| Title (link to summary) |
Number |
Date (released or updated) |
| Puyallup and White Rivers Dissolved Oxygen and Temperature Data Summary Report | 08-03-013 | May 2008 |
| Clarks Creek Watershed Fecal Coliform TMDL | 07-10-110 | May 2008 |
| American Plating Post-Interim-Action Groundwater Monitoring Results, April and September, 2007 | 08-03-004 | February 2008 |
| Condition of Coastal Waters of Washington State, 2000-2003: A Statistical Summary | 07-03-051 | December 2007 |
| Addendum to the Quality Assurance Project Plan for the American Plating Post-Interim Action Monitoring. | 04-03-105ADD | February 2007 |
| American Plating Post-Interim-Action Groundwater Monitoring Results, May and September, 2006 | 07-03-005 | February 2007 |
| Quality Assurance Project Plan: Puyallup River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Study | 06-03-115 | December 2006 |
| Quality Assurance Project Plan: Puyallup and White Rivers Temperature and Dissolved Oxygen Monitoring | 06-03-204 | August 2006 |
| South Puget Sound Verification of 303(d) Listings for Chemical Contaminants in Fish and Shellfish | 06-03-026 | July 2006 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan | 06-10-018 | July 2006 |
| Lake Tapps (Pierce County) Monitoring, Final Data Report | 06-03-006 | January 2006 |
| Upper White Watershed Sediment and Temperature Total Maximum Daily Load (Water Cleanup Plan) for Aquatic Habitat: Detailed Implementation Plan | 05-10-038 | January 2006 |
| American Plating Post-Interim-Action Groundwater Monitoring Results, March and August 2005 | 06-03-005 | January 2006 |
| Progress on Watershed Planning and Setting Instream Flows | 05-11-038 | December 2005 |
| Quality Assurance Project Plan: South Puget Sound Fish and Shellfish Tissue Verification of 303(d) Listings | 05-03-116 | November 2005 |
| Changes and Trends in Puget Sound Sediments: Results of the Puget Sound Ambient Monitoring Program, 1989-2000 | 05-03-024 | August 2005 |
| Temporal Monitoring of Puget Sound Sediments: Results of the Puget Sound Ambient Monitoring Program, 1989-2000 | 05-03-016 | July 2005 |
| Puyallup and White Rivers Temperature and Dissolved Oxygen July - November 2004 Monitoring Report | 05-10-053 | June 2005 |
| Marine Fueling and Oil Transfer Practices for Covered Vessels and Ships in Washington | 04-08-005 | December 2004 |
| American Plating Post-Interim-Action Groundwater Monitoring Results, February and August 2004 | 04-03-052 | November 2004 |
| Upper White Watershed Temperature Data Report: 1989 to 2003 | 04-10-061 | September 2004 |
| Quality Assurance Project Plan: Lake Tapps Monitoring | 04-03-204 | July 2004 |
| Quality Assurance Project Plan: American Plating Post-Interim Action Monitoring | 04-03-105 | March 2004 |
| Chemical Contamination, Acute Toxicity in Laboratory Tests, and Benthic Impacts in Sediments of Puget Sound: A summary of results of the joint 1997-1999 Ecology/NOAA survey | 03-03-049 | November 2003 |
| Upper White Watershed Spring Chinook Redd, Scour, and Cross-Section Assessments: 1995 - 2001 | 03-10-071 | August 2003 |
| Mt. Baker Snoqualmie National Forest Upper White Watershed Sediment and Temperature TMDL for Aquatic Habitat: Submittal Report | 03-10-032 | June 2003 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report | 03-10-055 | June 2003 |
| South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study | 03-03-021 | June 2003 |
| Focus on White River pH Water Cleanup Plan | 03-10-026 | March 2003 |
| Focus on South Prairie Creek | 03-10-024 | March 2003 |
| Effectiveness Monitoring for Dioxin Total Maximum Daily Loads in Western Washington | 03-03-002 | January 2003 |
