Archived Public Notices (Statewide)

The table below links to public notices whose comment period are expired. The notices are listed in descending order by their date of issuance. These public notices will be archived for a period of one year from their issued date.

Reference #

Issue Date

Applicant Project Description County Project
Manager
FERC No. 2225 May 6, 2011 PUD No. 1 of Pend Oreille County Sullivan Creek Project, FERC License Surrender Pend Oreille Maher
  April 21, 2011 King County Water and Land Resources Division May Creek Drainage Improvement Project King Padgett
201100165 April 19, 2011 City of Battle Ground SE Grace Avenue Improvement Project

Public Notice Erratum

Clark Ochoa
  April 15, 2011 US Army Corps of Engineers, Seattle District Repair damage to Oso levee on the North Fork Stillaguamish River. Snohomish Padgett
  April 15, 2011 US Army Corps of Engineers, Seattle District Repair the damaged portions of the Skagit River levees. Skagit Padgett
201100229 April 13, 2011 Kenneth and Robin Phillips Modifications to existing pier, including dredging of 520 cy and placement of 100cy spawning gravel. King Padgett
201000510P April 7, 2011 Port of Vancouver Construct a facility designed to receive, handle, store, load, and ship bulk quantities of potash using freight rail and shipping vessels. Clark Ochoa
201100131 April 4, 2011 Taylor Shellfish Farms Install a 3.5-acre commercial shellfish farm for production of geoduck clams (Scott Lease). Mason Ochoa
201001238 April 4, 2011 Taylor Shellfish Farms Install a 3-acre commercial shellfish farm for production of geoduck clams (Hitchcock Lease). Mason Ochoa
201100044 April 4, 2011 Taylor Shellfish Farms Install a 6-acre commercial shellfish farm for the production of geoduck clams (Taylor Geoduck Farm). Mason Ochoa
201100127P March 31, 2011 Bonneville Power Administration/Army Corps of Engineers, Portland District Proposal to Issue a Regional General Permit
for Habitat Restoration funded by Bonneville
Power Administration
Tidally influenced portions of the Columbia River Basin in Washington Ochoa
201100021 March 29, 2011 Grant County PUD No. 2 Improve downstream fish passage through the Priest Rapids project. Grant Maher
201100119 March 24, 2011 National Park Service - Mount Rainier National Park Carbon River Entrance Erosion Control Pierce Ochoa
  March 22, 2011 WA Department of Transportation I-405 Bellevue to Lynnwood Improvement Project King, Snohomish Kelley
201001322 March 16, 2011 City of Bellevue Sunset Creek Flood Control Project, Phase II. King Padgett
201001237 March 15, 2011 Taylor Shellfish Farms Install an up to 2-acre shellfish farm for production of geoduck clam (Sullivan Geoduck Farm). Mason Ochoa
201001169

