The Little Spokane River Basin, WRIA 55wac173-555June 1988
Water Resources Program For The Colville River Basin, WRIA–59wac173-559June 1988
Investigation of Recurrent Coho Salmon Mortality at the Maritime Heritage Fish Hatchery in Bellingham, Washington.88-e24June 1988
Kittitas Wastewater Treatment Plant Receiving Water Survey and Abbreviated Class II Inspection: August 198788-e20May 1988
Washington State Pesticide Monitoring Program: 1995 Fish Tissue Sampling Report98-312May 1988
Basic American Foods Class II Wastewater Inspection April 27-29, 199899-319April 1988
Quality of Water, Sediment, and Biota in Wide Hollow Creek, Washington88-e26March 1988
Sampling Results for Unnamed Creek South of Queen City Farms (7/21/87).88-e35February 1988
Re-survey for Aldrin in Spring/Snipes Creek.88-e141988
Persistence of DDT in the Yakima River Drainage, Washington. Article in Archives of Environmental Contamination and Toxicology 17, 289-297 (1988)88-e171988
Black Diamond and Lake Sawyer--Clarification of Our Role in the Water Quality Assessment Project and a Proposed Project Budget. Memo to Myron Saikewicz.88-e231988
McNeil Island: Intertidal Screening Survey for Toxic Chemicals in Water, Sediment, and Clam Tissue.88-e281988
An Investigation of Stormwater and Effluent Discharge from the Boeing Company Facility in Auburn, January 1987.87-e16December 1987
Chambers Creek Wastewater Treatment Plant Receiving Water Study.87-e06September 1987
A Water Quality and Receiving Water Survey of the South Fork of the Palouse River at Pullman, September 1986.87-e17September 1987
The Spokane River Basin: Allowable Phosphorus Loading87-e29September 1987
Chambers Creek Wastewater Treatment Plant Class II Inspection, February 17-18, 1987.87-e32September 1987
Garfield Abbreviated Class II Inspection and Silver Creek Receiving Water Study.87-e08July 1987
The Effect of the Everett WTP on Water Quality in the Snohomish River Estuary.87-e07July 1987
Sources Affecting Bacteria Quality in Oakland Bay, Final Report87-e27July 1987
Cougar Creek Water Quality Survey September 1986.87-e05June 1987
Pullman Sewage Treatment Plant Class II Inspection: September 16-17, 1986.87-e11June 1987
Effects of Infiltration and Inflow on Wilkeson Wastewater Treatment Plant: Findings of a Limited Class II Inspection and Receiving Water Study.87-e22June 1987
Arlington Wastewater Treatment Plant: Results of a Limited Class II Inspection and Receiving Water Study.87-e21May 1987
Receiving Water and Sediment Sampling: American Crossarm and Conduit Pentachlorophenol Spill.87-e36May 1987
Salzer Creek Survey.87-e04April 1987
Effects of McCleary Wastewater Treatment Plant Effluent on Water Quality and Macroinvertebrate Community Structure in Wildcat Creek, Washington.87-e24April 1987
Yakima River Fish Histopathology Study87-e38March 1987
Walla Walla Wastewater Treatment Plant/Mill Creek Receiving Water Survey, February 12-13, 1986, and TMDL Evaluation.87-e20March 1987
Changes in Flow and Temperature Observed in Wildcat Creek and Sam's Canal in August 1986. Memo to Greg Cloud.87-e23February 1987
Morphometry of Lake Chelan.87-11987
Dillenbaugh Creek Survey. Memo to Jon Neel.87-e031987
Black Diamond Marshland Treatment System: Ground Water Data and Marshland Wastewater Sampling. Memo to Chris Haynes and Alan Newman.87-e191987
Results of September 15, 1986, Touchet River Survey in Waitsburg. Memo to Carl Nuechterlein and Larry Peterson.86-e23December 1986