| Quality Assurance Project Plan: Lower White River Temperature Study | 03-10-028 | January 2003 |
| Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent to the B&L Landfill, Milton | 02-03-053 | November 2002 |
| Results and Recommendations from Monitoring Arsenic Levels in 303(d) Listed Rivers in Washington | 02-03-045 | October 2002 |
| Sediment Quality in Puget Sound: Year 3, Southern Puget Sound | 02-03-033 | July 2002 |
| Quality Assurance Project Plan: Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent the B&L Landfill, Milton, Washington | 02-03-086 | April 2002 |
| PCBs in Sediments at Selected Sites in Puget Sound | 02-03-003 | February 2002 |
| River and Stream Ambient Monitoring Report for Water Year 2000 | 01-03-042 | December 2001 |
| Contaminants Associated with Settling Particulate Matter and Bottom Sediments at Two Marinas in Thea Foss Waterway | 01-03-023 | June 2001 |
| Focus Sheet: Upper White River at Risk: First Steps Toward Restoration | 01-10-038 | June 2001 |
| Re-Evaluation of Copper Impact from Wilkeson Wastewater Treatment Plant on Wilkeson Creek. | 01-03-021 | May 2001 |
| Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation | 01-03-064 | January 2001 |
| Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment | 00-03-081 | August 2000 |
| Water Quality Assessments of Selected Lakes within Washington State: 1997 | 00-03-009 | March 2000 |
| Review Draft: Assimilative Capacity Study for Nutrient Loading in the Lower White River | 00-03-001 | December 1999 |
| River and Stream Ambient Monitoring Report for Water Year 1997 | 99-332 | August 1999 |
| Return to Clean: Washington State's source-control efforts cut metals concentrations in Commencement Bay by a factor of 10 -- IN Water Environment and Technology, June 1999, p. 51-57. | 99-334 | June 1999 |
| Metals Concentrations in Commencement Bay Waterways During 1997 - 1998 | 99-308 | February 1999 |
| 1998 Sediment Trap Monitoring of Suspended Particulates in Stormwater Discharges (Thea Foss) | 98-336 | December 1998 |
| Washington State Marine Water Quality in 1996 and 1997 | 98-338 | December 1998 |
| Marine Sediment Monitoring Program II - Distribution and Structure of Benthic Communities in Puget Sound - 1989-1993 | 98-328 | September 1998 |
| Marine Sediment Monitoring Program I - Chemistry and Toxicity Testing. 1989-1995 | 98-323 | August 1998 |
| River and Stream Ambient Monitoring Report for Wateryear 1996 | 98-317 | June 1998 |
| Upper White River Spring Chinook Habitat Assessment Study | 98-304 | March 1998 |
| Stormwater Sediment Trap Monitoring of Discharges to Thea Foss Waterway | 97-322 | May 1997 |
| Puyallup Basin Treatment Plant Metals Survey | 97-303 | April 1997 |
| Washington State Marine Water Quality in 1994 and 1995 | 97-316 | April 1997 |
| Water Quality Assessments of Selected Lakes within Washington State - 1994 | 97-307 | February 1997 |
| River and Stream Ambient Monitoring Report for Wateryear 1995 | 96-355 | December 1996 |
| City of Sumner Wastewater Treatment Plant Class II Inspection, April 22-24, 1996 | 96-350 | November 1996 |
| Commencement Bay Sediment Trap Monitoring Program | 96-315 | April 1996 |
| Washington State Pesticide Monitoring Program: Pesticides and PCBs in Marine Mussels, 1995 | 96-301 | March 1996 |
| Lake Water Quality Assessment Program, 1993 | 96-304 | 1996 |
| Revised Continuous Simulation of Ammonia WLAs during November-April for the City of Enumclaw NPDES Permit. Memo to Kathy Cupps. | 95-e14 | September 1995 |
