January 10th, 2007 Permit Register Entries

 

Agency: Ecology-Central Regional Office (CRO)
Agency Contact: Lynnette Haller
Permit Type: Air Operating Permit
Other Permit: & Phase II Acid Rain Renewal
Codes: IF - Issuance of a final permit
Permit Applicant: Goldendale Energy Center
Physical Address: 600 Industrial Way, Goldendale, WA
Physical Address Zip: 98620
Mail Address: PO Box 190, Goldendale , WA
Zip Code: 98620
Facility Description: 248 MW combined cycle naural gas-fired electrical generation facility. Permit online at: http://www.ecy.wa.gov/programs/air/AOP_Permits/CRO_Permit/cro_aop_permits.htm
ACTUAL: 2005
Total Particulates TPY: 8.1
CO TPY: 1.1
NOX TPY: 35.2
SO2 TPY: 2.1
PM10 TPY: 8.1
VOCs TPY: 1.7
Other TPY: Ammonia
Other Pol1utant TPY: 3.8
Comment Period:  
Comment Contact:  
Public Hearing:  
Date_Time:  
Location:  
Modification:  
Date_Determination: 1/5/07
Contact: Lynnette Haller
Email: lhul461@ecy.wa.gov

 

Agency: Spokane County Air Pollution Control Authority (SCAPCA)
Agency Contact: April Westby
Permit Type: Air Operating Permit
Other Permit:  
Codes: IM - Issuance of modifications to final permit
Permit Applicant: Melcher Manufacturing
Physical Address: 6017 E. Mission Ave., Spokane, WA
Physical Address Zip: 99212
Mail Address: P.O. Box 11857
Zip Code: 99211-1857
Facility Description: Manufacturer of Fiberglass Loading Ramps
ACTUAL: 2005
Total Particulates TPY: 0.63
CO TPY:  
NOX TPY:  
SO2 TPY:  
PM10 TPY:  
VOCs TPY: 8.53
Other TPY: Select Pollutant
Other Pol1utant TPY:  
Comment Period:  
Comment Contact:  
Public Hearing:  
Date_Time:  
Location:  
Modification: Revised permit incorporates several requirements from 40 CFR 63, Subpart WWWW that were inadvertently left out of the original permit. In addition, the fiberglass loading ramp manufacturing operation, located at 5318 E. Desmet, which was formerly used for manufacturing fiberglass tubs, was added to Melcher's permit.
Date_Determination: 1/5/07
Contact: April Westby
Email: alwestby@scapca.org