For more information on any of the comment periods, email hanford@ecy.wa.gov, join the Hanford mailing list, and view the Tri-Party Agreement public events calendar. In addition to what's available on our website, documents open for public comment are available at the Hanford Information Repositories.

Filter By Year

Comment period start date will be used for year classification.

2017 2016 All

Air Permit Revision: 222-S Engine Notice of Construction Modification

August 21, 2017 – September 4, 2017 CLOSED

U.S. Department of Energy Office of River Protection proposes a modification to the existing air permit DE15NWP-001, Modification A. The proposed modifications are to provide additional definitions to permit condition terms which are administrative in nature. Requests for a public comment period must be submitted to the permitting authority in writing via letter, fax, or electronic mail during the fifteen-day internet posting period.


Public Comment Period on Proposed Class 2 Permit Modifications to the Unit Descriptions and Closure Activities for the 1301-N and 1325-N Liquid Waste Disposal Facilities

June 5, 2017 – August 4, 2017 September 8, 2017 CLOSED

The U.S. Department of Energy (DOE) is seeking public comment to support Class 2 Permit Modifications to closure activities for the 1301-N and 1325-N Liquid Waste Disposal Facilities. Public comments are accepted from June 5 through August 4 September 8, 2017. The 1301-N and 1325-N facilities were used for liquid waste disposal from N-Reactor, a reactor that was used during the Cold War for plutonium production, and operated from 1963 through 1987. The facilities also received dangerous waste generated from laboratories and may have received waste from spills within the N-Reactor Building.

More details...

Public Comment Period on Proposed Changes to the Hanford WTP Dangerous Waste Permit

July 3, 2017 – September 1, 2017 CLOSED

The U.S. Department of Energy Office of River Protection (ORP) and Bechtel National, Inc. are holding a 60-day public comment period on a proposed modification to the Hanford Waste Treatment and Immobilization Plant (WTP) Dangerous Waste Permit. This proposed permit change provides the operating permit information and draft conditions to support WTP Analytical Laboratory Operations. The public comment period runs from July 3 through September 1, 2017, with a public meeting scheduled for August 3 at 5:30 p.m. at the Richland Public Library (955 Northgate Drive).


Public Comment Period on Proposed modifications to the Hanford 242-A Evaporator chapter of the Hanford Dangerous Waste Permit

June 26, 2017 – September 1, 2017 CLOSED

The U.S. Department of Energy Office of River Protection (ORP) and Washington River Protection Solutions (WRPS) are holding a 60-day public comment period on proposed modifications to the Hanford 242 A Evaporator chapter of the Hanford Dangerous Waste Permit. This modification involves changes to the Part A Form, Preparedness and Prevention Requirements, and Contingency Plan. This change is needed to support waste management activities and remove a diesel generator that is no longer needed. The public comment period runs from June 26 through September 1, 2017, with a public meeting scheduled for July 26 at 6:30 p.m. at the Richland Public Library (955 Northgate Drive).


Public Comment Period on Proposed Class 2 Permit Modifications to the Unit Descriptions and Closure Activities for the 1301-N and 1325-N Liquid Waste Disposal Facilities

June 5, 2017 – August 4, 2017 CLOSED

The U.S. Department of Energy (DOE) is seeking public comment to support proposed Class 2 Permit modifications to the unit descriptions and closure activities for the 1301-N and 1325-N Liquid Waste Disposal Facilities at the Hanford Site in southeastern Washington state. A public meeting to discuss these modifications will be held on July 12, 2017 at 5:30 p.m. at the Richland Public Library.

More details...

Public comment period on proposed changes to the Hanford Waste Treatment and Immobilization Plant (WTP) Permit, Revision 8C.

May 22, 2017 – July 7, 2017 CLOSED

Washington’s Department of Ecology (Ecology) invites you to comment on changes to the Hanford Facility Resource Conservation and Recovery Act (RCRA) Permit, Revision 8C. This change affects the Dangerous Waste Portion of the Treatment, Storage, and Disposal of Dangerous Waste for the Waste Treatment and Immobilization Plant (WTP Permit). The proposed changes are located in Part III, Operating Unit 10. The proposed permit modification incorporates design information for the secondary containment within Effluent Management Facility (EMF) at the WTP Site. A detailed description the proposed modification can be found in the Statement of Basis.

More details...

Public comment period on proposed changes to the Hanford Waste Treatment and Immobilization Plant (WTP) Permit.