| River and Stream Ambient Monitoring Report for Wateryear 1994 | 95-349 | September 1995 |
| Metals Concentrations in Rivers and Streams Dropped from the 1994 Section 303(d) List | 95-352 | September 1995 |
| Continuous Simulation of Ammonia WLAs for the City of Enumclaw NPDES Permit. Memo to Kathy Cupps August 14, 1995. | 95-e20 | August 1995 |
| Sound Refining Company Class II Inspection, July 8, 1994 | 95-337 | July 1995 |
| Results of Intertidal Sediment Sampling at the J. M. Martinac Facility on Thea Foss Waterway, Memo to Dom Reale, Southwest Regional Office. | 95-e11 | June 1995 |
| Water Quality Impacts from Dairies in Washington State: A Literature Review | 95-326 | June 1995 |
| Marine Water Column Ambient Monitoring Program: Wateryear 1995 Long-Term Monitoring Implementation Plan | 95-324 | May 1995 |
| 1994 Statewide Water Quality Assessment Lakes Chapter - Companion Document to WA State 305(b) | 95-311 | February 1995 |
| Puyallup - White Watershed Initial Assessment | 95-008 | 1995 |
| Puyallup-White Watershed Assessment Summary | 95-156 | 1995 |
| Marine Water Column Ambient Monitoring Program: 1993 | 94-210 | December 1994 |
| Zinc, Copper, and Cadmium Concentrations in Four Washington Rivers | 94-58 | October 1994 |
| River and Stream Ambient Monitoring Report for Wateryear 1993 | 94-158 | September 1994 |
| Addendum to the 1993 Puyallup River TMDL Report (Pub #96-326) | 94-e36 | July 1994 |
| Puget Sound Ambient Monitoring Program, Marine Sediment Monitoring Task Annual Report 1991 | 94-93 | June 1994 |
| Marine Sediment Monitoring Program Progress Report | 94-e28 | June 1994 |
| Effectiveness of Forest Road and Timber Harvest Best Management Practices with Respect to Sediment-Related Water Quality Impacts, Interim Report No. 2 | 94-67 | May 1994 |
| Freshwater Ambient Monitoring Report for Wateryear 1992 | 94-70 | May 1994 |
| Lake Water Quality Assessment Program, 1991-1992 | 94-46 | April 1994 |
| Evaluation of Thea Foss Waterway Storm Drain Data | 94-e39 | 1994 |
| Puget Sound Ambient Monitoring Program 1992: Marine Sediment Monitoring Task Annual Report 1992 | 93-87 | October 1993 |
| Freshwater Ambient Monitoring Report for Wateryear 1991 | 93-75 | September 1993 |
| Spacial and Temporal Trends in Contaminant Levels in Settling Particulate Matter: Thea Foss Water (Commencement Bay) - June 1989 to November 1992 | 93-e44 | August 1993 |
| Occidental Chemical Corporation Class II Inspection, September and December 1992 | 93-e58 | August 1993 |
| Puyallup River Total Maximum Daily Load for Biochemical Oxygen Demand, Ammonia, and Residual Chlorine (This is a summary of 96-326, a 1993 report with the same title.) | 96-326a | July 1993 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and Considerations for Future Work Part 4. Sitcum Waterway. | 83-e21 | July 1993 |
| Marine Water Column Ambient Monitoring Program: Wateryear 1992 Data Report, Final Report. | 93-41 | June 1993 |
| Effectiveness of Forest Road and Timber Harvest Best Management Practices with Respect to Sediment-Related Water Quality Impacts, Interim Report No. 1 | 94-27 | June 1993 |
| Kaiser Aluminum Corporation, Tacoma, Class II Inspection - April 5-6, 1993 | 93-e57 | April 1993 |
| Sonoco Products Company (Sumner Mill), June 2-3, 1992, Class II Inspection | 93-e22 | March 1993 |
| Marine Water Column Ambient Monitoring Program: Annual Report for Wateryear 1991, Final Report. | 93-13 | February 1993 |
| Lake Water Quality Assessment Project, 1990 | 92-124 | 1993 |
| Relative Dispersion of Water Masses Near Department of Ecology Long-Term Monitoring Stations in Puget Sound Model | 93-e01 | 1993 |
