SITE BACKGROUND

The Upriver Dam PCBs Sediments Site is divided into two projects. Upriver Dam, identified as Deposit 1, begins directly behind Upriver Dam in the city of Spokane and continues east for approximately 3.6 acres. Donkey Island, identified as Deposit 2, is a small 0.25-acre area near Donkey Island in an unincorporated area.  Sediments at both project locations are contaminated with Polychlorinated Biphenyls (PCBs).

Cleanup was necessary because:

  • PCBs build up in the fatty tissues of humans, fish and animals and may cause harmful health effects.
  • Capping and removal of PCBs reduces contamination in the environment.
  • Reducing contamination provides a safer environment for children, adults, and wildlife using these areas.

Upriver Dam PCB Sediment Site Cleaned Up 2006

Click on photo for larger size.
Placing the Cap Behind Upriver Dam

The dam is located along Upriver Drive east of Greene Street. The project begins directly behind the dam and stretches east for nearly one-half mile. Under Ecology’s direction, contractors for Avista Development, Inc., placed a three-layered cover called an engineered cap over the contaminated sediments on the river bottom. The cap is made of coal, sand, and gravel and is intended to isolate PCBs and keep contaminants from moving.

Donkey Island PCB Site Cleaned Up in 2007

This project is east of the dam in wetlands and backwater channels found on the north bank of the river. Ecology provided oversight as contractors removed PCB-contaminated soil and restored the area with clean sand.  Areas disturbed during PCB removal were replanted in the spring of 2007.

Click on photo for larger view.

  Dredging PCBs at Donkey Island

For construction details and associated documents for both sites, please click on the links below.

Site Documents

Fact Sheet: Spokane River Project Update 2007

Fact Sheet Engineering Design Report:
                    English  
                         Русски
                    Español

 Engineering Design Report (English only)      
                    Table of Contents
                    Introduction
                    Deposit 1 Remediation
                    Deposit 2 Remediation
                    Compliance Monitoring and
                        Construction Schedule
                    References
                    Figure 1
                    Figure 2: Deposit 1 Site
                        Overview
                    Figure 3: Deposit 2 Sampling
                    Figure 4: Deposit 1 Site
                        Access Plan
                    Figure 5: Deposit 2 Sampling
                        Station Cores
                    Figure 6: Deposit 2 Access
                        Routes and Staging
                        Stockpiling Areas
                    Figure 7: Timeline for Upriver
                        Dam PCB Sediment Site
                        RD/RA
                    Appendix A: Draft Final Drawings
                            A1                B1                C1            C4
                            A2                B2                C2            C5
                            A3                B3                C3            C6
                    Appendix B:
                            Construction Quality Assurance Plan
                                  Table of Contents
                            Introduction
                            Project Organization and Responsibilities
                            Construction
                            Remedial Action Construction
                            Documentation and Reporting
                            References
                            Tables - Construction Submittals
                            Figure 1
                            Figure 2
                            Figure 3
                            Figure 4
                    Appendix C:
                            Table of Contents
                            Introduction
                            Roles and Responsibilities
                            Routine Monitoring Events and Table 1
                            Figure 1
                            Remainder of Appendix C
                    Appendix D:
                            Table of Contents
                            Introduction
                            Bathymetric Survey
                            Sediment Sampling and Analysis
                            Quality Assurance Project Plan
                            References
                            Tables 1-3
                            Tables 4-5
                            Figure 1
                            Figure 2
                            Figure 3

Technical Specifications (English only)
                    Table of Contents
                    Part A General Conditions
                    Part B Technical Specifications

Document Archives

Related Information

Additional Resources

 

map showing site location as Spokane County, WA SITE INFORMATION

Facility Site ID: # 65178472

Location:
Spokane County

Contacts:
Brendan Dowling
Site Manager
 509/329-3611

Carol Bergin,
Community      Involvement
(509) 329-3546

Status: Ranked, Remedial Action in Progress Get definitions of Status terminology

More about the Spokane River

Photo Gallery