Elevated Levels of Cadmium in Dakota Creek, Whatcom County. Memo to Dave Nunnallee86-e27December 1986
Goldendale Wastewater Treatment Plant/Little Klickitat River Receiving Water Studies and Total Maximum Daily Load Evaluation. Memo to Jim Milton.86-e22October 1986
Sources of Water Quality Problems in Sequim Bay Watersheds.86-e06October 1986
Application of the Triad Approach to Freshwater Sediment Assessment: An Initial Investigation of Sediment Quality Near Gas Works Park, Lake Union.86-e41October 1986
Limitations On Use Of Referendum 39 Grant Funds For Water Pollution Abatementwac173-80September 1986
Shoreline Survey and Source Inventory of Wapato Basin, Lake Chelan.86-e29July 1986
Occurrence and Significance of DDT Compounds and Other Contaminants in Fish, Water, and Sediment from the Yakima River Basin86-5July 1986
Preliminary Analysis of Water Quality Data from the Pend Oreille River. Letter to Oliver R. Beach.86-e08May 1986
Moses Lake Water Quality Data, 1982.86-e26May 1986
Wetland Functions, Rehabilitation, and Creation in the Pacific Northwest: The State of our Understanding86-14May 1986
Preliminary Plan for an Investigation of Metals Contamination in the Upper Columbia River/Franklin D. Roosevelt Lake. Memo to Norm Glenn.86-e18April 1986
Weaver Creek Low-Flow, Point Source Reconnaissance. Memo to Jon Neel.86-e04February 1986
Review of EPA Region X Technical Assistance Team Preliminary Site Assessment of PCB Contamination at the Lewis County PUD/Ross Electrical Coal Creek Site. Memo to Jon Neel.86-e311986
Upper Methow River Basin Ground - and Surface Water Quality Monitoring Program--Status Report No. 2. Memo to Dick Cunningham.85-e00December 1985
Goldendale Wastewater Treatment Plant/Little Klickitat River Low-Flow Survey Data and Findings. Memo to Alan Newman.85-e20December 1985
Chlorine In Jewel Creek at Battle Ground. Memo to Mike Morhous.85-e19November 1985
Basic Water Monitoring Program: Fish Tissue and Sediment Sampling for 1984.85-7November 1985
Roslyn Wastewater Lagoons and Crystal Creek Receiving Water Study--Findings. Memo to Chris Haynes and Harold Porath.85-e21October 1985
Dissolved Oxygen Simulations for Mill Creek Using 1983-84 Walla Walla STP Effluent Data85-e33August 1985
North Fork Skokomish River Streamflow and Water Quality Survey. Memo to Greg Sorlie.85-e23July 1985
Rettkowski Aquifer Test, Lincoln County, WashingtonWDOE 85-4July 1985
Phosphorus Attenuation in the Spokane River85-e28June 1985
Skokomish-Dosewallips Instream Resources Protection Program (DRAFT)85-IRPP-16June 1985
The Effects of The Purdy Landfill on Fecal Coliform Levels in Nearby Streams: A Minter/Burley/Purdy Watersheds Supplementary Study. Memo to Dick Cunningham.85-e10May 1985
Lake Chelan Project Proposal.85-e09February 1985
Completion Report on WQIS Project 2 for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Metals Concentrations in Water, Sediment, and Fish Tissue Samples from Hylebos creek Drainage, August 1983 - September 1984.85-e171985
Impact of Western Processing on Water Quality in Mill Creek (Kent, WA).85-e311985
Nooksack Instream Resources Protection Program85-11-0011985
Water Quality Improvement in the Spokane River as a Result of Advanced Wastewater Treatment84-11December 1984
Impact of the Pullman Sewage Treatment Plant on the South Fork of the Palouse River. Paper by CE 515 Students.84-e33December 1984
