Water Quality photo identifier

Water Quality Program

Municipal Stormwater General Permits

Urban areas that collect stormwater runoff in municipal separate storm sewers (MS4s) and discharge it to surface waters are required to have a permit under the federal Clean Water Act.

The Environmental Protection Agency (EPA) stormwater regulations established two phases--Phase I and Phase II--for the municipal stormwater permit program.

The Department of Ecology develops and administers National Pollutant Discharge Elimination System (NPDES) municipal stormwater permits in Washington State.

The Municipal General Permit stormwater program requirements include the following:

  • Public Education & Outreach.

  • Public Involvement.

  • Illicit Discharge Detection & Elimination (IDDE).

  • Construction Site Stormwater Runoff Control.

  • Pollution Prevention, Good Housekeeping, and Operation and Maintenance.

  • Post Construction Stormwater Management for New Development & Redevelopment, including Low Impact Development (LID).

  • Monitoring.

  • Structural Stormwater Controls (Phase I only).

  • Source Control (Phase I only).

 


 


Public Comments received on Draft Phase I and Phase II Permits

 

Draft Municipal Stormwater General Permits
 

Draft Stormwater Management Manual for Western WA

2012 Municipal Stormwater Permits Reissuance


Getting Us to Clean Water: Finding and Fixing Problems



Washington Waters - Ours to Protect

Informal LID & Stormwater Monitoring Comments

Control of Toxic Chemicals in Puget Sound

Fiscal Year 2011 Stormwater Grant Program