Preliminary and Formal Drafts - Eastern Washington Municipal Stormwater Permit

Phase II Eastern Washington 2006 Formal Draft Permit Issuance

Public comments on the 2006 Draft Municipal Stormwater Permits

Unless otherwise specified, the following documents are available in Adobe Acrobat (.PDF file) format. To view and/or print PDF files, you first will need to download and install Adobe Acrobat Reader from this link.

Ecology posted the revised, formal draft of the permit on February 15, 2006.  They accepted public comments on the permit through May 19, 2006.  Ecology issued the final permit in January 2007 after considering all public comments and making final changes to the formal draft permit.

Formal Draft Permit

Ecology solicited public comment on the Formal Draft Phase II Municipal Stormwater Permit for Eastern Washington from February 15 through May 19, 2006.

Ecology hosted two general public workshops on the formal draft permit during the public comment period.  The purpose of the workshops was to explain the permit, to inform participants of how this draft of the permit has changed from the previous draft of the permit, and to answer questions. Ecology did not accept formal oral testimony or comments on the Draft Permit or Fact Sheet at the public workshops.

Ecology also held two public workshops specifically for the public entities who are not cities, towns, or counties that may also be required to obtain coverage under this permit.  Ecology did not accept formal oral testimony or comments on the Draft Permit or Fact Sheet at these workshops.  The purpose of the workshops was to explain the general permit, to go through the stormwater management program requirements for these entities, and to answer questions.


Phase II Eastern Washington Preliminary Draft Permit

Public comments on the Preliminary Draft Eastern Washington Municipal Stormwater Permit

Unless otherwise specified, the following documents are available in Adobe Acrobat (.PDF file) format. To view and/or print PDF files, you first will need to download and install Adobe Acrobat Reader from this link.

Ecology solicited public comment on the Preliminary Draft Phase II Stormwater Permit for Eastern Washington from July 13, 2005 - October 14, 2005. Ecology posted the revised, formal draft of the permit on February 15, 2006.

Preliminary Draft Permit

Ecology considered all comments received during the comment period, revised the permit language, and issued a final draft permit for public review in February 2006. Ecology issued the final permit in January 2007.

Ecology hosted two public workshops on the Preliminary Draft Permit: Monday, September 26, 2006 at the Spokane Regional Health District Auditorium, 1101 West College Avenue; and Thursday, September 29, 2006 at the Hal Holmes Community Center, 201 North Ruby Street in Ellensburg.

Contact us for more information

Back to top of page

    Last updated March 2010