WRIA 57, Middle spokane

This list updated October 01, 2009

Title (link to summary) Number      Date (released or updated)
Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report -- DRAFT07-10-073September 2009
Frequently Asked Questions: Solving Spokane River′s Dissolved Oxygen Shortage08-10-028September 2009
Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Implementation Plan09-10-039July 2009
PBT Trend Monitoring: Lead in Suspended Particulate Matter, 200809-03-020May 2009
Quality Assurance Project Plan: PBDE Flame Retardants in Spokane River Fish Tissues and Osprey Eggs09-03-108April 2009
2008 Report to the Legislature - Progress on Watershed Planning and Setting Instream Flows08-06-027December 2008
Focus on Water Resources in the Middle Spokane Watershed (WRIA 57)08-11-045October 2008
Frequently Asked Questions: Avista Dam Re-licensing and the Environment08-10-029April 2008
Washington State Toxics Monitoring Program: Contaminants in Fish Tissue from Freshwater Environments in 200608-03-002February 2008
Spokane River PCB TMDL Stormwater Loading Analysis: Final Technical Report07-03-055December 2007
Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Improvement Report06-10-045November 2007
Measuring Mercury Trends in Freshwater Fish in Washington State: 2006 Sampling Results07-03-043September 2007
Frequently Asked Questions about Spokane River′s dissolved oxygen shortage07-10-078September 2007
Hydrogeologic Framework and Water Budget of the Spokane Valley-Rathdrum Prairie Aquifer, Spokane County, Washington and Bonner and Kootenai Counties, Idaho07-11-027May 2007
Measuring Mercury Trends in Freshwater Fish in Washington State: 2005 Sampling Results07-03-007February 2007
PCBs, PBDEs, and Selected Metals in Spokane River Fish, 200506-03-025August 2006
Spokane River PCBs Total Maximum Daily Load Study (DRAFT report)06-03-024June 2006
Frequently Asked Questions about Spokane River PCBs Study06-10-043June 2006
Focus on Spokane River Studies06-10-046June 2006
Frequently Asked Questions about PBDEs and Dioxins/Furans in the Spokane River06-10-048June 2006
Spokane River Temperature Profile, Barker Road to Plantes Ferry Park, September 200506-11-005February 2006
Quality Assurance Project Plan: PCBs and Other Contaminants in Spokane River Fish, 200505-03-120December 2005
Progress on Watershed Planning and Setting Instream Flows05-11-038December 2005
Assessment of Total Dissolved Gas in the Spokane River at Upriver and Little Falls Dams05-03-010July 2005
Frequently Asked Questions about Protecting Oxygen in the Spokane River05-10-036March 2005
Assessment of Changes in Water Quality in the Spokane River Between Riverside State Park and the Washington-Idaho Border04-03-007April 2004
Spokane River and Lake Spokane (Long Lake) Pollutant Loading Assessment for Protecting Dissolved Oxygen04-03-006February 2004
Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River03-03-107October 2003
Mercury in Edible Fish Tissue and Sediments from Selected Lakes and Rivers of Washington State03-03-026June 2003
Quality Assurance Project Plan: Spokane River Total Dissolved Gas Total Maximum Daily Load Evaluation03-03-102March 2003
Washington State Toxics Monitoring Program: Toxic Contaminants in Fish Tissue and Surface Water in Freshwater Environments, 200103-03-012March 2003
Quality Assurance Project Plan: Screening Survey of Mercury Levels in Edible Fish Tissue from Selected Lakes and Rivers of Washington State02-03-080October 2002
Upriver Dam PCB Sediments Site02-09-073October 2002
EL SITIO DE LA PRESA RÍO ARRIBA CON SEDIMENTO CONTAMINADO CON PCBs (Proyecto sobre la Contaminación de PCBs del Río Spokane)02-09-073ESOctober 2002
Tug Upriver Dam - COV PCB KWS TOG RUA HUV QAAB THU DLEJ02-09-073hmOctober 2002
Проект Очищения Реки Спокен от МХДФ02-09-073ruOctober 2002
