A PUGET SOUND INITIATIVE site – Reaching the goal of a healthy, sustainable Puget Sound now and forever
A lumber mill, and later a pulp mill operated on the Scott Paper Mill Site
beginning in the late 1800s through the late 1970s. The pulp mill used
waste from the lumber mill and discharged waste water directly to Fidalgo
Bay. Metals, diesel- and motor oil-range petroleum hydrocarbons,
carcinogenic polynuclear aromatic hydrocarbons (cPAHs), polychlorinated
biphenyls (PCBs), and dioxins/furans have been found in soil at the Site
above Washington State cleanup levels. Many of these contaminants were also
found in groundwater (low levels) and marine sediments. In 1999, the
Port of Anacortes and Sun Healthcare Systems conducted an independent
cleanup action to remove petroleum-contaminated soil and wood debris on one
of the parcels within the Site. Portions of the property have been operated
recently by multiple entities that have used the Site as a log yard, a
staging area for oil field equipment, a boat manufacturing site, storage,
and a modular home assembly area. The northern portion of the Site is
now primarily Seafarers’ Memorial Park, and the southern portion is
primarily vacant.
Site Documents
August 31, 2009
June 1, 2009
February 2009
Public comment period is open from February 25 through March 25, 2009
for the Draft Consent Decree and Draft Cleanup Action Plan.
Consent Decree
Exhibit A
Site Location Map
Site Plan
Exhibit B - Draft Cleanup Action Plan (text)
Tables
Figures
Appendix A - September 2008 Port Uplands Area Supplemental Soil Investigation
Appendix B - 2007 AND 2008 Supplemental Sediment Chemistry and
Biological Testing Data
Appendix C - Compliance with Applicable Laws
Exhibit C - Natural Resource Damages Settlement
Exhibit D - Schedule and Deliverables
Exhibit E - Applicable Relevant and Appropriate Requirements
Exhibit F - Ecology Policy 840 (Data Submittal Requirements)
Exhibit G - Boiler Plate Restrictive Covenant
Exhibit H - Public Participation Plan
Port of Anacortes SEPA Documents
November 26, 2008
Agreed Order
Site Location Map
Scott Mill
Site Map
August 2008
Fact Sheet
Public
Participation Plan
Remedial Investigation (text)
Figures
Figure 1. Vicinity Map
Figure 2. Site Plan
Figure 3. Historical Site Photo with Highlighted Site Features, August 16, 1969
Figure 4. Site Soil Preliminary Cleanup Level Development under MTCA
Figure 5. Site Groundwater Preliminary Cleanup Level Development under MTCA
Figure 6. Soil Explorations – Port Parcel 3 Uplands Area RI and Previous
Investigations
Figure 7. Sample and Cross Section Locations, Upland Remedial Investigation, MJB
Property
Figure 8. Cross Section Locations
Figure 9. Cross Section A-A’
Figure 10. Cross Section B-B’
Figure 11. Cross Section C-C’
Figure 12. Cross Section D-D’
Figure 13. Port Uplands Area Preliminary Soil Cleanup Level Exceedance Locations
(0-2 ft BGS)
Figure 14. Port Uplands Area Preliminary Soil Cleanup Level Exceedance Locations
(2-6 ft BGS)
Figure 15. Port Uplands Area Preliminary Soil Cleanup Level Exceedance Locations
(6-10 ft BGS)
Figure 16. Port Uplands Area Preliminary Soil Cleanup Level Exceedance Locations
(10-15 ft BGS)
Figure 17. Preliminary Soil Cleanup Level Exceedance Locations (0-2 ft BGS) MJB
North Area
Figure 18. Preliminary Soil Cleanup Level Exceedance Locations (2-6 ft BGS) MJB
North Area
Figure 19. Preliminary Soil Cleanup Level Exceedance Locations (6-15 ft BGS) MJB
