Click to go to our Card-sort Study

 

Aerial farm photo.

Reissuing the Irrigation System Aquatic Weed Control NPDES General Permit

Reissuing the Permit - Timeline

Note: unless otherwise specified, the files below are available in Adobe Acrobat (.PDF file) format. To view and/or print PDF files, you first will need to download and install Adobe Acrobat Reader.

Draft Permit Review

Once Ecology and the Committee completed the revision process Ecology held a public comment period from November 7, 2007 to January 11, 2008.  During this time Ecology also hosted two informational workshops and public hearings on its proposed permit:  one in Kennewick on December 10th, and one in Ellensburg on December 11th. A public hearing followed each workshop.

Permit Revision Process

During the revision process the Permit Advisory Committee (Committee) gathered input from the stakeholders. The Committee held four meetings and reviewed a series of drafts of the proposed new permit.

Expired Permit

The Department of Ecology (Ecology) began the permit revision process. We worked with a permit advisory committee to revise the permit.

The previous version of the permit expired in May 2007:

 

For more information please contact:

Andrew Kolosseus
Washington State Dept. of Ecology
Water Quality Program
PO Box 47600
Olympia, WA 98504-7600
(360) 407-7543
Email:  akol461@ecy.wa.gov

 

Back to top of page

Last updated February 2008