UPRIVER DAM NƠI BÙN CÁT BỊ NHIỄM CHẤT ÐỘC PCB Kế hoạch Chất Nhiễm Ðộc PCB ở Sông02-09-073viOctober 2002
Health Advisory for Spokane River Fish Consumption02-09-076October 2002
Un Aviso de Salud sobre La Consumición de Pescado Del Río Spokane (inglés: Spokane River)02-09-076ESOctober 2002
Tshaaj tawm txug kev mobnkeeg vim noj cov ntseg huv tug dlej Spokane River02-09-076hmOctober 2002
Health Advisory for Spokane River Fish Consumption (Russian)02-09-076ruOctober 2002
UPRIVER DAM NƠI BÙN CÁT BỊ NHIỄM CHẤT ÐỘC - PCB - Dự Án Ðối Phó Chất Nhiễm Ðộc PCB ở - Sông Spokane (Spokane River PCB Contamination Project)02-09-076viOctober 2002
Results and Recommendations from Monitoring Arsenic Levels in 303(d) Listed Rivers in Washington02-03-045October 2002
Spokane Area Point Source PCB Survey, May 200102-03-009March 2002
River and Stream Ambient Monitoring Report for Water Year 200001-03-042December 2001
Chemical Analysis and Toxicity Testing of Spokane River Sediments Collected in October 200001-03-019July 2001
Spokane River/Aquifer Interaction Project Results, May - November 199901-03-024July 2001
An Ecological Hazard Assessment for PCBs in the Spokane River01-03-015April 2001
Spokane River PCB and Source Survey, August 200001-03-016April 2001
Water Quality Assessments of Selected Lakes within Washington State: 199800-03-039December 2000
Results from Analyzing PCBs in 1999 Spokane River Fish and Crayfish Samples00-03-040September 2000
Reconnaissance Survey on Metals, Semivolatiles, and PCBs in Sediment Deposits Behind Upriver Dam, Spokane River00-03-021June 2000
Water Quality Assessments of Selected Lakes within Washington State: 199700-03-009March 2000
Results from Analyzing Metals in 1999 Spokane River Fish and Crayfish Samples00-03-017February 2000
Metals Concentrations in Spokane River Sediments Collected with USGS in 199899-330August 1999
River and Stream Ambient Monitoring Report for Water Year 199799-332August 1999
Aquatic Plants Technical Assistance Program 1998 Activity Report99-328June 1999
Cadmium, Lead, and Zinc in the Spokane River Recommendations for TMDL and Waste Load Allocations98-329September 1998
River and Stream Ambient Monitoring Report for Wateryear 199698-317June 1998
Metal Concentrations in the Spokane River During Spring 1997. Memo to J. Manning and C. Nuechterlein, August 26, 1997.97-e02August 1997
Argonne Road Ground Water Characterization of Organic Solvents November 1995 & May 199696-354December 1996
River and Stream Ambient Monitoring Report for Wateryear 199596-355December 1996
Spokane River PCB Source Monitoring Follow-up Study November and December 199596-331July 1996
Washington State Pesticide Monitoring Program: 1993 Fish Tissue Sampling Report95-356October 1995
River and Stream Ambient Monitoring Report for Wateryear 199495-349September 1995
Metals Concentrations in Rivers and Streams Dropped from the 1994 Section 303(d) List95-352September 1995
Bioassays of Spokane River Sediments (Final).95-e19February 1995
Department of Ecology 1993-94 Investigation of PCBs in the Spokane River95-310February 1995
1994 Statewide Water Quality Assessment Lakes Chapter - Companion Document to WA State 305(b)95-311February 1995
Corrections to Ecology Report 94-100, "Spokane River Basin Class II Inspection at the Spokane River Industrial Park Wastewater Treatment Plant."95-e021995
Dissolved Oxygen in the Spokane River Downstream from Inland Empire Paper Company with Recommendations for Waste Load Allocations for Biochemical Oxygen Demand94-155September 1994
River and Stream Ambient Monitoring Report for Wateryear 199394-158September 1994
Results of 1993 Screening Survey on PCBs and Metals in the Spokane River94-e24July 1994
1994 Spokane River Survey - Fish Tissue and Sediment Sampling Plan.94-e05July 1994
Spokane River Basin Class II Inspection at Kaiser Aluminum Corp at Trentwood Wastewater Treatment Plant94-122July 1994