| Spatial and Temporal Trends in Contaminant Levels in Settling Particulate Matter: Hylebos Waterway (Commencement Bay) - July 1990 to November 1991 | 92-e52 | December 1992 |
| PCB Results of the Sediment Trap Samples near General Metals. Memorandum to Mohsen Kourehdar, Southwest Regional Office. | 92-e49 | November 1992 |
| Effectiveness of Forest Road and Timber Harvest Best Management Practices with Respect to Sediment-related Water Quality Impacts, Progress Report | 92-e55 | October 1992 |
| Marine Water Column Monitoring Program Annual Data Report for Wateryear 1990 | 92-77 | August 1992 |
| Effectiveness of Washington's Forest Practice Riparian Management Zone Regulations for Protection of Stream Temperature | 92-64 | July 1992 |
| Puget Sound Ambient Monitoring Program, Marine Sediment Monitoring Program: Annual Report 1990 | 92-47 | May 1992 |
| Spatial and Temporal Trends in Contaminant Levels Associated with Settling Particulate Matter in Sitcum Waterway (Commencement Bay) July 1990 to June 1991 | 92-e51 | May 1992 |
| Marine Water Column Ambient Monitoring Plan: Final Report | 92-23 | April 1992 |
| Timber/Fish/Wildlife Ecoregion Bioassessment Pilot Project | 92-63 | 1992 |
| Simpson Tacoma Kraft Company February 1991 Class II Inspection Report | 92-e38 | 1992 |
| Lake Water Quality Assessment Project, 1989 | 91-60 | November 1991 |
| Cascade Pole Company (Tacoma) - Aborted Stormwater Runoff Class II Inspection Attempts; Lessons Learned and Suggested Changes. Memo to Greg Cloud. | 91-e17 | September 1991 |
| Quality of Salmonid Hatchery Effluents during a Summer Low-Flow Season. Article in Transactions of the American Fisheries Society 120:43-51, 1991. | 91-e32 | 1991 |
| Burlington Class II Inspection Report - March 28-29, 1989. Memo to Dave Wright. | 90-e24 | October 1990 |
| Tacoma Central Wastewater Treatment Plant Class II Inspection, June 26-28, 1989 | 90-e01 | June 1990 |
| U.S. Oil and Refining Company Class II Inspection, June 13-14, 1989. Memo to Kim Anderson. | 90-e28 | May 1990 |
| Edmonds Wastewater Treatment Plant Class II Inspection, April 17-19, 1989 | 90-e00 | May 1990 |
| Use of Sediment Traps to Monitor Contaminant Flux to City Waterway Sediments: Interim Report | 90-e59 | March 1990 |
| Lilyblad Class II Inspection Report, December 29-30, 1988 | 90-e26 | 1990 |
| Weyerhaeuser, Enumclaw Class II Inspection. Memo to Richard Koch. | 89-e20 | December 1989 |
| Enumclaw Class II Inspection Report, October 4-5, 1988. | 89-e16 | August 1989 |
| Pennwalt Class II Inspection Report. | 89-e15 | April 1989 |
| Quality and Fate of Fish Hatchery Effluents During the Summer Low Flow Season | 89-17 | 1989 |
| Puyallup Wastewater Treatment Plant Class II Inspection--January 19-20, 1988. | 88-e11 | May 1988 |
| An Investigation of Stormwater and Effluent Discharge from the Boeing Company Facility in Auburn, January 1987. | 87-e16 | December 1987 |
| Metals Concentrations in Asarco Discharges and Receiving Waters Following Plant Closure. | 87-e34 | October 1987 |
| Effects of Infiltration and Inflow on Wilkeson Wastewater Treatment Plant: Findings of a Limited Class II Inspection and Receiving Water Study. | 87-e22 | June 1987 |
| Investigation of Stormwater Discharges to Wheeler Osgood Waterway. | 87-e33 | May 1987 |
| An Investigation into Potential Sources of PCB Contamination in Hylebos Waterway. | 87-e35 | March 1987 |
| Enumclaw Sewage Treatment Plant/Farman Brothers Pickle Company Class II Inspection, August 19-20, 1986. Memo to Gary Brugger. | 87-e10 | February 1987 |
| Investigation of 4-Methylphenol in Bottom Sediments from Log Rafting Areas of Commencement Bay, Washington. | 87-e28 | 1987 |