March 6, 2017 – May 5, 2017 CLOSED

The U.S. Department of Energy (DOE) Office of River Protection (ORP) and Bechtel National, Inc. (BNI) are holding a 60-day public comment period to support a proposed modification to the Hanford Waste Treatment and Immobilization Plant (WTP) Dangerous Waste Permit (Permit). This requested modification is needed to update the WTP Permit Interim Compliance Schedule to reflect the compliance dates outlined in the Amended Hanford Consent Decree between DOE and the State of Washington issued March 11, 2016. A public meeting presentation is scheduled for March 30 at 5:30 p.m. at the Richland Public Library (955 Northgate Drive). more about this comment period...


Revisions to Groundwater Monitoring Plans for 300 Area Process Trenches and 183-H Solar Evaporation Basins

January 23, 2017 – March 24, 2017 CLOSED

The U.S. Department of Energy Richland Operations Office (DOE-RL) is holding a 60-day comment period on proposed changes to the Hanford Facility Site-wide Dangerous Waste Permit. The proposed modification changes groundwater monitoring requirements for the 300 Area Process Trenches and the 183-H Solar Evaporation Basins Treatment, Storage, and Disposal (TSD) units. The public comment period runs from January 23 through March 24, 2017. A public meeting will be held on February 28, 2017 at 5:30 pm at the Richland Public Library (955 Northgate Drive). more about this comment period...


Draft Notice of Construction (NOC) Permit - DE16NWP-003, for the Waste Treatment Plant (WTP) Effluent Management Facility (EMF)

October 30, 2016 – December 2, 2016 CLOSED

The Washington State Department of Ecology invites you to comment on a new Approval Order for the construction and operation of the WTP EMF.

Show/Hide details...

U.S. Department of Energy Request for Air Quality Permit Modification

September 8, 2016 – September 23, 2016 CLOSED

The U.S. Department of Energy applied on July 6, 2016, for an administrative modification to its current air permit (DE11NWP-001, Rev. 4) that provides for exhausting various Double Shell Tanks. This request is specifically asking to connect the annulus space of Tank AY-102 (which had its own system) to the main system for the AY-102 Tank.

Show/Hide details...

U.S. Department of Energy Request for Air Quality Permit Modification

September 8, 2016 – September 23, 2016 CLOSED

The U.S. Department of Energy applied on June 30, 2016, for an administrative modification to its current air permit (DE15NWP-001) for a diesel engine supporting building ventilation at the 222-S Lab in Hanford's 200 West Area. The engine directly drives a ventilation fan to provide supplemental building ventilation.

Show/Hide details...

Proposed Changes to the permit for Hanford Dangerous Waste Management Area at Plutonium-Uranium Extraction Plant (PUREX)

July 18, 2016 – September 16, 2016 CLOSED

The U.S. Department of Energy Richland Operations Office (DOE-RL) is holding a 60-day comment period on proposed changes to the Hanford Facility Dangerous Waste Permit. These changes will add the Closure Plan for two chemical storage tanks systems, TK-P4 and TK-40 at the PUREX complex to the Hanford Permit. The public comment period runs from July 18 through September 16, 2016. A public meeting will be held on August 31, 2016, at 5:30 pm at the Richland Public Library (955 Northgate Drive). more about this comment period...


Proposed Changes to the permit for Proposed Closure Plan for the 324 Building at Hanford

July 5, 2016 – September 9, 2016 CLOSED

The U.S. Department of Energy Richland Operations Office (DOE-RL) is holding a 60-day comment period on proposed changes to the Hanford Facility Dangerous Waste Permit. These changes will add the Closure Plan and Part A for the 324 Building dangerous waste management units to the Hanford Permit. The public comment period runs from July 5 through September 9, 2016. A public meeting will be held on August 24, 2016, at 5:30 pm at the Richland Public Library (955 Northgate Drive). more about this comment period...

Permit Modification: 8C.2016.3D - Changes to Waste Treatment Plant Design

July 11, 2016 to August 25, 2016 CLOSED - Ecology is drafting a response to comments

Washington’s Department of Ecology (Ecology) invites you to comment on changes to the Hanford Facility Resource Conservation and Recovery Act (RCRA) Permit, Revision 8C.

Show/Hide details...

Proposed Changes to the permit for Hanford Dangerous Waste Management Area at the B Plant Complex

April 25, 2016 to August 6, 2016 CLOSED - Ecology is drafting a response to comments

The U.S. Department of Energy (DOE), Richland Operations Office (RL) plans to propose a change to Hanford’s Dangerous Waste Permit to close the 276-BA Organic Storage Facility located at the B Plant.

Show/Hide details...

Proposed Permit Modification: 8C.2016.1D - Proposed changes to Part V of the Hanford Site-wide Permit - 207-A SRB

May 9, 2016 to June 24, 2016 CLOSED - Ecology is drafting a response to comments

Washington’s Department of Ecology (Ecology) invites you to comment on a proposed change to Hanford’s dangerous waste permit, also known as the Hanford Site-wide Permit.