Evaluation of Conditions Contributing to the Dissolved Oxygen Problem in the Chehalis River between Chehalis and Centralia. Memo to Jon Neel.84-e24October 1984
PCBs in Fish Taken from the Spokane River84-e30September 1984
Western Processing: Characterization of "Lake Nieuwenhuis" Water Quality and Quantity. Memo to Bob Goodman.84-e41May 1984
Liberty Lake Sewer District Sewage Treatment Plant Class II Inspection, August 30-31, 198384-e47March 1984
Lake Sequalitchew. Memo to John Bernhardt.84-e38March 1984
Assessment of Potential Impact of Dayton STP Effluent on the Touchet River, with Recommended Permit Limits for Ammonia and Chlorine. Memo to Carl Nuechterlein.84-e42March 1984
Liberty Lake WTP Receiving Water Study. Memo to Roger Ray.84-e01February 1984
Baseline Study to Determine the Water Quality and the Primary and Secondary Producers of the Spokane River, Phase 184-e061984
Appendices for the report, Baseline Study to Determine the Water Quality and the Primary and Secondary Producers of the Spokane River, Phase 184-e06app1984
Results of Low-flow Surveys in the Yakima River Above and Below Prosser STP, October 5-6, 1982, and September 13-14, 1983. Memo to Al Newman.84-e221984
DDT Concentrations in Fish taken from the Yakima River Below Birchfield (Moxee) Drain. Memo to Clar Pratt.83-e27December 1983
Sonoco, Sumner - Discharge Affect on Fecal Coliform Levels in White and Puyallup Rivers. Memo to Richard Burkhalter.83-e36December 1983
Kennedy-Goldsborough Instream Resources Protection Program83-11-001December 1983
Kennedy-Goldsborough Instream Resources Protection Program83-IRPP-14December 1983
Water Quality of Crescent Bay Lake, August 1-2, 1983. Memo to Carl Nuechterlein.83-e18November 1983
Battle Ground STP and Weaver Creek Reconnaissance Visit. Memo to Bill Yake.83-e30August 1983
Capitol Lake Storm Sewer Pipe. Memo to Darrel Anderson.83-e38July 1983
Review of Available DDT Data. Especially as Related to the Yakima River and Recent Elevated Residues Found in Samples from Birchfield (Moxee) Drain. Memo to Dick Cunningham.83-e26July 1983
Chehalis River TMDL, Ground Water Reconnaissance and Estimated Inflows. Memo to Paul Pickett.93-e14June 1983
Snake Lake Water Quality Investigation. Memo to Bob Ramsey.83-e41June 1983
Water Quality in the Gap-to-Gap Reach of the Yakima River, June-October 1982. Memo to Clar Pratt.83-e17June 1983
Quality Assurance Review for Freshwater Sediment Data Entering SEDQUAL93-e07May 1983
Little Klickitat River Receiving Water Survey in the Vicinity of Goldendale STP. Memo to Alan Newman.83-e25April 1983
Results of Harts Lake Reconnaissance: February 24, 1983. Memorandum to Frank Monahan.83-e37April 1983
Snoqualmie River Bacteria Study93-e46April 1983
Setting Effluent Ammonia Limits to Meet In-stream Toxicity Criteria. Article in Journal Water Pollution Control Federation, March 1983, p. 303-309.83-e47March 1983
Raymond/South and North Fork Willapa River Fecal Coliform Survey. Memo to Howard Steeley.83-e07January 1983
Water Quality of the Upper Spokane River and Evaluation of Methods for Measurements of the Effect of Effluent upon Primary and Secondary Producers83-e111983
Relationship Between River Ammonia Concentration and Apparent Nitrification during Low-Flow Summer Periods in the Duwamish Estuary, 1966-86. Letter to Bill Yake.83-e331983
Receiving Environment Surveys in the Puyallup River at the Tacoma Central (#1) Sewage Treatment Plant, Tacoma, Washington, July 29, 1981, August 25-26, 1981, and February 16-17, 1982. Memo to Frank Monahan.82-e18December 1982