| Results of PCB Analysis on Sediment Samples from General Metals. Memo to Tom Eaton. | 86-e30 | October 1986 |
| Plan for Investigation of PCB Sources in Hylebos Waterway. Memo to Dave Bradley. | 86-e19 | July 1986 |
| Orting Class II Inspection. Memo to Darrel Anderson. | 85-e03 | July 1985 |
| Completion Report on WQIS Project 4 for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Sources of Sediment Contamination in Sitcum Waterway, with Emphasis on Ores Unloaded at Terminal 7. Memo to Jim Krull. | 85-e27 | April 1985 |
| Completion Rpt WDOE Proj 5 (Part 3) for the Commencement Bay Nearshore/Tideflats Remedial Investig'n: Aromatic Hydrocarbons & Other Organic Compounds in GW Beneath D St Petroleum Storage Facilities & in Nearby City Waterway Sediments. Memo to Jim Krull. | 85-e16 | 1985 |
| Completion Report on WQIS Project 2 for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Metals Concentrations in Water, Sediment, and Fish Tissue Samples from Hylebos creek Drainage, August 1983 - September 1984. | 85-e17 | 1985 |
| Completion Report on WQIS Project 1 for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Assessment of Log Sort Yards as Metal Sources to Commencement Bay Waterways, November 1983 - June 1984. | 85-e26 | 1985 |
| Completion Report on WQIS Project 5 (Part 1) for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Priority Pollutants and Other Contaminants in City Waterway Storm Drains September-November 1983. Memo to Jim Krull. | 84-e21 | December 1984 |
| Notification that WDOE Project No. 3 ("Routine Monitoring of Major Point Sources") for the Commencement Bay Nearshore/Tideflats Investigation is Completed. Memo to Jim Krull. | 84-e15 | August 1984 |
| Organics Analysis of B&L Leachate. Memo to Greg Cloud. | 84-e16 | July 1984 |
| Organics Data on Kaiser Ditch Water Samples. Memo to Roger Stanley. | 84-e17 | July 1984 |
| Results of Priority Pollutant Analysis on Water and Sediment Samples at the Occidental and Pennwalt Facilities, Hylebos Waterway, April 1984. Memo to Frank Monahan. | 84-e20 | July 1984 |
| Data on Leachate from the B & L Woodwaste Landfill. Memo to Frank Monahan. | 84-e36 | July 1984 |
| Results of Organics Analysis on U.S. Oil Spill Samples. Memo to Jim Krull. | 84-e35 | July 1984 |
| Appendices for: Completion Rpt WDOE Proj 5 (Part 3) for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Aromatic Hydrocarbons & Other Organic Compounds in GW Beneath D St Petroleum Storage Facilities & in Nearby City Waterway Sediments | 85-e16app | May 1984 |
| Chemicals in the Morningside Drain Discharge to Hylebos Waterway. Memo to Tom Eaton. | 84-e13 | May 1984 |
| Comments on the Reapplication for a 301(h) Marine Waiver by the City of Tacoma for the North End Wastewater Treatment Plant. Memo to Carol Fleskes. | 84-e14 | April 1984 |
| Results of Priority Pollutant Analyses on Water and Sediment Samples Collected January17, 1984, from the Blair Waterway Tote Facility Dredge Spoils Crib, Tacoma. Memo to Tom Eaton. | 84-e19 | March 1984 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and Considerations for Future Work. | 84-e23 | February 1984 |
| Organics in April 17, 1984, Sample from South Lincoln Avenue Ditch Mouth. Memo to Rick Pierce. | 84-e18 | 1984 |
| Photos and appendices for: Completion Report on WQIS Project 5 (Part 1) for the Commencement Bay Nearshore/Tideflats Remedial Investigation: Priority Pollutants and Other Contaminants in City Waterway Storm Drains September-November 1983. | 84-e21photo-app | 1984 |
