
Infiltration trenches with perforated pipe must be registered with Ecology. They must be designed, constructed, operated, and maintained according to either the current Stormwater Management Manual for Western (2005) {SMMWW} or Eastern (2004) Washington or an equivalent manual approved by Ecology (www.ecy.wa.gov/programs/wq/stormwater/tech.html).
Below is a summary of the treatment requirements in Western WA for designing an infiltration trench for rule authorization:
For soils to be adequate for treatment they must meet the design standards in the SMMWW (SSC-6-9, vol. III, p.3-84, 85) www.ecy.wa.gov/biblio/0510031.html:
Contact us for more information
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.