March 8, 2011

F&M Development Construct a pier, ramp, and float to serve as a community dock and install three mooring buoys. Pierce Ochoa
201000872 March 8, 2011 Port of Everett Pacific Terminal Maintenance Dredging Snohomish Pressley
PL-10-08 March 7, 2011 US Army Corps of Engineers, Seattle District Re-align and restore approximately 2,500 linear feet of shoreline in Ed Munro Seahurst Park. King Padgett
201100061 March 3, 2011 WA Department of Transportation Add a new HOV lane along a 2.01 mile section of NB I-5 from Portland Ave to Port of Tacoma Road. Pierce Kelley
201001192 February 23, 2011 Lake Chelan Yacht Club Provide improved boat moorage and facilities for recreational use of Lake Chelan. Chelan Graff
200701721 February 22, 2011 Trident Marine Services, Inc. Harvest of 0.23 acre of geoduck previously installed. Install an additional 0.23 acre of geoduck within the intertidal plot for a total of 0.46 acre. Mason Ochoa
-- February 18, 2011 WA Department of Transportation SR 161 Mashel River Bridge Scour and Slope Repair Pierce Kelley
200901171 February 18, 2011 Metro Parks of Tacoma Place fill in wetlands in the Core and Animal Health areas of Northwest Trek Wildlife Park. Pierce Ochoa
200801567 February 16, 2011 Taylor Shellfish Farms Erratum to Public Notice issued February 9, 2010. This erratum revises the project description of the original public notice. The project has increased from a 0.25 acre to a 1 acre commercial shellfish farm for the production of Manila and Geoduck clams. Thurston Ochoa
200900900 February 14, 2011 Jamestown S'Klallam Tribe Install a 1.5 acre commercial shellfish farm for the production of geoduck. Jefferson Ochoa
201100028 February 14, 2011 Washington Department of Ecology Padilla Bay Boat Launch Improvements Skagit Padgett
201000849 February 8, 2011 Walter Pisco & Steve Alegria Remove an existing dock, replace with a community dock and additional boatlift. Chelan Graff
201000807 February 1, 2011 Jon Koloski Construct a concrete bulkhead with recessed stair case. Mason Ochoa
201001052 January 28, 2011 Port of Tacoma Replacement and reconfiguration of float system at an existing boat repair and storage facility. Pierce Ochoa
201001041 January 26, 2011 Douglas County PUD #1 Construction of a boat launch on the Columbia River south of Wells Dam. Chelan Pressley
200900259 January 13, 2011 Arcadia Point Seafood Establish a commercial intertidal geoduck clam aquaculture farm (McClure Property)  Thurston Ochoa
200900261 January 13, 2011 Arcadia Point Seafood Establish a commercial intertidal geoduck clam aquaculture farm (Thiesen Property) Thurston Ochoa
201001244 December 29, 2010 King County Department of Transportation, Marine Division Provide moorage and maintenance facilities for existing King County passenger ferries at Pier 48. King Padgett
200800151 December 23, 2010 WA Department of Transportation Pontoon casting basin for SR 520 Pontoon Construction Project. Grays Harbor Swanson
201000263 December 17, 2010 Summit Bank Place fill in wetlands for mixed commercial facilities. Skagit Padgett
201001153 December 15, 2010 Washington State Department of Transportation Widen SR 522  between the Snohomish River Bridge and US 2. Snohomish Kelley
201001228 December 10, 2010 Washington State Department of Transportation Widen SR 9 between 212th Street SE and 176th Street SE. Snohomish Kelley
201000825 December 10, 2010 National Park Service--Lake Chelan National Recreation Area Construct overwater walkway and mooring for passenger ferries and repair adjacent bulkhead. Chelan Graff
10-N-06 December 9, 2010 Seattle Department of Transportation Ballard Bridge Seismic Retrofit King Padgett
201000044 December 6, 2010 R & M Land LLC Construct single use pier and boatlift. Chelan Graff
201000769 December 1, 2010 Lagoon Point Community Association Maintenance dredging to maintain Island Pressley
201000185 November 30, 2010 WA Department of Transportation Salmon Creek Interchange Project Clark Carroll
201000926 November 16, 2010 D&B Legacy Trust Install a pier, ramp, float in Lake Chelan. Chelan Graff
201001144 November 9, 2010 Tin Rock Development Provide commercial and residential facilities in the north Bellingham vicinity. Whatcom Padgett
200900617 November 5, 2010 Port District of South Whidbey Island Expand and enhance existing small boat marina. Island Padgett
  November 4, 2010 Dallesport Treaty Fishing Access Site Development of treaty fishing site along the Lower Columbia River. Klickitat Reed