| Sonoco, Sumner - Discharge Affect on Fecal Coliform Levels in White and Puyallup Rivers. Memo to Richard Burkhalter. | 83-e36 | December 1983 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and Consideration for Future Work Part 6. Summary. | 83-e24 | December 1983 |
| Data on Leachate from the B&L Woodwaste Landfill. Memo to Greg Cloud. | 83-e31 | November 1983 |
| Comparison of Contaminants in Sediment from the Port of Tacoma Proposed Dredging Project in Blair Waterway with Sediment at the Commencement Bay Deep Water Disposal Site. Memo to Jim Krull. | 83-e16 | July 1983 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and considerations for Future Work Part 3. Blair Waterway. | 83-e20 | July 1983 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and Considerations for Future Work Part 2. City Waterway. | 83-e19 | May 1983 |
| Buckley STP Parshall Flume and Flow Measurement Survey. Memo to Ken Mauermann. | 83-e06 | April 1983 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and Considerations for Future Work Part 1. Hylebos Waterway. | 83-e22 | April 1983 |
| A Summary of Priority Pollutant Data for Point Sources and Sediment in Inner Commencement Bay: A Preliminary Assessment of Data and Considerations for Future Work Part 5. Milwaukee, Puyallup, St. Paul, Middle Waterways and SW Shore Commencement Bay. | 83-e23 | 1983 |
| Sound Refining Company Class II Inspection, June 30 - July 1, 1981. Memo to Fred Fenske. | 83-e32 | 1983 |
| Reconnaissance and Sampling Survey: Sumner STP and Nabisco Brands November 18, 1982. Memo to Frank Monahan/Ken Mauermann. | 82-e33 | December 1982 |
| Receiving Environment Surveys in the Puyallup River at the Tacoma Central (#1) Sewage Treatment Plant, Tacoma, Washington, July 29, 1981, August 25-26, 1981, and February 16-17, 1982. Memo to Frank Monahan. | 82-e18 | December 1982 |
| Tacoma Central (#1) Sewage Treatment Plant Class II (Priority Pollutants) Surveys: August 25-26, 1981, and February 16-17, 1982. | 82-e32 | October 1982 |
| U.S. Oil and Refining Company Receiving Water Survey, May 5, 1981. Memo to Fred Fenske. | 82-e02 | July 1982 |
| Receiving Environment Survey at the St. Regis Paper Company, Tacoma, Washington, August 11-12, 1981. Memo to Fred Fenske. | 82-e17 | June 1982 |
| Phenolics in Sitcum Waterway, Tacoma. Memo to Jim Krull. | 82-e15 | June 1982 |
| St. Regis Paper Company Class II (Priority Pollutants) Survey, August 11-12, 1981. Memo to Fred Fenske. | 82-e31 | June 1982 |
| Receiving Environment Survey in Hylebos Waterway at the Sound Refining Facility, Tacoma, Washington, June 30, 1981. Memo to Fred Fenske through Dick Cunningham. | 82-e21 | April 1982 |
| Increasing Interest in Pentachloropropene. Memo to Jim Krull. | 82-e29 | April 1982 |
| Receiving Environment Surveys in the Hylebos Waterway at the Penwalt Corporation Facility, Tacoma, Washington, June 2, 1981. Memo to Frank Monahan. | 82-e19 | March 1982 |
| Assessment of Surface Water Quality in the Vicinity of Reichhold Chemicals, Inc., Tacoma. Memo to Frank Monahan. | 82-e03 | March 1982 |
| Results from Priority Pollutant Analyses of Hooker Intertidal Sediment and Drainage Water below Jones Chemical. Memo to Jim Krull. | 82-e16 | 1982 |
| Pennwalt Corporation Class II Survey, June 2-3, 1981. Memo to Frank Monahan. | 82-e30 | 1982 |
| ASARCO Class II Survey - February 24-25, 1981. Memo to Rick Pierce. | 81-e14 | December 1981 |
| U.S. Oil and Refining Company Class II Inspection, May 5-6 1981 | 81-e32 | October 1981 |
| Reichhold Chemicals, Inc., Class II Inspection: 4/21/81. Memo to Frank Monahan. | 81-e31 | September 1981 |
