November 10, 2013 Permit Register Entries

 

 

Agency:

Ecology-INDUSTRIAL SECTION

Agency Contact:

Judy Schwieters

Permit Type:

Notice of Construction

Other Permit:

Codes:

AC - Receipt of a complete permit application

Permit Applicant:

Intalco Aluminum Smelter

Physical Address:

4050 Mountainview Road, Ferndale, WA

Physical Address Zip:

98248

Mail Address:

Zip Code:

Facility Description:

Alcoa Intalco Works is a primary aluminum smelter. It began operation in 1966 and employs approximately 612 people. Intalco can produce up to 307,000 tons per year of primary aluminum that is sold as billet, ingot, pig or sow.

ACTUAL:

2012

Total Particulates TPY:

736

CO TPY:

33435

NOX TPY:

184

SO2 TPY:

4723

PM10 TPY:

736

VOCs TPY:

289

Other TPY:

Select Pollutant

Other Pollutant TPY:

Comment Period:

Comment Contact:

Public Hearing:

Date_Time:

Location:

Modification:

Ecology intends to rescind NOC Order No. 8618 and issue new NOC Order No. 10346. The public may request a comment period on this action under WAC 173-400-171. If noone makes a request, Ecology will issue the permit. The new order includes the conditions and limits of Order No. 8618 and also allows Intalco to replace the firing control system for the anode baking furnaces in their bake oven. Intalco expects a 23% reduction in natural gas consumption and for NOx emissions to decrease. Find more information at http://www.ecy.wa.gov/programs/swfa/industrial/alum_intalco.html

Date_Determination:

8/16/2013

Contact:

Angie Fritz

Email:

angela.fritz@ecy.wa.gov

 

 

Agency:

Ecology-NUCLEAR WASTE PROGRAM

Agency Contact:

Philip Gent

Permit Type:

Air Operating Permit

Other Permit:

Revision A AOP 00-05-006

Codes:

DQ - Issuance of a draft permit modification

Permit Applicant:

United States Department of Energy

Physical Address:

825 Jadwin Ave, Richland, WA

Physical Address Zip:

99352

Mail Address:

Zip Code:

Facility Description:

DOE Hanford Site for nuclear waste storage, remediation, retrieval, and treatment

ACTUAL:

2010

Total Particulates TPY:

7

CO TPY:

16

NOX TPY:

14

SO2 TPY:

4

PM10 TPY:

4

VOCs TPY:

15

Other TPY:

Not Listed - See Box to Right

Other Pollutant TPY:

0.099 mrem EDE

Comment Period:

November 17 - December 20, 2013

Comment Contact:

Public Hearing:

Date_Time:

Location:

Modification:

Ecology is inviting comment on Revision A of the Hanford AOP. The revision incorporates new or modified underlying requirements. Comments submitted during the June 30 to August 2, 2013, public comment period are still valid and will be combined with comments received for this comment period and responded to concurrently.

Date_Determination:

Contact:

Philip Gent

Email:

pgen461@ecy.wa.gov