Wenatchee River Basin Instream Protection Program82-11-001December 1982
Wenatchee River Basin Instream Resources Protection Program82-IRPP-45December 1982
Chehalis River Water Quality Data Collected July-September 1980. Memo to Howard Steeley.82-e20November 1982
Icicle Creek Water Quality Survey Results. Memo to John Hodgson.82-e25November 1982
Water Quality Survey of Anderson Creek. September 10, 1982, Letter to Don Hendrick.82-e00September 1982
Deschutes River/Capitol Lake Water Quality Assessment.82-e23September 1982
Mill Creek Discharge Limitations During October and November. Memo to Carl Nuechterlein.82-e24August 1982
The Cause(s) of Continued Hypolimnetic Anoxia in Long Lake, Washington, Following Advances Wastewater Treatment by the City of Spokane.82-31August 1982
Lake Chelan "208" Water Quality Study Data Review. Letter from R.W. Beck and Assoc., Seattle, WA to Charles Carelli.82-e12June 1982
Fishery Assessment of the Upper Spokane River82-e01June 1982
Spokane River Data82-e35May 1982
Results of One Day Survey of Lake Chelan. Memo to Dick Cunningham.82-e04May 1982
Mill Creek Receiving Water Survey. Memo to Carl Nuechterlein.82-e26May 1982
Industries Directly or Indirectly Discharging into the Columbia River from the Mouth to Bonneville Dam. Memo to Clifford Bosley, US Fish and Wildlife Service.82-e22March 1982
Water Quality of the Snohomish River/Estuary and Possible Impacts of a Proposed Hewlett Packard Manufacturing Plant.82-2February 1982
Coal Creek Slough Water Quality Survey, July 21, 1981. Memo to Jon Neel.81-e23December 1981
Capitol Lake Fecal Coliform Levels and Lake Flushing. Memo to John Bernhardt.81-e21October 1981
Chehalis River Study. Memo to Howard Steeley.81-e05September 1981
Spokane River Wasteload Allocation Study, Supplemental Report for Phosphorus Allocation81-15September 1981
Kitsap Water Resource Inventory Area 15 Instream Resource Protection Program81-11-001June 1981
1981 Water Supply for the Yakima River Watershed81-11-005May 1981
Dragoon Creek Receiving Water Study/Deer Park STP. Memo to Carl Nuechterlein.81-e18April 1981
Spokane River Wasteload Allocation Study, Phase I81-e27April 1981
Surface Water Quality in Chambers Creek/Clover Creek Drainage Basin, November 1980 - January 1981. Memo to Rick Pierce.81-e15April 1981
Fawn Lake Stream Water Quality Data. Letter to Little Skookum Shellfish Growers from Ardea Enterprises.81-e20March 1981
Wenatchee River Water Quality in the Vicinity of Leavenworth and Cashmere Sewage Treatment Plants, October 14, 1980. Memo to Harold Porath.81-e22February 1981
Assessment of Water Quality Conditions in Skamokawa Creek, Washington81-7February 1981
Nisqually River Basin Instream Resources Protection Program81-11-002February 1981
Nisqually River Basin Instream Resources Protection Program81-IRPP-11February 1981
The Impact of Renton Wastewater Treatment Plant on Water Quality of the Lower Green/Duwamish River81-21981
Dayton Class II Inspection and Touchet River Receiving Water Study. Memo to Claude Sappington.81-e101981
Metro Work on Un-ionized Ammonia and Potential Fish Kills in the Duwamish River. Memo.81-e281981
Stillaguamish River Basin Instream Resources Protection Program81-IRPP-51981
Longfellow Creek Water Quality Index Calculation. Memo to Mike Blum.80-e10December 1980
