October 25, 2017 Permit Register Entries

 

The Air Operating Permit audit committee will meet on Mon., Nov. 6, 2017, from 10 a.m. to 11 a.m. to discuss performance audit recommendations.  The public is welcome to attend. 

 

Ecology allocates its permit administration costs and its share of development and oversight costs among the permit program sources for whom it acts as permitting authority.  These costs are distributed equally between three tiers:

 

Tier 1:  The number of sources under its jurisdiction.

Tier 2:  The complexity of the sources under its jurisdiction.

Tier 3:  The size of the sources under its jurisdiction, as measured by the quantity of each regulated pollutant (for fee calculation) emitted.

 

By October 31 of each year, Ecology must post the basis for the complexity level (Tier 2) determination.  For fiscal year 2018, Ecology will allocate complexity level costs to each source based on the hours of permit oversight provided to each source during the prior year.

 

For more information, email Ron Stuart.

 

 

Agency:

Ecology Industrial Section

Permit Type:

Air Operating Permit

Other Permit:

No. 0003697

Codes:

DP - Issuance of a draft permit/renewal

Permit Applicant:

Boise White Paper, L.L.C.

Physical Address:

13831 US Highway 12, Wallula WA

Physical Address Zip:

99363

Mail Address:

P.O. Box 500, Wallula WA

Zip Code:

99363

Facility Description:

The mill produces about 1400 tons of bleached paper, fine coated paper, and corrugated medium each day. The container plant produces about 5 million square feet of corrugated boxes each day.

ACTUAL:

2016

Total Particulates TPY:

148

CO TPY:

477

NOX TPY:

681

SO2 TPY:

692

PM10 TPY:

122

VOCs TPY:

749

Other TPY:

Ammonia

Other Pollutant TPY:

28

Comment Period:

October 27 - November 30, 2017

Comment Contact:

Angie Fritz, angela.fritz@ecy.wa.gov, (360) 407-7393

Public Hearing:

Date_Time:

Location:

Modification:

Date_Determination:

Contact:

Robert Carruthers

Email:

robert.carruthers@ecy.wa.gov