North Area
Figure 20. Cross Section A-A’, Uplands Remedial Investigation, MJB Property
Figure 21. Groundwater Elevation Contours, May 2004
Figure 22. Groundwater Elevation Contours, August 2004
Figure 23. Groundwater Elevation Contours, July 2005
Figure 24. Groundwater Elevation Contours, January 2006
Figure 25. Estimated Groundwater Flow Direction
Figure 26. Tidal Influence on Groundwater Levels
Figure 27. Groundwater and Surface Water Elevations vs. Time
Figure 28. Groundwater Elevation Contours at Low Tide, December 2, 2004
Figure 29. Groundwater Elevation Contours at Mid Tide, December 2, 2004
Figure 30. Groundwater Elevations at High Tide, December 2, 2004
Figure 31. Historical and RI/FS Sediment and Nearshore Groundwater Samples,
Site-Wide Marine Area
Figure 32. Bathymetric Contours – Marine Area
Figure 33. Estimated Area of Sediment Deposition and Crab Tissue Sampling
Stations
Figure 34. Radioisotope Profiles in Sediment Core Samples
Figure 35. Summary of Total PCB Concentrations in Sediment, Marine Area
Figure 36. Areal Extent of SQS and CSL Exceedances, Marine Area
Figure 37. Geologic Cross Sections, MJB North Area and Site-Wide Marine Area
Figure 38. Cross Sections A-A’
Figure 39. Cross Sections B-B’
Figure 40. Cross Sections C-C’
Figure 41. Cross Sections D-D’
Figure 42. Conceptual Site Model
Tables
Feasibility Study (text)
Tables
Figures
Figure 1. Vicinity Map
Figure 2. Site Plan
Figure 3. Port Uplands Area Preliminary Soil Cleanup Level Exceedance
Locations (0-2 ft BGS)
Figure 4. Port Uplands Area Preliminary Soil Cleanup Level Exceedance
Locations (2-6 ft BGS)
Figure 5. Port Uplands Area Preliminary Soil Cleanup Level Exceedance
Locations (6-10 ft BGS)
Figure 6. Port Uplands Area Preliminary Soil Cleanup Level Exceedance
Locations (10-15 ft BGS)
Figure 7. Preliminary Soil Cleanup Level Exceedance Locations (0-2 ft BGS),
MJB North Area
Figure 8. Preliminary Soil Cleanup Level Exceedance Locations (2-6 ft BGS),
MJB North Area
Figure 9. Preliminary Soil Cleanup Level Exceedance Locations (6-15 ft BGS),
MJB North Area
Figure 10. Conceptual Site Model
Figure 11. Summary of Total PCB Concentrations in Sediment, Marine Area
Figure 12. Areal Extent of SQS and CSL Exceedances, Marine Area
Figure 13. Geologic Cross Sections, MJB North Area and Site-Wide Marine Area
Figure 14. Cross Section A-A’
Figure 15. Cross Section B-B’
Figure 16. Cross Section C-C’
Figure 17. Cross Section D-D’
Figure 18. Alternative PUA-1
Figure 19. Alternative PUA-2
Figure 20. Alternative PUA-3
Figure 21. Alternative PUA-4
Figure 22. Alternative MJB-1, MJB North Area
Figure 23. Alternative MJB-2, MJB North Area
Figure 24. Alternative MJB-3, MJB North Area
Figure 25. Alternative MJB-4, MJB North Area
Figure 26. Plan View Marine Alternative M-1
Figure 27. Plan View Marine Alternative M-2
Figure 28. Cross-Section A-A’: Marine Alternative M-1
Figure 29. Cross-Section B-B’: Marine Alternatives M-1 and M-2
Figure 30. Cross-Section C-C’: Marine Alternative M-1
Figure 31. Cross-Section D-D’: Marine Alternatives M-1 and M-2
Figure 32. Cross-Section A-A’: Marine Alternative M-2
Figure 33. Cross-Section C-C’: Marine Alternative M-2
Appendices
Related Information
Additional Resources
|
|

SITE INFORMATION
Facility Site ID
# 8122259
Location:
Anacortes, Skagit County

Photo Gallery
Document
Archive
Contact:
Panjini Balaraju,
Site Manager
360/407-6161
Status:
Ranked, Awaiting Remedial Action
|