Wilson Creek Drainage Surface and Ground Water Quality. Project Report DOE 80-13.80-13November 1980
Review of Lake Chelan Water Quality Study Proposal. Memo to John Bernhardt.80-e14October 1980
Briefing Memo, Intensive Survey: Renton Wastewater Treatment Plant and Green/Duwamish River80-e25July 1980
An Assessment of the Trophic Status of Deer, Loon, and Diamond Lakes80-9July 1980
Green-Duwamish River Basin Instream Resources Protection Program80-11-002June 1980
Deschutes River Basin Instream Resources Protection Program80-IRPP-13June 1980
Green-Duwamish River Basin Instream Resources Protection Program80-IRPP-9April 1980
Puyallup River Basin Instream Resources Protection Program80-11-001March 1980
Puyallup White River Basin Instream Resources Protection Program80-IRPP-10March 1980
Low D.O. Values in the Chehalis River. Memo.80-e091980
The Effects of Waitsburg Wastewater Treatment Plant Effluent on Coppei Creek . Memo to Phil Williams.79-e37November 1979
Lower Nooksack River Water Quality Study, August 27-28, 1979. Memo to John Glynn.79-e16November 1979
Chambers-Clover Basin Instream Resource Protection Program79-11-003November 1979
Chambers-Clover Basin Instream Resources Protection Program79-IRPP-12November 1979
Water Quality Survey on Flett Creek, July 30, 1979. Memo to Rick Pierce and Ron Robinson.79-e25September 1979
Snohomish River Basin Instream Resources Protection Program79-11-001August 1979
Cedar-Sammamish Basin Instream Resources Protection Program79-11-002August 1979
Deschutes River Basin Suspended Sediment Transport Study79-e42July 1979
Follow-up Survey on Boise Creek (after removal of Enumclaw STP discharge). Memo to Dave Nunnallee.79-e10July 1979
Water Quality Trend Analysis - The Spokane River Basin. Project. Report No. DOE-PR-6.79-e32July 1979
Toxic Substances: Analytical Results of Samples from Palouse Producers (Colfax) Drainage Ditch and Fish Collected from the Palouse River at Hooper. Memo to Claude Sappington.79-e35April 1979
Assessment of Wastewater Treatment and Receiving Water Quality: South Fork of the Palouse River at Pullman, Washington79-e39February 1979
Cedar-Sammamish Basin Instream Resources Protection Program79-IRRP-8January 1979
Effects of Point-Source Discharges and Other Inputs on Water Quality in Budd Inlet, Washington.79-e171979
Snohomish River Basin Instream Resources Protection Program79-IRPP-71979
Weaver Creek: Battle Ground Sewage Treatment Plant Impact Study78-e39December 1978
Effects of Black Diamond in Ginder Creek. Memo to Ron Devitt.78-e20November 1978
Water Resources Management Program, John Day & McNary Pools - Columbia River78-11-001October 1978
Oeser Cedar Co. Discharge to Unnamed Creek (Tributary to Bellingham Bay). Memo to John Glynn.78-e16August 1978
Water Quality in Capitol Lake Olympia, Washington78-e07June 1978
The Impact of Enumclaw Trickling Filter Effluent on Boise Creek (March 21, 22, 1978.) Memo to Ron Devitt.78-e32April 1978
Impact of International Paper Company's Wood Products Mill Effluent on the Receiving Waters of the Upper Chelatchie Creek Drainages. Memo to Doug Houck.78-e23February 1978
Suspended Sediment Transport and Forest Road Construction Wildhorse Creek, Kalama River Basin. Report, College of Forest Resources, University of Washington, Seattle, WA.78-e211978
Asbestos Fibre Source Sumas River. Memo to Dick Cunningham.77-e23December 1977
Walla Walla River Basin Water Resources Management Program77-11-001December 1977
