Nisqually River

Introductory pages, Chapters 1-4, and the Appendices of the Nisqually River GRP have been updated with a new version date of March 2003. This version includes new strategy maps produced in ArcView that are based on a new page-grid.

Other Changes in the New Version

The strategy numbering has not been changed in the new version, but the prefix has been changed from SNR to NR. The strategies are essentially the same as the March 1997 version, but the matrices have been updated using the same format as the other GRPs.

The booming strategy priority tables for the Nisqually River GRP have not been updated, and do not use “Potential Spill Origin” sites as the other GRPs do.

The updated chapters are available below as Adobe Acrobat pdf files. GRP users with old versions should replace all pages in the introduction, Chapters 1-4, and Appendices with the March 2003 version.

 

(On-line versions (PDF), require version 5.0 or later of Adobe Reader software)
Note: Depending on your connection speed, files can take several minutes to download!

Paper copies are available on request:

Please submit comments and requests for paper copies to: Rebecca Post
Washington Department of Ecology Spills Program
P.O. Box 47600, Olympia, WA 98504-7600
360-407-7114 Voice
360-407-7288 Fax
repo461@ecy.wa.gov