
Note: unless otherwise specified, the files below are available in Adobe Acrobat (.PDF file) format. To view and/or print PDF files, you first will need to download and install Adobe Acrobat Reader.
Once Ecology and the Committee completed the revision process Ecology held a public comment period from November 7, 2007 to January 11, 2008. During this time Ecology also hosted two informational workshops and public hearings on its proposed permit: one in Kennewick on December 10th, and one in Ellensburg on December 11th. A public hearing followed each workshop.
During the revision process the Permit Advisory Committee (Committee) gathered input from the stakeholders. The Committee held four meetings and reviewed a series of drafts of the proposed new permit.
The Department of Ecology (Ecology) began the permit revision process. We worked with a permit advisory committee to revise the permit.
The previous version of the permit expired in May 2007:
- Permit (expired version)
- Fact Sheet
- Response to Public Comments
- Pesticide Information:
- Fluridone Treatment Letter
- GreenClean Algaecide Modification Letter (Final)
- Special Local Needs Registration for Magnacide H Herbicide (active ingredient acrolein)
For more information please contact:
Andrew Kolosseus
Washington State Dept. of Ecology
Water Quality Program
PO Box 47600
Olympia, WA 98504-7600
(360) 407-7543
Email: akol461@ecy.wa.gov
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.