October 25, 2009 Permit Register Entries

Agency:

Southwest Clean Air Agency (SWCAA)

Agency Contact:

Natalia Kreitzer

Permit Type:

Air Operating Permit

Other Permit:

 

Codes:

DP - Issuance of a draft permit/renewal

Permit Applicant:

Northwest Pipeline GP - Washougal Compressor Station

Physical Address:

1309 NE Brown Road, Washougal WA

Physical Address Zip:

98671

Mail Address:

PO Box 58900, Salt Lake City, UT

Zip Code:

84158

Facility Description:

The Washougal Compressor Station is one of several unmanned stations that Northwest Pipeline GP (NW Pipeline) has located approximately every 50 miles along its natural gas pipeline system that spans from the Canadian border near Sumas, Washington to the San Juan Gas Fields in New Mexico. The Washougal Compressor Station takes natural gas from the pipeline and increases the pressure in the pipeline to increase natural gas throughput.

ACTUAL:

2008

Total Particulates TPY:

2.82

CO TPY:

16.06

NOX TPY:

50.84

SO2 TPY:

0.04

PM10 TPY:

2.82

VOCs TPY:

7.78

Other TPY:

Select Pollutant

Other Pollutant TPY:

 

Comment Period:

30 days

Comment Contact:

 

Public Hearing:

 

Date_Time:

 

Location:

 

Modification:

SWCAA is issuing an administrative amendment draft AOP for Northwest Pipeline's Washougal Compressor Station to incorporate the requirements in Air Discharge Permit (ADP) 05-2596

Date_Determination:

October 14, 2009

Contact:

Natalia Kreitzer

Email:

natalia@swcleanair.org

 

Agency:

Southwest Clean Air Agency (SWCAA)

Agency Contact:

Natalia Kreitzer

Permit Type:

Air Operating Permit

Other Permit:

 

Codes:

DP - Issuance of a draft permit/renewal

Permit Applicant:

Northwest Pipeline GP - Chehalis Compressor Station

Physical Address:

156 Meier Road West, Winlock WA

Physical Address Zip:

98596

Mail Address:

PO Box 58900, Salt Lake City, UT

Zip Code:

84158

Facility Description:

The Chehalis Compressor Station is one of several unmanned stations that Northwest Pipeline GP (NW Pipeline) has located approximately every 50 miles along its natural gas pipeline system that spans from the Canadian border near Sumas, Washington to the San Juan Gas Fields in New Mexico. The Chehalis Compressor Station takes natural gas from the pipeline and increases the pressure in the pipeline to increase natural gas throughput.

ACTUAL:

2008

Total Particulates TPY:

0.03

CO TPY:

0.57

NOX TPY:

0.61

SO2 TPY:

0.00

PM10 TPY:

0.03

VOCs TPY:

0.03

Other TPY:

Select Pollutant

Other Pollutant TPY:

 

Comment Period:

30 days

Comment Contact:

 

Public Hearing:

 

Date_Time:

 

Location:

 

Modification:

SWCAA is issuing an administrative amendment draft AOP to Northwest Pipeline's Chehalis Compressor Station to incorporate the requirements in Air Discharge Permit 05-2650

Date_Determination:

October 14, 2009

Contact:

Natalia Kreitzer

Email:

natalia@swcleanair.org