| Agency: | Ecology-NUCLEAR WASTE PROGRAM |
| Agency Contact: | Oliver Wang |
| Permit Type: | Air Operating Permit |
| Other Permit: | Significant Modification |
| Codes: | DQ - Issuance of a draft permit modification |
| Permit Applicant: | Environmental Assessment Services (EAS) |
| Physical Address: | 350 Hills Street., Richland, Washington |
| Physical Address Zip: | 99354 |
| Mail Address: | |
| Zip Code: | |
| Facility Description: | EAS, an off-site support facility, prepares water, soil, and biota samples for the U.S. Department of Energy's Hanford Site. |
| ACTUAL: | 2006 |
| Total Particulates TPY: | 7 |
| CO TPY: | 16 |
| NOX TPY: | 14 |
| SO2 TPY: | 4 |
| PM10 TPY: | 4 |
| VOCs TPY: | 15 |
| Other TPY: | Not Listed - See Box to Right |
| Other Pollutant TPY: | Radioactive 0.068 mrem EDE |
| Comment Period: | 4/28/2008 - 5/28/2008 |
| Comment Contact: | Madeleine Brown |
| Public Hearing: | None |
| Date_Time: | N/A |
| Location: | N/A |
| Modification: | As an off-site support facility, EAS's operation qualifies as a significant modification to U.S. Department of Energy's Hanford Air Operating Permit 00-05-006. |
| Date_Determination: | 3/20/2008 |
| Contact: | Oliver Wang |
| Email: | owan461@ecy.wa.gov |
| Agency: | Ecology-Eastern Regional Office (ERO) |
| Agency Contact: | David Wendland (509)329-3594 |
| Permit Type: | Air Operating Permit |
| Other Permit: | |
| Codes: | DP - Issuance of a draft permit/renewal |
| Permit Applicant: | Gas Transmission Northwest Corp. Compressor Sta 8 |
| Physical Address: | 638 Lambdin Road, 3 miles east of Wallula Junction on U.S. Hiway 12. Near Wallula WA. |
| Physical Address Zip: | 99360 |
| Mail Address: | 534 E. Spokane Falls Blvd., Ste100, Spokane, WA |
| Zip Code: | 99202 |
| Facility Description: | Natural Gas pipeline compressor station. Three natural gas-fired turbine/compressor units, one emergency generator. |
| ACTUAL: | 2006 |
| Total Particulates TPY: | 3.2 |
| CO TPY: | 190 |
| NOX TPY: | 100 |
| SO2 TPY: | 2 |
| PM10 TPY: | 3 |
| VOCs TPY: | 10 |
| Other TPY: | Select Pollutant |
| Other Pollutant TPY: | |
| Comment Period: | 4/16/08 - 5/16/08 |
| Comment Contact: | |
| Public Hearing: | |
| Date_Time: | |
| Location: | |
| Modification: | |
| Date_Determination: | 4/9/08 |
| Contact: | |
| Email: | dwen461@ecy.wa.gov |
| Agency: | Ecology-Central Regional Office (CRO) |
| Agency Contact: | David Ogulei |
| Permit Type: | Air Operating Permit |
| Other Permit: | |
| Codes: | DP - Issuance of a draft permit/renewal |
| Permit Applicant: | SDS Lumber Company |
| Physical Address: | Walnut and Steuben Street, Bingen, Washington |
| Physical Address Zip: | 98605 |
| Mail Address: | PO Box 266, Bingen, WA |
| Zip Code: | 98605 |
| Facility Description: | SDS Lumber Company manufactures studs, dimensional lumber, plywood, and wood chips. The source consists of a hog fuel boiler, veneer dryers, drying kilns, stud mills, a band mill, a wood chipper, miscellaneous wood processing equipment, and multiple emission control devices (including baghouses, cyclones, wet electrostatic precipitator, dry electrostatic precipitator). The overall production process includes four major process steps, namely; log preparation, plywood/veneer production, stud mills for dimensional lumber production, and steam production for heat and electricity. |
