Ecology's Lake Restoration Program

(Excerpt from "1994 Statewide Water Quality Assessment Report-Lakes Chapter" by J. Rector and D. Hallock; Updated April, 1997.)

Washington has coordinated a lake restoration program since 1976. The passage of Referendum 26 in 1972 and Referendum 39 in 1980 provided over $25 million of state funding for lake water quality improvement projects. With the passage of the Centennial Clean Water Fund (CCWF) legislation in 1986, additional lake funding was assured through 1993. In 1994, special categories (including the lakes category) were eliminated, leaving only the activities and facilities categories. Currently, Phase I projects compete for funding under the activities category, and Phase II projects compete either in the activities or the facilities category.

Washington's lake restoration program parallels the federal Clean Water Act Section 314 Clean Lakes Program. All projects are initiated at the grass roots level, and a public entity must serve as the local sponsor and provide at least 25% of the total project cost. Projects have been funded with state agencies, Indian tribes, municipalities, and county governments. Lake restoration projects at 45 lakes have been funded by Ecology since the funding program began. Lake restoration projects at 18 lakes have been funded through the federal Clean Lakes Program.


STATE FUNDED LAKE RESTORATION PROJECTS.
_________________________________________________________________________________________________________________
Lake (County)		Reference						Project Status (Completion Date)
_________________________________________________________________________________________________________________
Beaver (King)		Beaver Lake Management Plan (Entranco, 1993)		Phase I (1994); Phase II Active
Big (Skagit)		Big Lake Restoration Study Final Report			Completed (1978)
			(URS Company, 1977)
Black (Thurston)								Phase I grant declined 1994
Blackmans (Snohomish)	City of Snohomish Blackman Lake Phase I 		Phase I (1994)
			Restoration Study Final Report (KCM, Inc., 1994)
Capitol (Thurston)								Phase I (1984); Phase II (1988)
Carlisle (Lewis)	Lake Carlisle Restoration Phase II:  Water 		Phase I (1985); Phase II (1991)
			Quality Monitoring  (Moore, 1990)
Clear (Pierce)		Clear Lake Water Quality Assessment Project		Phase I (1994)
			Final Report (Tacoma-Pierce County Health 
			Department, 1994)
Cottage (King)									Phase I (1996)
Crabapple (Snohomish)	Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)
Curlew (Ferry)		A Study of the Water Quality of Curlew			Phase I (1989); Phase II (1994)
			Lake Washington (Juul, 1988)
Desire (King)									Phase I (1996)
Duck (Grays Harbor)	Duck Lake Phase I Restoration Study Final 		Phase I (1994); Phase II Active
			Report (KCM, Inc, 1994). Phase II: Federal 319 grant.
Eloika (Spokane)	Water Quality Assessment and Restoration 		Phase I (1989); Phase II Active
			Feasibility for Eloika Lake, WA (Soltero et al., 1987)
Goodwin (Snohomish)	Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)
Horseshoe (Clark)	Horseshoe Lake: Water Quality, Nutrient 		Phase I (1993); Phase II Active
			Loading, and Management (Welch et al., 1992)
Howard (Snohomish)	Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)
Ketchum (Snohomish)								Phase I (1997)
Ki (Snohomish)		Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)
Kitsap (Kitsap)		Kitsap Lake: A Restoration Analysis and 		Phase I (1983)
			Watershed Management Plan (Parametrix, Inc., 1983)
Lacamas (Clark)		Lacamas Lake Restoration Project, Restoration 		Phase I (1986); Phase II Active
			Plan (Intergovernmental Resource
			Center, 1988); Lacamas-Round Lake Diagnostic 
			and Restoration Analysis (Beak Consultants an
			Scientific Resources, Inc., 1985)
Larsen (King)		City of Bellevue Storm and Surface Water 		Phase I (1987); Phase II (1993)
			Utility Phantom/Larsen Lake Phase II Restoration
			Project Final Report (KCM, Inc., 1993)
Lawrence (Thurston)	Lake Lawrence Phase I Restoration Analysis		Phase I (1992); Phase II Active
			Final Report (KCM, Inc., 1991)
Loma (Snohomish)	Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)		
Lake Martha (Snohomish)	Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)		
Martha Lake (Snohomish)	Martha Lake Phase I Restoration Report			Phase I (1994)
			(Entranco, 1991)
Medical (Spokane)	Restoration of Medical Lake Final Report 		Phase I (1977); Phase II (1980)
			(Gasperino et al., 1980)		
Meridian (King)		A Study of the Trophic Status and Recommend-		Completed (1978)
			ations For the Management of Lake Meridian 
			(METRO, 1978)
Newman (Spokane)	Newman Lake Restoration Feasibility Study 		Phase I (1988); Phase II Active
			(Funk and Moore, 1988)		
Number Twelve (King)	Lake Twelve Management Plan Final Report		Phase I (1994)
			(Envirovision and KCM, Inc., 1994)				
Ohop (Pierce)									Phase I (Final due June 1997)
Phantom (King)		City of Bellevue Storm and Surface Water 		Phase I (1987); Phase II (1993)
			Utility Phantom/Larsen Lake Phase II Restoration
			Project Final Report (KCM, Inc., 1993)
Roesiger (Snohomish)	Lake Roesiger Phase I Restoration Analysis 		Phase I (1990); Phase II Active
			(KCM, Inc, 1989)
Sacheen (Pend Oreille)	Water Quality Assessment and Restoration		Phase I (1991); Phase II Active
			Alternatives for Sacheen Lake, Washington
			(Kennedy Engineers, 1991)
Sammamish (King)	Lake Sammamish Water Quality Management			Phase I (1991); Phase II Active
			Project Technical Report (Entranco, 1989)
Scriber (Snohomish)	Scriber Lake Restoration Diagnostic Feasibility		Phase I (1987); Phase II (1992)
			Study (URS Consultants, 1986)
Shoecraft (Snohomish)	Seven Lakes Water Quality Analysis and			Phase I (1986)
			Management Plan (Entranco Engineers, Inc., 1986a)		
Silver (Cowlitz)	Silver Lake Restoration Phase I:  Diagnostic/		Phase I (1990); Phase II Active
			Feasibility Study (Moore , 1990) 
Silver (Snohomish)								Phase I (1988); Phase II (1993)
Snake (Pierce)		Final Environmental Impact Statement for Snake		Phase I (1989)
			Lake Nature Center New Interpretive Building
			and Restoration Feasibility Study (Metropolitan
			Park District of Tacoma, 1989)
Spada (Snohomish)								Phase I (1977)
Spokane (Spokane)	Lake Spokane Phase I Restoration Project 		Phase I (1993)
			Completion Report (Soltero et al., 1992)
Steilacoom (Pierce)								Phase I (1997)
Stevens (Snohomish)	Lake Stevens Restoration Final Environmental		Phase I (1983); Phase II Active
			Impact Statement (Snohomish County Public 
			Works, 1991)
Twin (Ferry)		Twin Lake Restoration Analysis (Phase I) 		Phase I (1988); Phase II Active
			(Juul, 1987)
Whatcom (Whatcom)	Lake Whatcom Watershed Management Plan 			Phase I (1988); Phase II Active
__________________________________________________________________________________________________

