May 10, 2010 Permit Register Entries

Air Operating Permit Draft Workload Analysis & Budget For FY12/13 Biennium

In accordance with WAC 173-401-900, the draft workload analysis has been published on Ecology’s website at http://www.ecy.wa.gov/programs/air/permit_register/Draft_WLM_1213.pdf. This workload analysis projects Ecology’s resource requirements for administration, development and oversight of Washington’s Air Operating Permit program for the biennium including fiscal year 2012 and 2013.  Comments may be submitted through July 10, 2010. Please submit comments to Crystal Alford at Crystal.Alford@ecy.wa.gov.

 

Agency:

Northwest Clean Air Agency (NWCAA)

Agency Contact:

Dan Mahar

Permit Type:

Air Operating Permit

Other Permit:

Initial

Codes:

AC - Receipt of a complete permit application

Permit Applicant:

PSE Sumas Generating Station

Physical Address:

1340 Thompson Lane, Sumas, Washington

Physical Address Zip:

98295

Mail Address:

PO Box 97034, PSE-04S, Bellevue, WA

Zip Code:

98009-9734

Facility Description:

Combined cycle, combustion turbine power plant.

ACTUAL:

2008

Total Particulates TPY:

0

CO TPY:

1

NOX TPY:

1

SO2 TPY:

0

PM10 TPY:

0

VOCs TPY:

1

Other TPY:

Select Pollutant

Other Pollutant TPY:

 

Comment Period:

 

Comment Contact:

 

Public Hearing:

 

Date_Time:

 

Location:

 

Modification:

 

Date_Determination:

9/4/09

Contact:

Dan Mahar

Email:

dan@nwcleanair.org

 

Agency:

Ecology-Eastern Regional Office (ERO)

Agency Contact:

David Wendland

Permit Type:

Air Operating Permit

Other Permit:

 

Codes:

IF - Issuance of a final permit

Permit Applicant:

Ponderay Newsprint Company

Physical Address:

422767 SR 20, Usk WA

Physical Address Zip:

99180-9771

Mail Address:

 

Zip Code:

 

Facility Description:

Newsprint manufacturing. Material handling, Thermomechanical pulping, paper machines, drying, Db boiler: Natural gas, Dc boiler: wood waste/WWT sludge.

ACTUAL:

2007

Total Particulates TPY:

4.2

CO TPY:

2.0

NOX TPY:

56

SO2 TPY:

14.1

PM10 TPY:

4.2

VOCs TPY:

137

Other TPY:

Not Listed - See Box to Right

Other Pollutant TPY:

methanol 30 tons

Comment Period:

 

Comment Contact:

 

Public Hearing:

 

Date_Time:

 

Location:

 

Modification:

 

Date_Determination:

4/22/2010

Contact:

 

Email:

david.wendland@ecy.wa.gov

 

Agency:

Ecology-INDUSTRIAL SECTION

Agency Contact:

Robert Carruthers

Permit Type:

Air Operating Permit

Other Permit:

 

Codes:

Select Permit Code

Permit Applicant:

Boise White Paper L.L.C.

Physical Address:

31831 West Highway, WA

Physical Address Zip:

99363

Mail Address:

PO Box 500 Wallula, WA

Zip Code:

99363

Facility Description:

The Wallula Mill is an integrated bleached Kraft pulp and paper mill, neutral sufjite semi-chemical (NSSC) pulping, corrugating medium and box plant. Primary products include but are not limited tomarket pulp, corrugating medium, fine white paper, label and release paper products and finished containerboard boxes.

ACTUAL:

2008

Total Particulates TPY:

121

CO TPY:

433

NOX TPY:

706

SO2 TPY:

758

PM10 TPY:

134

VOCs TPY:

1826

Other TPY:

Ammonia

Other Pollutant TPY:

25

Comment Period:

May 10 through June 10, 2010

Comment Contact:

Robert Carruthers

Public Hearing:

 

Date_Time:

 

Location:

 

Modification:

 

Date_Determination:

1/19/2010

Contact:

Robert Carruthers

Email:

roca461@ecy.wa.gov

 

Agency:

Southwest Clean Air Agency (SWCAA)

Agency Contact:

Wess Safford

Permit Type:

Notice of Construction

Other Permit:

 

Codes:

IF - Issuance of a final permit

Permit Applicant:

Mint Farm Generating Station - Longview

Physical Address:

1200 Prudential Blvd, Longview, WA

Physical Address Zip:

98632

Mail Address:

Same

Zip Code:

 

Facility Description:

Primary power generation facility configured with a single GE Frame 7FA combustion turbine, a fired heat recovery steam generator (HRSG), and associated support equipment. The facility has a combined electrical output capacity of 319 MW at annual average conditions (combustion turbine + steam turbine).

ACTUAL:

2009

Total Particulates TPY:

20.98

CO TPY:

1.94

NOX TPY:

41.72

SO2 TPY:

15.02

PM10 TPY:

20.98

VOCs TPY:

3.81

Other TPY:

Select Pollutant

Other Pollutant TPY:

 

Comment Period:

N/A

Comment Contact:

 

Public Hearing:

 

Date_Time:

 

Location:

 

Modification:

Modification of existing permit terms to clarify NOx emission trial requirements and better define startup/shutdown periods. Removal of fire pump emission unit.

Date_Determination:

4/29/10

Contact:

Wess Safford

Email:

wess@swcleanair.org