Resource Damage Assessment/Nisqually River Fish Kill, August 19, 1977. Memo to Jim Krull.77-e01October 1977
Determination of Saltwater Intrusion at Dogfish Creek near Poulsbo, WA. Memo to Dick Cunningham, Leighton Pratt.77-e03October 1977
An Efficiency Survey of the Davenport Sewage Treatment Plant and Its Effects upon Cottonwood Creek.77-e14October 1977
Water Resources Management Program, Basin Program Series 5: Colville River Basin77-11-002August 1977
Salmon Creek STP Class II Inspection. Memo to Ken Mauermann.77-e21July 1977
1996 Results on PCBs in Upper Spokane River Fish. Memo to C. Nuechterlein and D. Knight, Eastern Regional Office.97-e04July 1977
Wapato Lake - Pesticide Levels, Sediment Bioassays, and Abundance of Benthic Invertebrates. Memo to M. Linden and B. Barwin, Central Regional Office.97-e05July 1977
Cassalery Creek Data Summary77-e02June 1977
Columbia Academy - Salmon Creek Survey. Memo to Gerry Calkins.77-e10May 1977
Ostrander Creek - Woodbrook Lagoon Survey. Memo to Gerry Calkins.77-e26April 1977
Ground-Water Conditions in the Area of Swan Creek, Pierce CountyOFTR 77-08March 1977
Secondary Review of Snohomish County's RWMSCI Mathematical Model as it Applies to the Lower Snohomish River. Memo to John Spencer.77-e06March 1977
Review of Snohomish County's RWMSCI Mathematical Model As It Applies to the Lower Snohomish River. Memo to John Spencer.77-e05February 1977
Sumas River, Swift Creek, Drainage Asbestos Fibre Source Investigation. Memo to Dick Cunningham.77-e00February 1977
Deer Park STP/Dragon Creek (24-55-02) Drought Monitoring Survey (August 22-25, 1977).77-e131977
Water Quality Studies of Wildcat Creek near McCleary , Washington,77-e221977
Water Resources Management Program, Basin Program Series 4: Methow River Basin76-11-005December 1976
Water Resources Management Program, Basin Program Series 2: Chehalis River Basin75-11-001November 1976
Water Resources Management Program, Basin Program Series 3: Okanogan River Basin76-11-006July 1976
A reconnaissance Study of Certain Water Resources Management Problems of the Cedar River BasinOFTR 76-05June 1976
Onion Creek Survey, April 4-10, 1976. Memo to Rhys Sterling.76-e57May 1976
Monthly Streamflow in the Klickitat BasinOFTR 76-03May 1976
Columbia River High School, Clark County. Memo to Howard Steeley and Gerry Calkins.76-e261976
Spring Creek Federal Hatchery. Memo to Howard Steeley.76-e301976
Longfellow Creek Rehabilitation Study Appendix: Water Quality Data. Kramer, Chin & Mayo, Seattle, WA.76-e331976
The Effect of Sulfur Dioxide Treated Water on an Aquatic Insect Population76-e601976
Department of Ecology Streamflow Preservation Program76-11-0031976
Klickitat River at Klickitat Receiving Water Study. Memo to Clar Pratt.75-e29December 1975
Skagit River and Tributaries Data Summary.75-e64November 1975
Spokane River Temperature Study. Memo to Rhys Sterling.75-e62October 1975
Capitol Lake Draining Operation. Memo to Ron Pine.75-e08August 1975
Water Resources Management Program, Basin Program Series 1: Little Spokane River Basin75-11-002August 1975
Baker lake Survey. Memo to Dick Cunningham.75-e60June 1975
Pigeon Creek #1 Chronic Soil Erosion and Associated Turbidity Caused by Overflow from Municipal Water Storage Lagoon. Memo to Craig Baker.75-e36May 1975
Bioassay on Mason Creek. Memo to Mark Premo.75-e31March 1975
Analyses of Aquatic Growth in Kent-Highlands Landfill and Mason Creek. Memo to Mark Primo.75-e32March 1975