Show/Hide details...

Proposed Permit Modification: 8C.2016.2D - Changes to Part V of the Hanford Site-wide Permit

March 14, 2016 - April 27, 2016 CLOSED - Ecology is drafting a response to comments

Washington’s Department of Ecology (Ecology) invites you to comment on a proposed change to Hanford’s dangerous waste permit, also known as the Hanford Site-wide Permit.

Show/Hide details...

Proposed Changes to the permit for Hanford Dangerous Waste Management Areas

February 1, 2016 – April 8, 2016 CLOSED - Ecology is drafting a response to comments

The U.S. Department of Energy Richland Operations Office (DOE-RL) is holding a 60-day comment period on proposed changes to the Hanford Facility Dangerous Waste Permit. These changes will add the Low-Level Burial Grounds Trenches 31-34-94, the Central Waste Complex-Waste Receiving and Processing Facility (CWC-WRAP), and the T Plant Complex (T Plant) to the Hanford Permit. The public comment period runs from February 1 through April 8, 2016. more about this comment period...


Air Permit Revision for 241-AP, 241-SY, and 241-AY/AZ Tank Farms -
DE11NWP-001, Rev. 4

January 24 – February 23, 2016 CLOSED - Ecology is drafting a response to comments

The Department of Ecology invites you to comment on a proposed “Notice of Construction”, DE11NWP-001, Rev. 4. This is the fourth revision to the original Approval Order (Permit) issued. The Permittee is the U.S. Department of Energy Office of River Protection.

Show/Hide details...

Permit Modification: 8C.2015.1D - Changes to Part II and Attachment 9 of the Hanford Site-wide Permit

December 28 – February 13, 2016 CLOSED - Read Ecology's response to comments

Washington’s Department of Ecology (Ecology) invites you to comment on a proposed change to Hanford’s dangerous waste permit, also known as the Hanford Site-wide Permit. The change is to modify and add Part II permit conditions. These changes will also be reflected in Attachment 9 of the Hanford Site-wide Permit.

Show/Hide details...

Permit Modification: 8C.2015.2D - Changes to Waste Treatment Plant Design

December 28 – February 13, 2016 CLOSED - Read Ecology's response to comments

Washington’s Department of Ecology (Ecology) invites you to comment on proposed changes to the Hanford Facility Resource Conservation and Recovery Act (RCRA) Permit, Revision 8C. This change affects the Dangerous Waste Portion for the Treatment, Storage, and Disposal of Dangerous Waste for the Waste Treatment and Immobilization Plant (WTP Permit). The proposed changes are located in Part III, Operating Unit 10.

Click here for more information about this comment period

Proposed Changes to Hanford Central Plateau Cleanup Work and Schedule

October 26 – February 12, 2016 CLOSED - Ecology is drafting a response to comments

The U.S. Department of Energy Richland Operations Office (DOE-RL), Washington State Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) – the Tri-Party Agreement (TPA) agencies – are proposing changes to the TPA.  These proposed changes affect the schedule for completing cleanup work on the Hanford Central Plateau and the 300 Area.

The proposed changes set new dates for completing work on the Central Plateau that is identified in the M-015, M-016, M-037, M-085, and M-094 milestone series. These milestone series deal with completing investigation of Central Plateau waste sites, issuing cleanup decisions, implementing cleanup decisions for waste sites and canyon facilities, completing cleanup of specified units, and completing cleanup of the 300 Area. For more information on these milestones and proposed changes, please see the attached fact sheet.  Click here for more information about this comment period


Air Permit Revision to Facilitate Waste Retrieval from Hanford Tank AY-102

October 25 – November 25, 2015 CLOSED - Read Ecology's response to comments

The Department of Ecology proposes to approve a “Notice of Construction” that will be added to the Hanford Air Operating Permit when it is next revised. The Permittee is the U.S. Department of Energy Office of River Protection.

Show/Hide details...

Closure Plan for the FS-1 Outdoor Container Storage Area in Central Hanford

August 3 – September 18, 2015 CLOSED - Read Ecology's response to comments

The Washington Department of Ecology proposes a modification to the Hanford Dangerous Waste Permit. The permittees are the United States Department of Energy Richland Operations Office and CH2M Hill Plateau Remediation Company. The change is for an area next to Low-Level Burial Ground Trench 34 in Hanford’s 200 West Area.

Show/Hide details...

TPA Proposed Changes to Milestone 91

July 6, 2015 – August 21, 2015 Extended to September 25, 2015 CLOSED - Ecology is drafting a response to comments

The U.S. Department of Energy Richland Operations Office, Washington State Department of Ecology, and The U.S. Environmental Protection Agency – The Tri-Party Agreement (TPA) agencies – are proposing changes to the TPA.  These proposed changes affect the schedule for retrieving, characterizing, and shipping Hanford Site mixed low-level waste and transuranic mixed waste. more about this comment period...