| Jones Chemical, Tacoma. Memo to Darrel Anderson. | 81-e30 | May 1981 |
| Hooker Chemical Corp., Tacoma, Class II Inspection. | 80-e21 | June 1980 |
| Puyallup River Basin Instream Resources Protection Program | 80-11-001 | March 1980 |
| Puyallup White River Basin Instream Resources Protection Program | 80-IRPP-10 | March 1980 |
| Enumclaw Sewage Treatment Plant Class II Inspection. Memo to Dave Nunnallee. | 79-e14 | October 1979 |
| Pennwalt Corporation, Tacoma, Class II Inspection. | 79-e18 | September 1979 |
| Hylebos Waterway Water Quality Survey, June 11, 1979. Memo to Jim Oberlander. | 79-e01 | August 1979 |
| Follow-up Survey on Boise Creek (after removal of Enumclaw STP discharge). Memo to Dave Nunnallee. | 79-e10 | July 1979 |
| ASARCO Class II Survey. Memo to Rick Pierce. | 79-e08 | April 1979 |
| Crown Zellerbach Pulp Mill Class II Inspection. Memo to Fred Fleske. | 78-e09 | June 1978 |
| Weyerhaeuser Sawmill Class II Inspection. Memo to Ron Devitt. | 78-e25 | May 1978 |
| Standard Brands Class II. Memo to Frank Monahan. | 78-e35 | May 1978 |
| The Impact of Enumclaw Trickling Filter Effluent on Boise Creek (March 21, 22, 1978.) Memo to Ron Devitt. | 78-e32 | April 1978 |
| Enumclaw STP Class II Inspection. Memo to Ron Devitt. | 78-e24 | April 1978 |
| Flow Measurement at Crystal Mountain STP, Pierce County. Memo to Jim Oberlander. | 78-e26 | 1978 |
| Sumner STP Class II Inspection. Memo to Ron Robinson. | 78-e36 | 1978 |
| Puyallup STP Class II Inspection. Memo to Ron Robinson May 4, 1977. | 77-e15 | May 1977 |
| Ground-Water Conditions in the Area of Swan Creek, Pierce County | OFTR 77-08 | March 1977 |
| Puyallup STP Class II Inspection. Memo to Ron Robinson May 13, 1976. | 76-e12 | May 1976 |
| Cherrywood Mobile Manor STP Class Inspection. Memo to Ron Robinson. | 76-e06 | May 1976 |
| North End Sewage Treatment Plant (Tacoma) Class II Survey. Memo to Ron Pine. | 75-e23 | December 1975 |
| Survey at St. Regis Paper in Tacoma. Memo to Mike Knudson. | 74-e59 | June 1974 |
| Survey at Kaiser Aluminum in Tacoma. Memo to Mike Knudson. | 74-e43 | June 1974 |
| Tacoma Narrows STP Efficiency Study. Memo to Mike Price and Ron Robinson. | 74-e12 | March 1974 |
| Compliance Monitoring of the Fibreboard Corporation at Sumner. Memo to Jim Knudson. | 74-e60 | February 1974 |
| Comments on Report "Subtidal Sludge Deposit Survey." Memo to Jim Knudson. | 74-e80 | 1974 |
| Ruston STP Efficiency Study. Memo to Mike Pierce. | 73-e75 | October 1973 |
| Efficiency Study at Tacoma General STP #1. Memo to Mike Price. | 73-e76 | October 1973 |
| Cherrybrook Mobil Home STP. Memo to Ron Robinson, Mike Price, Ron Devitt, and Ron Pine. | 73-e06 | October 1973 |
| A.I.W. Survey, Weyerhaeuser Company - White River Operations near Enumclaw. B. Water Quality of Boise Creek. Memo to Bill Burwell. | 72-e14 | September 1973 |
| Puyallup Sewage Treatment Plant. Memo to Ron Robinson. | 73-e20 | September 1973 |
| Orting Sewage Lagoon Study. Memo to Ron Robinson and Mike Price. | 73-e21 | August 1973 |
| Carbonado STP Survey. Memo to Mike Price. | 73-e60 | February 1973 |
| Wilkeson STP Efficiency Study. Memo to Mike Price. | 73-e64 | February 1973 |
| Rainier State School, STP Efficiency Study. Memo to Mike Price. | 72-e13 | December 1972 |
| St. Regis, Tacoma - Clarifier Efficiency. Memo to Jim Knudson. | 72-e10 | September 1972 |
| Boise Creek Survey. Memo to S.A. Messman. | 72-e11 | August 1972 |
| Enumclaw STP. Memo to Stew Messman. | 72-e12 | July 1972 |
| Monitor on Puyallup River. Memo to Gene Asselstine. | 72-e00 | 1972 |
| Boise Creek Survey. Memo to S.A. Messman. | 71-e04 | December 1971 |