The Effects of the Cheney Sewage Effluent on the Water Quality of the Receiving Stream. Masters Thesis.75-e301975
Storm Drain at Long Lake. Memo to Gene Asselstine.74-e23December 1974
Critique of the Washington Department of Ecology Survey of the Willapa River on August 20, 21, 1974. Grays Harbor College, Aberdeen.74-e88December 1974
Survey Conducted on the Willapa River August 20-21, 1974. Memo to Howard Steeley and Vern Meinz.74-e44October 1974
Cedar Creek Youth Camp Lagoon. Memo to Ron Robinson.74-e94August 1974
Flett Creek Water Quality Survey. Memo to Jim Krull74-e89August 1974
Chimacum Creek Survey. Memo to Ron Robinson. August 13, 1974.74-e68August 1974
Duwamish River Compliance Survey.74-e33May 1974
Nooksack River Survey near Ferndale, WA. Memo to Tom McCann, Stew Messman.74-e36May 1974
Chimacum Creek Survey. Memo to Ron Robinson and Jim Krull.74-e67April 1974
Resurvey of Unnamed Tributary Adjacent to U&I Sugar Company, Moses Lake, WA. Memo to Rhys Sterling.74-e40April 1974
Moses Lake STP Efficiency STP Study. Memo to Rhys Sterling.74-e39April 1974
Survey of Flett Creek. Memo to Jim Krull and Ron Robinson.74-e61April 1974
Survey of Columbia River between Longview and Cathlamet, Washington. Memo to Dick Burkhalter and John Stetson.74-e41March 1974
Liberty Lake Sewage Treatment Plant. Memo to Howard Bunten.74-e06February 1974
A State Policy for the Management of the Waters of the Snake River in Washington (DRAFT)74-SNAKE1974
Columbia River High STP Survey. Memo to Howard Steeley, Gerry Calkins, Ron Devitt, Ron Pine73-e10December 1973
Silver Lake - Problem Status. Memo to Wes Hunter through John R. Raymond.73-e83December 1973
A.I.W. Survey, Weyerhaeuser Company - White River Operations near Enumclaw. B. Water Quality of Boise Creek. Memo to Bill Burwell.72-e14September 1973
Green River-Auburn Lagoon Outfall Survey. Memo to Ron Pine, and Tom McCann.73-e00August 1973
Medical Lake (Lagoon). Memo to Dan Neal, Ron Pine, and Ron Devitt.73-e34July 1973
Mill Creek near Battle Ground - Clark County73-e84May 1973
Investigation of Seepage to a Grant County Watercourse Adjacent to U&I Sugar Company, Moses Lake. Memo to Dan Neal.73-e65April 1973
Dredging of Simpson's Pond on Wildcat Creek at McCleary. Memo to Ron Robinson.73-e50February 1973
Water Quality Survey of Burnt Bridge and Salmon Creeks, Clark County, Washington. Memo to Dick Burkhalter.73-e66February 1973
Data from Survey of Geneva Lake, King Co. Memo to Ron Pine, Pete Hildebrandt73-e301973
Eatonville Sewage Lagoon Mashel River Survey. Memo to Ron Robinson.73-e391973
Cedar Hills Landfill, Mason Creek and Issaquah Creek Surveys. Memo to John Glynn.73-e441973
Coppei Creek Fish Kill, Walla Walla County, May 1973. Memo to Harry Tracy.73-e711973
Chambers Creek Monitoring Program. Memo to Ron Pine.72-e15December 1972
Survey of Cedar Hills Landfill Leachate, Issaquah and Mason Creeks. Memo to Tom McCann and John Glynn.72-e02November 1972
Huffman Woodfill - Charley Creek - Grays Harbor County - Westport Road. Memo to Mike Pierce.72-e19November 1972
Water Quality of Chehalis River in the Chehalis- Centralia Area. Memo to Nelson Graham.72-e22October 1972
Upper Rock Creek, Black Diamond. Memo to Bill Burwell.72-e08October 1972
Survey of Mason and Issaquah Creeks from Cedar Hills Landfill to Fish Hatchery. Memo to P. Hildebrandt and R. Pine.72-e47August 1972
Snohomish River Monitoring Project. Letter to William Smiley dated August 25, 1972.72-e41August 1972