Planar PCBs in Spokane River Fish. Memo to Carl Nuechterlein, ERO.94-e23May 1994
Freshwater Ambient Monitoring Report for Wateryear 199294-70May 1994
Spokane River Basin Class II Inspection at the Liberty Lake Wastewater Treatment Plant94-55April 1994
Spokane River Basin Class II Inspection at the Spokane Industrial Park Wastewater Treatment Plant94-1001994
Spokane Industrial Park Class II Inspection, May 18-20, 199293-e27March 1993
Lake Water Quality Assessment Project, 199092-1241993
Inland Empire Paper Company Class II Inspection, September 199091-e10December 1992
Inland Empire Paper Company Mixing Zone Survey, September 199092-e40February 1992
The Changing Spokane River Watershed: Actions to Improve and Maintain Water Quality. (Chapter in a book.)92-e601992
Lake Water Quality Assessment Project, 198991-60November 1991
Kaiser Aluminum and Chemical Corporation-Trentwood, Class II Inspection. Memo to Roger Ray and Patrick Hallinan, November 8, 1991.91-e13November 1991
The Spokane River Basin: Allowable Phosphorus Loading87-e29September 1987
Tabulation of Data Collected During Class II Facility Inspection Performed at Inland Empire Paper Company, August 28-30, 1984. Memo to Roger Ray.87-e00February 1987
Phosphorus Attenuation in the Spokane River85-e28June 1985
Spokane Industrial Park Receiving Water Study. Memo to Roger Ray.84-e00May 1984
Liberty Lake Sewer District Sewage Treatment Plant Class II Inspection, August 30-31, 198384-e47March 1984
Liberty Lake WTP Receiving Water Study. Memo to Roger Ray.84-e01February 1984
Spokane Industrial Park Class II Inspection; August 29-30, 1983. Memo to Roger Ray.84-e46February 1984
Baseline Study to Determine the Water Quality and the Primary and Secondary Producers of the Spokane River, Phase 184-e061984
Setting Effluent Ammonia Limits to Meet In-stream Toxicity Criteria. Article in Journal Water Pollution Control Federation, March 1983, p. 303-309.83-e47March 1983
Water Quality of the Upper Spokane River and Evaluation of Methods for Measurements of the Effect of Effluent upon Primary and Secondary Producers83-e111983
Fishery Assessment of the Upper Spokane River82-e01June 1982
Spokane River Data82-e35May 1982
Spokane River Wasteload Allocation Study, Supplemental Report for Phosphorus Allocation81-15September 1981
Spokane River Wasteload Allocation Study, Phase I81-e27April 1981
Inland Empire Paper Co. - Class II Inspection. Memo.78-e22April 1978
Kaiser Aluminum - Trentwood, Class II Inspection. Memo to Dick Cunningham.77-e28December 1977
Kaiser (Trent Wood) Class II Inspection. Memo to Phil Williams.76-e16September 1976
Spokane STP Bypass October 6-9, 1975. Memo to Rhys Sterling.77-e27October 1975
Spokane River Temperature Study. Memo to Rhys Sterling.75-e62October 1975
Millwood STP Survey. Memo to Howard Bunten.74-e32August 1974
Kaiser Aluminum Survey of January 30, 1974. Memo to Rhys Sterling.74-e54June 1974
Survey at Centennial Mills In Spokane. Memo to Rhys Sterling.74-e56April 1974
Efficiency Survey Conducted on Bridgeport STP. Memo to John Arnquist and Rhys Sterling.74-e34April 1974
Becwar Packing Company. Memo to Rhys Sterling.74-e48April 1974
Columbia Lighting, Spokane Industrial Park. Memo to Rhys Sterling and Howard Bunten.74-e50April 1974
Efficiency Study at Spokane Industrial Park. Memo to Rhys Sterling and Howard Bunten.74-e47April 1974
Hygrade Food Products. Memo to Rhys Sterling.74-e51April 1974
Liberty Lake Sewage Treatment Plant. Memo to Howard Bunten.74-e06February 1974
Inland Empire Paper Company, Spokane. Memo to Mike Palko and Tom Haggerty.71-e28December 1971
Division Street Storm Drain Project. Memo to Warren Myers.71-e17April 1971
Eutrophication: Liberty Lake and Silver Lake Complaints. Memo to Tom Haggerty.70-e14October 1970
Liberty Lake - Point Discharge Complaint. Memo to Dan Neal.69-e07November 1969

Last updated October 01, 2009