10-N-04 October 29, 2010 City of Bellingham Construct a new fixed bridge for pedestrians to connect Boulevard Park with the former Cornwall Avenue Landfill site. Whatcom Padgett
  October 28, 2010 Missile Defense Agency Maintenance and Repair of Seabase X-Band Radar Vessel (SBX Vessel) Snohomish Padgett
200901482 October 15, 2010 Fairweather Basin Boat Club Maintenance dredge to maintain private channel for navigation. King Pressley
  October 1, 2010 Seattle City Light Gorge 2nd Tunnel Whatcom Padgett
201000158 September 24, 2010 King County Water and Land Resources Removal of sediment and vegetation from May Creek. King Padgett
CENWS-OD-RG-RGP-6 September 23, 2010 US Army Corps of Engineers, Seattle District Re-issuance of Regional General Permit 6: Residential Inland Marine Overwater Structures Statewide: Inland Marine Waters Pressley
PL-10-10 September 22, 2010 US Army Corps of Engineers, Seattle District Green River gravel nourishment project. King Padgett
FERC Project No 2157 September 27, 2010 Public Utility District No. 1 of Snohomish County Continuing to operate the Jackson Hydropower Project on the Sultan River. Snohomish Padgett
201000994 September 15, 2010 Newport Yacht Club Dredge sediment from marina interior, marina entrance, and part of the embayment area to the south of the marina. King Pressley
200801422 September 10, 2010 Douglas & Mary Hassan Construct a pier and install a ramp, float, mooring buoy, and boatlift in Hale Passage. Pierce Ochoa
200901014 September 8, 2010 Skamania County Parks Wind River Boat Launch Replacement Skamania Ochoa
200701715 August 16, 2010 Cedar Grove Composting Expansion of facility, including fill of wetlands associated ditches, construction of access roads, and equipments pads. Snohomish Padgett
PL-10-11 August 12, 2010 US Army Corps of Engineers, Seattle District Placement of gravel and sand on Puget Sound beach to prevent continued erosion. King Padgett
200900242 August 11, 2010 City of Redmond, Public Works Department Construct new, meandering Bear Creek stream channel with fish habitat features. King Padgett
CENWS-OD-RG-RGP-8 August 5, 2010 Army Corps of Engineers, Seattle District Modifications to Regional General Permit 8, US Forest Service Fish Passage Program within the State of Washington Statewide Pressley
200701721 August 2, 2010 Trident Marine Services Harvest geoduck shellfish previously installed. Install an additional 0.23 acre of geoduck.  Mason Ochoa
200901517 July 30, 2010 Tacoma Power Provide salmonid passage at a hydroelectric facility. Mason Ochoa
200801305 July 28, 2010 Knife River Construction of docking facility and conveyer belt system for aggregate distribution facility and ready-mix concrete batch plant. Cowlitz Ochoa
201000678 July 20, 2010 City of Morton Remove log jam, divert Connelly Creek back to original channel, stabilize creek banks, and replace a bridge. Lewis Ochoa
200900659, 200900781 July 16, 2010 Conner Homes at Barbee Mill, LLC Construct two new joint-use piers. King Padgett
201000140 July 16, 2010 Conner Homes at Barbee Mill, LLC Construct a new fully grated community-use dock. King Padgett
200901559 July 7, 2010 Port of Seattle Terminal 5 maintenance dredging King Pressley
200901195 June 29, 2010 Jeff and Heidi Soehren Remove portion of pier and float; construct new pier and install a boat lift. Chelan Graff
201000643 June 14, 2010 Snohomish County Parks and Recreation Department Centennial Trail Phase 1--Public trail for recreational use Snohomish Padgett
201000251 June 11, 2010 Colville Confederated Tribes Construct two piers with concrete footings Okanogan Graff
201000517 June 9, 2010 PacifiCorps Energy Construct a fish handling facility and install debris booms. Skamania Ochoa
200900165 June 7, 2010 TGM Investments Placement of dolphins, sheet pile, rock, concrete pad to enlarge loading dock. Whitman Maher
FERC Project No. 2342 May 28, 2010 PacifiCorp Energy Removal of the Condit Hydroelectric Project Skamania, Klickitat Randall
200601439 May 26, 2010 U.S. Navy Installation of an on-land security enclave at Naval Base Kitsap Kitsap Padgett
200800896 May 20, 2010 City of Auburn Fill or excavate wetlands in order to construct 0.5 mile of a new arterial to form a north-south corridor in the City of Auburn. King Padgett
201000614 May 19, 2010 Port of Anacortes Dredge within the Swinomish Channel navigation channel. Skagit Pressley
200900040 May 17, 2010 City of Tacoma, Dept. of Public Utilities Replace existing water transmission pipeline under the Puyallup River. Pierce Ochoa
200901151 May 7, 2010 City of Oak Harbor Replace and extend existing stormwater outfall system. Island Padgett