Waste Treatment Plant Risk Assessment Work Plan Modification

July 20 - September 4, 2015 Extended to September 25, 2015 CLOSED - Read Ecology's response to comments

The Washington Department of Ecology is extending the public comment period on a proposed modification to the Waste Treatment and Immobilization Plant (WTP) Permit. The comment period began on July 20 and was scheduled to end on September 4. It has been extended until September 25.

Show/Hide details...

Closure Plan for Hanford's 207-A South Retention Basin

June 30 – August 28, 2015 CLOSED - Read Ecology's response to comments

The United States Department of Energy (USDOE) seeks a Class 3 modification to Hanford’s Dangerous Waste Permit, to close the 207-A South Retention Basin.  The basin is a concrete structure used from 1977 through 1989 to store process condensate from the 242-A Evaporator. The basin has been empty since April 1989.

Show/Hide details...

Rotary Core Sampling Systems for Hanford’s Tanks

May 31 – July 3, 2015 CLOSED - Ecology is drafting a response to comments

The Department of Ecology proposes to approve a “Notice of Construction” that will be added to the Hanford Air Operating Permit when it is next revised. The Permittee is the U.S. Department of Energy Office of River Protection.

Show/Hide details...


Air Permit Changes to Begin Waste Retrieval from Hanford Tank AY-102

May 31 – July 3, 2015 CLOSED - Read Ecology's response to comments

The Department of Ecology proposes to approve a “Notice of Construction” that will be added to the Hanford Air Operating Permit when it is next revised. The Permittee is the U.S. Department of Energy Office of River Protection.

Show/Hide details...


Hanford Air Operating Permit revision

March 22 - April 24, 2015 - Extended to May 8th 2015 CLOSED - Ecology is drafting a response to comments

Show/Hide details...


Adding capacity to Hanford’s 325 Hazardous Waste Treatment Units (HWTUs)

March 2 to April 17, 2015 CLOSED - Read Ecology's response to comments


Show/Hide details...


Ventilation Upgrades and Closing Unused Hot Cells at Hanford’s Waste Encapsulation and Storage Facility (WESF)

December 11, 2014 – February 20, 2015 Public Comment Period Extended until March 3, 2015 in order to provide 30 days for public review of the Treatability Variance document) CLOSED -

Read Ecology's response to comments


Show/Hide details...

Class 2 Modifications to Hanford’s permit for Dangerous Waste Management Units

September 15 – November 13, 2014 CLOSED - Ecology is drafting a response to comments

Show/Hide details...

Class 3 Modification to Perma-Fix Northwest Richland, Inc (PFNW) permit to Add an Evaporator System

August 31 - October 31, 2014 CLOSED - Read Ecology's response to comments


Show/Hide details...

Class 2 Modification to Hanford's permit for the Liquid Effluent Treatment Facility (LERF)

August 25 - October 24, 2014 CLOSED - Read Ecology's response to comments


Show/Hide details...

Class 3 Modification to Hanford’s permit for the 325 Hazardous Waste Treatment Units (HWTUs)

August 18 - October 17, 2014 CLOSED - Read Ecology's response to comments


Show/Hide details...

Hanford’s Waste Treatment and Immobilization Plant Permit Design Changes

September 2 to October 20, 2014 CLOSED - Read Ecology's response to comments

Show/Hide details...

Draft Renewal for State Waste Discharge Permit for a State-Approved Land Disposal Site for the 200 Area Effluent Treatment Facility

September 8 – October 10, 2014 CLOSED - Read Ecology's response to comments

Show/Hide details...

Class 3 Permit Modification at Perma-Fix Northwest
Richland, Inc.

May 6 – July 5, 2014  CLOSED - Read Ecology's response to comments

Show/Hide details...

Class 2 Permit Modifications for the Liquid Effluent Retention Facility and 200 Area Effluent Treatment Facility (LERF/ETF) Section of Hanford’s Permit

January 20 – March 21, 2014 - CLOSED - Read Ecology's response to comments

Show/Hide details...

Groundwater Monitoring and Well Management at Central Hanford Facilities

January 6 to March 7, 2014  - CLOSED - Read Ecology's response to comments

Show/Hide details...

Closing Parts of Low-Level Burial Grounds (LLBGs) 31, 34, and 94; Central Waste Complex and Waste Receiving and Processing Facility (CWC-WRAP); and T Plant

October 30, 2013 to January 6, 2014 -  CLOSED - Ecology is drafting a response to comments

Show/Hide details...