Provide healthy and safe work environments complementary to host eco-systems.

Objective - Balance Energy Consumption with Energy Production

Back to Goal I

STRATEGIES ACTION STEPS WHO WHEN
1. Require all computers, calculators and other office equipment be turned off at night, on weekends and holidays and all other times when employees are away from their work stations for extended periods of time. a. Write and adopt an implementing policy.
b. The policy will be implemented by all staff and reinforced through program management.
Jay Shepard

Program Managers
First 6 months
2. Establish a "turn-it-off" practice to reduce energy drains in unused office spaces and conference rooms. a. Purchase reminder stickers to be placed on switch plates and outlets throughout all Ecology facilities.
b. Place reminders on switch plates and outlets.
c. Install motion sensors that turn lights off after a certain amount of time.
d. Educate flex time staff about turning on specific banks of lights during office off-hours
Facilities

Building services, office managers
Reg. Sus. Teams
First 6 months
3. Purchase 20% bio-diesel fuel for the Lacey building generator. a. Identify fuel source
b. Begin Purchase
Facilities Second 6 months
4. Remove and recycle all refrigerators manufactured before 1992. Purchase one Energy Star refrigerator for each Lacey Building kitchenette. a. Remove old units
b. Install Energy Star units
Program management Second 6 months
5. Evaluate the use of small appliances in kitchenettes for electrical “plug drain” and identify alternatives. Tie outlets to the timed shut off system in the building. a. Determine electricity plug drain from small appliance use.
b. Tie kitchenette outlets to timed shutoff.
Building Services
Regional Sus. Teams
First 6 months
6. Investigate the feasibility and cost effectiveness of installing on-demand hot water heaters in buildings or replacing existing hot water tanks with new “Energy Star” tanks. To Be Determined Building Services with Sustainability Team assistance Second 6 months
7. Purchase green power for Ecology facilities through savings realized from energy conservation efforts. a. Discuss cost impact and opportunities with programs.
b. Calculate cost savings that could be applied to the purchase of green power.
Building Services,
Sustainability Team,
Programs
Second 6 months
8. Replace single pane windows in the Eastern Regional Office Building with Low-Emissive Argon Double pane windows. (Budgeted) a. Release bid request
b. Award bid
c. Manage installation
Facilities Second year

Anticipated Outcomes

  1. 4% reduction in energy consumption per year
  2. 8% of the electricity purchased will be from "green" power sources
  3. Fossil fuel comsumption in facilities will be reduced by 5%
Back to top

Back to Goal I