2016 Update to the Stormwater Management Manual for Eastern Washington

Ecology is supporting and leading the effort to update the 2004 Stormwater Management Manual for Eastern Washington (manual) as it has been over 10 years since the manual was written. The intent of this current effort is to update certain sections of the manual to incorporate advances in stormwater management, apply lessons learned with the current manual, and streamline for ease of use. This is not intended to be a wholesale rewrite.

The following provides Ecology’s early thinking on the update process in advance of the first kick-off meeting scheduled on January 8, 2016 in Moses Lake. The update to the manual is expected to follow a similar process taken in 2001-2004 when the manual was originally produced.

These ideas are open for comment and may change based on the discussion at this first meeting.

2004 Process

Ecology will fund and manage a consultant team to draft the language to be considered and used in the updated manual.

A (approximately ten-person) steering committee will be formed to:

The steering committee membership will be open to interested and available Permittees, tribes, NGOs, technical experts, state/federal agencies.

Those not on the steering committee will be provided the opportunity to be involved as well, through review and comment on draft documents/language and participate at meetings or workshops.

Content Update – preliminary thoughts

Update the UIC section – Ch 5.6

Update existing BMP guidance

Move to an electronic format

Schedule

January 8, 2016 – Initial kick-off meeting.

Future meetings TBD

Return to Top

How to Get a Copy of the Stormwater Management Manual for Eastern Washington (2004)

You can download and print the Stormwater Management Manual for Eastern Washington or you may purchase it from the Department of Printing (Publication Number 04-10-076). 

Corrections and Clarifications to the Stormwater Management Manual for Eastern Washington

Chapter 2 - Core Elements for New Development and Redevelopment

Chapter 4 - Hydrologic Analysis
     Isopluvial maps with Township and Range

Chapter 5 - Runoff Treatment Facility Design

Chapter 6 – Flow Control Facility Design

Chapter 7 - Construction Stormwater Pollution Prevention

Return to Top

Background

Ecology’s Stormwater Management Manual for Western Washington was originally published in 1992 and updated in August 2001.  Ecology initially proposed to update it to cover the entire state of Washington. Eastern Washington representatives requested that Ecology instead create a separate manual for the eastern portion of the state.

Based upon these requests and upon recognition of the significantly different climate, hydrology and geology of eastern Washington, Ecology agreed to develope the Stormwater Management Manual for Eastern Washington to address the significant differences in conditions that affect stormwater compared to western Washington.

Discussions at various conferences, meetings and forums to determine the best method to accomplish this effort. A chartering meeting was held in June 2001 to formalize the structure and process for preparing the Manual for eastern Washington. The meeting was attended by more than 70 representatives of 17 cities, 11 counties and 5 federal and state agencies with interests in stormwater management in eastern Washington.

The chartering meeting established a ten-person Steering Committee with several alternate members to lead the overall effort; it also created two Subcommittees: one for leading the preparation of the Technical Stormwater Manual, and another for leading the preparation of a Model Municipal Stormwater Program. Ecology agreed to fund the hiring of a consultant team to support the development and preparation of the documents and to assist the Steering Committee and Subcommittees with meeting coordination, public involvement and related project tasks. Proposals were received by four consultant teams in October 2001; the Steering Committee selected the team lead by Tetra Tech/KCM of Spokane.

A project kick-off meeting was held on November 7, 2001 with members of the Steering Committee, Ecology, and the consultant team. The scope of work for the project and a proposed production schedule were prepared; a budget was prepared and the work began. A stakeholder workshop was held on November 29, 2001 to inform interested parties about the project efforts, the regulatory requirements, the schedule for meetings, and the document production format. After the introductory sessions, concurrent meetings of the Subcommittees were held to begin the development of the Manual and the Model Program. Meetings were held at least once per month to review drafts and updates for each chapter of each document. Periodic presentations were made to address special stormwater management issues. These efforts resulted in draft documents being submitted for public review in fall 2002.

Following the public comment period, the subcommittees reviewed all of the comments received on both of the documents and agreed to minor revisions to the Model Program and substantive revisions to the Manual. The final Model Program was published in September 2003. The Manual underwent a second round of public review in summer 2003. The Stormwater Management Manual for Eastern Washington (2004) is the result of the subcommittee’s final review of those comments.

Return to Top

Technical Assistance on the Manual Stormwater Management Manual for Eastern Washington

For questions on chapters 1-6 and 8, contact Doug Howie at douglas.howie@ecy.wa.gov or 360-407-6444.

Foroozan Labib (foroozan.labib@ecy.wa.gov or 360-407-6439) can also assist with questions on chapters 4 and 6.

For questions on chapter 7, contact Amy Moon at amy.moon@ecy.wa.gov or 360-407-6467.