The Lower Duwamish Waterway

Click on photo for larger view.Draft Site Documents

This is a list of draft site documents that are available to the public upon request.  As part of our enhanced public participation process, Ecology’s Lower Duwamish site managers will coordinate with stakeholders throughout the public involvement process.  This may include sharing draft documents, as appropriate.   Please note that the documents on this list are not part of an official public comment period and they have not been approved by Ecology. 

If you are interested in obtaining a copy of any of the following draft documents visit Ecology’s Public Records Disclosure webpage and submit a Public Disclosure Request form

LDW Remedial Investigation/Feasibility Study documents are posted on the Lower Duwamish Waterway Group webpage.

Draft Site Documents (in  date order)

Site Name:  Crowley Marine Services 8th Avenue S
Draft Document:  (Draft) Final Remedial Investigation/Feasibility Study Work Plan, 8th Avenue Terminals, Inc. Site, Seattle, Washington, March 21, 2012

Site Name:  Douglas Management Dock
Draft Document:  Draft Work Plan, Remedial Investigation/Feasibility Study, 7100 1st Avenue South Site, Seattle, Washington, February 6, 2012

Site Name:  Duwamish Marine Center
Draft Document:  Remedial Investigation/Feasibility Study Work Plan, Duwamish Marine Center, 6365 1st Avenue S, Seattle, December 1, 2011

Site Name:  Douglas Management Dock
Draft Document: Draft Work Plan, Remedial Investigation/Feasibility Study, 7100 1st Avenue South, Seattle, Washington, October 17, 2011

Site Name:  Duwamish Shipyard, Inc.
Draft Document:  Phase I Remedial Investigation Data Memorandum Duwamish Shipyard, Inc. Site., September 2011

Site Name:  Glacier Northwest, Inc. - Reichhold Inc.
Draft Document:   Remedial Investigation and Feasibility Study Work Plan Glacier Northwest, Inc. – Reichhold, Inc., Site, September 2011

Site NamePort of Seattle North Terminal 115
Draft Document:  Draft Work Plan Remedial Investigation/Feasibility Study Port of Seattle North Terminal 115, April 29, 2011

Site Name: Douglas Management Dock
Draft Document: Draft Data Gap Report, 7100 1st Avenue South, July 6, 2011

Site Name: Port of Seattle North Terminal 115
Draft Document: Draft Work Plan, Remedial Investigation/Feasibility Study, Port of Seattle North Terminal 115, April 29, 2011

Site Name: 8801 East Marginal Way South
Draft Document: Draft Data Gaps Work Plan, 8801 East Marginal Way South, Tukwila, WA, April 22, 2011

Site Name: Jorgensen Forge
Draft Document: Draft Final Source Control Evaluation Addendum Report, March 2011

Site Name: Industrial Container Services-WA, LLC
Draft Document: Remedial Investigation/Feasibility Study (RI/FS) Work Plan, Industrial Container Services/Former Northwest Cooperage Site, Seattle, WA, January 31, 2011

Site Name: Crowley Marine Services 8th Avenue S
Draft Document: Draft Final Remedial Investigation/Feasibility Study Work Plan, 8th Avenue Terminals, Inc. Site, Seattle, WA, December 7, 2010

Site Name: Glacier Northwest, Inc.
Draft Document: DRAFT Remedial Investigation and Feasibility Study Work Plan, Glacier Northwest, Inc., and Reichhold, Inc., November, 2010

Site Name: 8801 East Marginal Way South Site   
Draft Document:  Draft Remedial Investigation Report, 8801 E. Marginal Way South, Tukwila,WA, Agreed Order #6069, prepared by AMEC Earth & Environmental, Inc. for Paccar, December 15, 2010.

Site Name8801 East Marginal Way South Site   
Draft Document:  Stormwater System Investigation-First Quarterly Data Report; Insurance Auto Auctions 8801 E. Marginal Way S. Site Tukwila, Washington,  Prepared by Windward Environmental for Insurance Auto Auctions Inc., August 27, 2010.

Site NameIndustrial Container Services Site   
Draft Document:  Remedial Investigation/Feasibility (RI/FS) Work Plan; Industrial Container Services/Former NW Cooperage Site, Seattle, Washington, Submitted by Dalton, Olmsted and Fuglevand, Inc. for Herman and Jacqualine Trotsky and Industrial Container Services – WA, LLC, July 16, 2010.    

Site NameBoeing Isaacson Thompson Site   
Draft Document:  Ecology Review Draft Work Plan; Remedial Investigation/Feasibility Study; Boeing Isaacson-Thompson Site, Tukwila Washington, submitted by Landau & Associates for the Boeing Company, June 22, 2010.    

Site NameEarly Action Area-5 Terminal 117
Draft Document:  Revised Engineering Evaluation/Cost Analysis Draft Final, January 2010.

Site Name:  South Park Landfill
Draft Document: Remedial Investigation/Feasibility Study Work Plan, South Park Landfill, Seattle, Washington, Submitted by Farallon Consulting, L.L.C. for South Park Property Development, LLC and the City of Seattle, Seattle Public Utilities, September 1, 2009.
 
Site Name:  Jorgensen Forge
Draft Document:  Draft Source Control Evaluation Addendum Report, Jorgensen Forge Facility, December 2009
  
Site Name: Crowley Marine Services 8th Avenue South Site
Draft Document:  Draft Remedial Investigation/Feasibility Study Work Plan, 8th Avenue Terminals, Inc. Site, Seattle, WA, December 10, 2009

Site Name: Glacier Northwest, Inc.-Reichhold, Inc. Site
Draft Document:  Historical Storm Water Pipe Investigation Glacier Northwest, Inc.-Reichhold, Inc. Site 5900 West Marginal Way SW, Seattle, Washington, December 2009

Site Name: Glacier Northwest, Inc.-Reichhold, Inc. Site
Draft Document:  Draft Summary of Existing Information and Data Gaps Report, October 2009

Site Name: Boeing Isaacson Thompson Site
Draft Document:  Property Boundary Investigation, Thompson-Isaacson Property, Tukwila, Washington, September 2009
 
Site Name: Boeing Isaacson Thompson Site
Draft Document:  Data Summary Report, Thompson-Isaacson Property, Tukwila, Washington, September 2009