|
Agency: |
Southwest Clean Air Agency (SWCAA) |
|
Agency Contact: |
Natalia Kreitzer |
|
Permit Type: |
Air Operating Permit |
|
Other Permit: |
|
|
Codes: |
DP - Issuance of a draft permit/renewal |
|
Permit Applicant: |
Northwest Pipeline GP - Washougal Compressor Station |
|
Physical Address: |
1309 NE Brown Road, Washougal WA |
|
Physical Address Zip: |
98671 |
|
Mail Address: |
PO Box 58900, Salt Lake City, UT |
|
Zip Code: |
84158 |
|
Facility Description: |
The Washougal Compressor Station is one of several unmanned stations that Northwest Pipeline GP (NW Pipeline) has located approximately every 50 miles along its natural gas pipeline system that spans from the Canadian border near Sumas, Washington to the San Juan Gas Fields in New Mexico. The Washougal Compressor Station takes natural gas from the pipeline and increases the pressure in the pipeline to increase natural gas throughput. |
|
ACTUAL: |
2008 |
|
Total Particulates TPY: |
2.82 |
|
CO TPY: |
16.06 |
|
NOX TPY: |
50.84 |
|
SO2 TPY: |
0.04 |
|
PM10 TPY: |
2.82 |
|
VOCs TPY: |
7.78 |
|
Other TPY: |
Select Pollutant |
|
Other Pollutant TPY: |
|
|
Comment Period: |
30 days |
|
Comment Contact: |
|
|
Public Hearing: |
|
|
Date_Time: |
|
|
Location: |
|
|
Modification: |
SWCAA is issuing an administrative amendment draft AOP for Northwest Pipeline's Washougal Compressor Station to incorporate the requirements in Air Discharge Permit (ADP) 05-2596 |
|
Date_Determination: |
October 14, 2009 |
|
Contact: |
Natalia Kreitzer |
|
Email: |
|
Agency: |
Southwest Clean Air Agency (SWCAA) |
|
Agency Contact: |
Natalia Kreitzer |
|
Permit Type: |
Air Operating Permit |
|
Other Permit: |
|
|
Codes: |
DP - Issuance of a draft permit/renewal |
|
Permit Applicant: |
Northwest Pipeline GP - Chehalis Compressor Station |
|
Physical Address: |
156 Meier Road West, Winlock WA |
|
Physical Address Zip: |
98596 |
|
Mail Address: |
PO Box 58900, Salt Lake City, UT |
|
Zip Code: |
84158 |
|
Facility Description: |
The Chehalis Compressor Station is one of several unmanned stations that Northwest Pipeline GP (NW Pipeline) has located approximately every 50 miles along its natural gas pipeline system that spans from the Canadian border near Sumas, Washington to the San Juan Gas Fields in New Mexico. The Chehalis Compressor Station takes natural gas from the pipeline and increases the pressure in the pipeline to increase natural gas throughput. |
|
ACTUAL: |
2008 |
|
Total Particulates TPY: |
0.03 |
|
CO TPY: |
0.57 |
|
NOX TPY: |
0.61 |
|
SO2 TPY: |
0.00 |
|
PM10 TPY: |
0.03 |
|
VOCs TPY: |
0.03 |
|
Other TPY: |
Select Pollutant |
|
Other Pollutant TPY: |
|
|
Comment Period: |
30 days |
|
Comment Contact: |
|
|
Public Hearing: |
|
|
Date_Time: |
|
|
Location: |
|
|
Modification: |
SWCAA is issuing an administrative amendment draft AOP to Northwest Pipeline's Chehalis Compressor Station to incorporate the requirements in Air Discharge Permit 05-2650 |
|
Date_Determination: |
October 14, 2009 |
|
Contact: |
Natalia Kreitzer |
|
Email: |