

Waterbody |
WRIA(with link to EAP's Watershed Planning - WRIA Links Page) |
Available Reports |
|
TMDL Documentation (PDF) |
||
|
TMDL Documentation (PDF) Reducing Phosphorus Pollution to Improve Water Quality (Water Quality website) |
||
| Medical Lake | Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load | |
|
TMDL Documentation (PDF): |
||
|
Project on hold |
Moses Lake Ground Water TMDL Study
Quality Assurance Project Plan: Moses Lake Phosphorus TMDL Study Reducing Phosphorus Pollution to Improve Water Quality (Water Quality website) |
|
|
TMDL Documentation (PDF) |
||
| Snake River | Total Maximum Daily Load for Lower Snake River Total Dissolved Gas |
Contact us for more information
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.