| ACTUAL: | 2006 |
| Total Particulates TPY: | 119.5 |
| CO TPY: | 252.85 |
| NOX TPY: | 65.73 |
| SO2 TPY: | 8.70 |
| PM10 TPY: | 57.17 |
| VOCs TPY: | 27.22 |
| Other TPY: | Not Listed - See Box to Right |
| Other Pollutant TPY: | PM2.5 - 32.55 TPY |
| Comment Period: | Ends May 10, 2008 |
| Comment Contact: | David Ogulei |
| Agency: | Southwest Clean Air Agency (SWCAA) |
| Agency Contact: | Clint Lamoreaux |
| Permit Type: | Air Operating Permit |
| Other Permit: | |
| Codes: | IF - Issuance of a final permit |
| Permit Applicant: | TransAlta Centralia Generation, LLC |
| Physical Address: | 913 Big Hanaford Road, Centralia, WA |
| Physical Address Zip: | 98531 |
| Mail Address: | |
| Zip Code: | |
| Facility Description: | Power plant consisting primarily of two coal-fired boilers and four natural gas-fired combustion turbines |
| ACTUAL: | 2006 |
| Total Particulates TPY: | 733 |
| CO TPY: | 1910 |
| NOX TPY: | 9708 |
| SO2 TPY: | 1691 |
| PM10 TPY: | 560 |
| VOCs TPY: | 61 |
| Other TPY: | Select Pollutant |
| Other Pollutant TPY: | |
| Comment Period: | |
| Comment Contact: | |
| Public Hearing: | |
| Date_Time: | |
| Location: | |
| Modification: | |
| Date_Determination: | 3/25/08 |
| Contact: | Clint Lamoreaux |
| Email: | clint@swcleanair.org |
| Agency: | Ecology-Central Regional Office (CRO) |
| Agency Contact: | Lynnette Haller |
| Permit Type: | Air Operating Permit |
| Other Permit: | |
| Codes: | IM - Issuance of modifications to final permit |
| Permit Applicant: | PUD No. 1 of Klickitat County |
| Physical Address: | 502 Roosevelt Grade Road, Roosevelt, WA |
| Physical Address Zip: | 99356 |
| Mail Address: | 1313 South Columbus Avenue, Goldendale, WA |
| Zip Code: | 98620 |
| Facility Description: | H.W. Hill Landfill Gas Power Plant - 10.5 megawatt landfill gas-to-energy plant |
| ACTUAL: | 2006 |
| Total Particulates TPY: | 5 |
| CO TPY: | 191 |
| NOX TPY: | 49 |
| SO2 TPY: | 9 |
| PM10 TPY: | 5 |
| VOCs TPY: | 7 |
| Other TPY: | Select Pollutant |
| Other Pollutant TPY: | |
| Comment Period: | |
| Comment Contact: | |
| Public Hearing: | |
| Date_Time: | |
| Location: | |
| Modification: | Update responsible official |
| Date_Determination: | 3/25/08 |
| Contact: | Lynnette Haller |
| Email: | lhul461@ecy.wa.gov |
| Agency: | Ecology-Central Regional Office (CRO) |
| Agency Contact: | Lynnette Haller |
| Permit Type: | Air Operating Permit |
| Other Permit: | Renewal |
| Codes: | AC - Receipt of a complete permit application |
| Permit Applicant: | Greater Wenatchee Regional Landfill & Recycling Center |
| Physical Address: | 191 Webb Road, East Wenatchee, WA |
| Physical Address Zip: | 98807 |
| Mail Address: | PO Box 2963, Wenatchee, WA |
| Zip Code: | 98807 |
| Facility Description: | MSW Landfill & Recycling Center |
| ACTUAL: | 2006 |
| Total Particulates TPY: | 35 |
| CO TPY: | 2 |
| NOX TPY: | 3 |
| SO2 TPY: | 1 |
| PM10 TPY: | 9 |
| VOCs TPY: | 5 |
| Other TPY: | Select Pollutant |
| Other Pollutant TPY: | |
| Comment Period: | |
| Comment Contact: | |
| Public Hearing: | |
| Date_Time: | |
| Location: | |
| Modification: | |
| Date_Determination: | 3/11/08 |
| Contact: | Lynnette Haller |
| Email: | lhul461@ecy.wa.gov |