Boise Creek Survey. Memo to S.A. Messman.72-e11August 1972
Efficiency Studies and Survey Results (Chehalis River). Memo to Ron Pine.72-e27July 1972
Newaukum Creek Survey, July 19, 1972, Pierce County. Memo to John Glynn.72-e32July 1972
Evaluation of Industrial Discharges and Their Effect Upon Bear Creek and an Unnamed Tributary. Memo to Tom McCann.72-e29July 1972
The Geohydrology of the Sidney-Molson Lakes Area, Okanogan County, Washingtonoftr 72-01May 1972
Longfellow Creek, Seattle. Memo to Tom McCann.72-e04May 1972
Newaukum Creek Re-evaluation. Memo to John Glynn.72-e31February 1972
Monitor on Puyallup River. Memo to Gene Asselstine.72-e001972
Report of Field Studies on the Willapa River August 29-31, 1972, and September 19-20, 1972. USEPA, Seattle, WA72-e261972
E.I. DuPont and Sequalitchew Creek. Memo to Ron Robinson.72-e381972
Boise Creek Survey. Memo to S.A. Messman.71-e04December 1971
Horseshoe Lake Survey, Woodland: RE: Memo from Nelson Graham dated October 12, 1971. Memo to Nelson Graham.71-e24December 1971
Columbia and Snake River Transects. Memo to Dick Cunningham.72-e40December 1971
Newaukum Creek Surveys. Memo to Stew Messman.71-e00December 1971
Willapa River Survey. Memo to Nelson Graham.71-e03November 1971
Yakima River Study Near the Utah and Idaho Sugar Company, Toppenish, Washington. Memo to Dan Neal.71-e27November 1971
Snoqualmie River at Carnation - September 27, 1971 Sample. Memo to Dick Cunningham.71-e21November 1971
Barn Lot Waste Discharge to a Tributary of Omak Lake. Memo to Tom Haggerty- Warren Myers.71-e14April 1971
Interim Report: Hanaford Creek Sampling Program, April 197171-e19April 1971
Ridgefield Wildlife Refuge Wetlands Pumping Project. Memo to Nelson Graham.71-e15March 1971
Eutrophication: Liberty Lake and Silver Lake Complaints. Memo to Tom Haggerty.70-e14October 1970
Lower Snohomish River Survey. Memo to John Arnquist and Merley McCall.70-e04August 1970
Willapa River Survey. Memo to Nelson Graham, Don Provost, and Ron Lee.70-e00August 1970
Green River Survey. Memo to Merley McCall and Dave Nunnallee.70-e05July 1970
Salmon Creek Survey. Memo to Nelson, Merley McCall70-e13June 1970
Lackamas Creek Survey Results. Memo to Nelson and Merley McCall.70-e09May 1970
Flow Measurement on Wildcat Creek. Memo to Ron Lee.70-e18March 1970
Wildcat Creek Fish Kill. Memo to Harry Tracy and Chuck Melville.70-e03March 1970
MacAleer Creek Fish Population Study. Memo to Harry Tracy of the Water Pollution Control Commission.70-e17March 1970
Willapa River Estuary Survey. Memo to Nelson Graham and Merley McCall.70-e07February 1970
Emergency Survey on Salmon Creek and Unnamed Tributary, Clark County. Memo to Merley McCall.70-e02February 1970
Survey of Mill, Cold and Doane Creeks. Memo to Don Provost, Tom Haggerty69-e01December 1969
Gheer Creek Survey. Memo to Nelson Graham.69-e05November 1969
Liberty Lake - Point Discharge Complaint. Memo to Dan Neal.69-e07November 1969
Wildcat Creek Live-box Bioassay. Memo to Chuck Melville and Don Provost.69-e02October 1969
Report on the Pollution Complaint Investigation Concerning an Algae Growth in the Wenatchee River. Memo to Ron Pine.69-e11May 1969
The Effects of the Holden Mine Tailings upon the Aquatic Insect Fauna of Railroad Creek, a Tributary to Lake Chelan. Technical Report No. 67091.67-e00October 1967
Doane Creek Water Quality Investigation.64-e00October 1964

Last updated February 07, 2012