FEDERAL CLEAN LAKES PROGRAM RESTORATION PROJECTS IN WASHINGTON. __________________________________________________________________________________________________ Lake (County) Reference Project Status __________________________________________________________________________________________________ American (Pierce) American Lake Phase I Restoration Project Phase I (1993); Phase II Active Final Report (KCM, Inc., 1993) Ballinger (Snohomish) Restoration of Lake Ballinger, Phase III Final Phase I (1977); Phase II (1987) Report (KCM, Inc., 1986) Beaver (King) Beaver Lake Management Plan (Entranco Engineers, 1993) Phase II Active Campbell (Skagit) Erie and Campbell Lakes Final Report: Restoration Phase I (1984); Phase II (1988) Implementation and Evaluation (Entranco Engineers, Inc., 1987) Erie (Skagit) Erie and Campbell Lakes Final Report: Restoration Phase I (1984); Phase II (1988) Implementation and Evaluation (Entranco Engineers, Inc., 1987) Fenwick (King) Lake Fenwick Phase IB Restoration Project Phase I (1991); Phase II Active (Entranco, 1991) Green (King) An Addendum to the Green Lake Water Quality Phase I (1983); Phase II (1996) Improvement Project Final Environmental Impact Statement (URS Consultants, 1990) Giffin (Yakima) Giffin Lake Restoration Phase I: Diagnostic/Feas- Phase I (1993); Phase II (1996) ibility Study Final Report (Moore et al., 1992) Hicks (King) Hicks Lake Post-Restoration Monitoring Study Phase I (1982); Phase II (1987) (Gendron and Pedersen, 1987) Liberty (Spokane) Extended Post-Restoration Evaluation of Liberty Lake, Phase I (1979); Phase II 1988) Washington Final Report (Breithaupt et al., 1986) Long (Kitsap) Water Quality and Phosphorus Dynamics as Affected Phase I (1977); Phase II (1982) by Alum Treatment in Long Lake, Kitsap County (Welch et al., 1988) Long (Thurston) Pattison and Long Lakes Restoration Project Final Phase I (1982); Phase II (1987) Report (Entranco Engineers, 1987) Moses (Grant) Moses Lake Clean Lake Project Final State 3 Report Phase I (1978); Phase II (1989) (Bain and Moses Lake Conservation District, 1987) Pattison (Thurston) Pattison and Long Lakes Restoration Project Final Phase I (1982); Phase II (1987) Report (Entranco Engineers, 1987) Pine (King) Pine Lake Response to Diversion of Wetland Phosphorus Phase I (1982); Phase II (1991) Phase II Restoration of Pine Lake (Anderson and Welch , 1991) Sacajawea (Cowlitz) Lake Sacajawea Restoration Project (Gibbs et al., 1987) Phase I (1976); Phase II (1987) Sawyer (King) Diagnostic Study of Lake Sawyer King County, Phase I Active Washington (Carroll and Pelletier, 1991); Lake Sawyer Hydrogeologic Study Black Diamond, Washington (Hart-Crowser, 1990) Vancouver (Clark) Operations Plan - Rehabilitation of Vancouver Lake Phase I (1978); Phase II (1993) for the Port of Vancouver (Dames and Moore, 1980) Wapato (Pierce) Wapato Lake Restoration Final Report: Phase I (1981); Phase II (1987) A Discussion of Design Considerations, Construction Techniques and Performance Monitoring (Entranco Engineers, 1986b) _________________________________________________________________________________________________________________

Please report errors to Dave Hallock.